George Washington Memorial Parkway - All Documents and Projects

National Capital » Maryland, Virginia, District of Columbia

Listed in the table below are plans or projects and associated documents that have been posted to the public for the selected NPS unit. Click on the project title for more information on the whole project or on the document title for information on the specific document.

For general information, use the 'Park/Unit Information' link to the left to go to the park's main internet page to access park information not related to park planning (for example, park brochures, lodging and campground reservations, and general park information).

Project Title Document Title Review End
Great Falls Park General Management Plan/Environmental Impact Statement Great Falls Park Draft General Management Plan/EIS Dec 15, 2005
Rehabilitate Arlington House, Outbuildings and Grounds (2006-2013) Rehabilitation of Arlington House, Outbuildings and Grounds Jul 21, 2006
Jones Point Park Environmental Assessment Jones Point Park Environmental Assessment, June 2007 Jul 30, 2007
Great Falls Park General Management Plan/Environmental Impact Statement Great Falls Park Final General Management Plan/EIS Feb 06, 2008
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Public Scoping Newsletter May 23, 2008
Gravelly Point and Roaches Run Environmental Assessment Past Documents - 2008 Public Scoping Draft Gravelly Point, Roaches Run Waterfowl Sanctuary, Mount Vernon Trail and Long Bridge Park EA Dec 12, 2008
GRFA Reconstruct North Ramp and Entryway and courtyard Great Falls Park Visitor Center Access Path Ramp and Courtyard Rehabilitation Jun 19, 2010
GLEC MacArthur Multi-use Trail Realignment Fall 2010. GLEC MacArthur Multi-use Trail Realignment Sep 24, 2010
Fort Hunt Park Site Development Plan EA Public Scoping Meeting Presentation Boards Mar 11, 2011
Fort Hunt Park Site Development Plan EA September 2011 Environmental Assessment/Assessment of Effect Nov 05, 2011
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Alternative Concepts Newsletter Jun 20, 2012
Gravelly Point and Roaches Run Environmental Assessment 2012 Public Scoping Draft Gravelly Point and Roaches Run EA Jun 22, 2012
Fort Hunt Park Site Development Plan EA June 2012 Update Newsletter - New Alternative Concepts Jul 28, 2012
Arlington County and Vicinity Non-Motorized Boathouse Facility EA 2012 Public Scoping Newsletter - Arlington County and Vicinity Non-Motorized Boathouse Facility EIS Sep 30, 2012
GLEC MacArthur Multi-use Trail Realignment January 2013. MacArthur Boulevard Shared-Use Path at Glen Echo Park Environmental Assessment/Assessment of Effect Feb 08, 2013
National Airport Runways 4-22 and 15-33 Safety Enhancements Statement of Findings for Wetlands Runway 4-22 and Runway 15-33 Safety Area Enhancements Apr 25, 2013
CLBA Rehabilitation of Roof and Installation of Fire Suppression and Climate Management System CLBA Documents for Scoping Period Jan 03, 2014
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Draft Dyke Marsh Wetland Restoration and Long-term Management Plan/EIS Mar 18, 2014
MVT Safety Improvements at TRIS Mount Vernon Trail Safety Improvement Project at Theodore Roosevelt Island Parking Lot Apr 22, 2014
Memorial Circle Transportation Plan and Environmental Assessment Issue Areas Map Sep 15, 2014
Memorial Circle Transportation Plan and Environmental Assessment Public Scoping Newsletter Sep 30, 2014
George Washington Memorial Parkway Proposed Recreational Fee Rate Increase at Great Falls Park George Washington Memorial Parkway Proposed Recreational Fee Rate Increase at Great Falls Park Feb 05, 2015
Fort Hunt Park Site Development Plan EA Winter 2015 Revised Alternative Concepts Mar 04, 2015
Memorial Circle Transportation Plan and Environmental Assessment 2015 Design Concepts Mar 10, 2015
CLBA Rehabilitation of Roof and Installation of Fire Suppression and Climate Management System Clara Barton House Rehabilitation of Roof and Installation of Fire Suppression and Climate Management System EA Apr 08, 2015
Fort Hunt Park Site Development Plan EA Fort Hunt Park Site Development Plan Environmental Assessment Aug 07, 2015
Arlington House and Site Rehabilitation 2016 Rehabilitate Arlington House, Public Scoping Meeting Nov 13, 2015
Jones Point Park Recreation Plan Boards and Drawings Dec 04, 2015
Jones Point Park Recreation Plan Public Meeting Press Release Dec 04, 2015
Gold Star Mothers Monument Additional Scoping Materials for Gold Star Mothers Monument Site Selection Dec 11, 2015
Gold Star Mothers Monument Site Selection Analysis for the Gold Star Mothers Commemorative Work Dec 11, 2015
Gold Star Mothers Monument Public Scoping for Site Selection Presentation Dec 11, 2015
Arlington Memorial Bridge Rehabilitation Environmental Assessment The Arlington Memorial Bridge Rehabilitation Environmental Assessment May 16, 2016
2018 GWMP North Section Rehabilitation EA George Washington Memorial Parkway North Section Rehabilitation Scoping Period Jul 08, 2016
Potomac Yard Metro Station Statement of Findings for Floodplains and Wetlands for the Proposed Potomac Yard Metrorail Station Jul 11, 2016
Arlington House and Site Rehabilitation 2016 GWMP Arlington House Rehabilitation EA Sep 19, 2016
Jones Point Park Recreation Plan Draft Jones Point Park Recreation and Visitor Services Plan Sep 23, 2016
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial EA Site Selection Public Scoping, Comments, and Report (6/23-7/24) Jul 24, 2017
Theodore Roosevelt Island Cultural Landscape Report and Environmental Assessment Public Scoping Newsletter and Open House Information Boards Sep 08, 2017
MS4 Chesapeake Bay and Local TMDL Action Plans GWMP Consolidated TMDL Action Plan Sep 30, 2017
MS4 Chesapeake Bay and Local TMDL Action Plans GWMP Chesapeake Bay Action Plan Sep 30, 2017
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Wetland Statement of Findings for Dyke Marsh Wetland Restoration - Phase 1 Nov 02, 2017
Fee Increases at Great Falls Park Public invited to comment on proposed fee increases at Great Falls Nov 06, 2017
Dominion Energy Virginia Crystal City Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Dominion Crystal City NRDAR Settlement Agreement Mar 09, 2018
Dominion Energy Virginia Crystal City Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Draft Dominion Crystal City Damage Assessment and Restoration Plan (DARP) Mar 09, 2018
ICC-B Stream Restoration ICC-B Stream Restoration, Public Scoping Meeting Mar 22, 2018
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial EA-Design Scoping Notice (3/13-4/13) Apr 13, 2018
Theodore Roosevelt Island Cultural Landscape Report and Environmental Assessment Theodore Roosevelt Island Cultural Landscape Report and Environmental Assessment May 03, 2018
Langley Fork Park Land Exchange Langley Fork Park Land Exchange EA May 11, 2018
2018 GWMP North Section Rehabilitation EA 2018 GWMP North Section Rehabilitation EA Jul 14, 2018
Arlington County and Vicinity Non-Motorized Boathouse Facility EA Arlington County and Vicinity Boathouse Environmental Assessment Jul 30, 2018
Construct New Comfort Station at U. S. Marine Corps War Memorial NPS Seeks Public Comments on a Proposed Comfort Station near the U.S. Marine Corps War Memorial Oct 17, 2018
RiverRenew Remediate Alexandria's Combined Sewer Outfalls NPS Seeks Comments on a Proposed Stormwater Project at Jones Point Park Oct 25, 2018
RiverRenew Remediate Alexandria's Combined Sewer Outfalls Remediate Alexandria's Combined Sewer Outfalls Oct 25, 2018
Pepco Potomac River Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Draft DARP for the Pepco Oil Spill Dec 10, 2018
Memorial Circle Transportation Plan and Environmental Assessment Memorial Circle Safety Improvements Environmental Assessment Feb 18, 2019
South Turkey Run Park - Concept Plan Claude Moore farm area of Turkey Run Park - Public Meeting #1 May 25, 2019
ICC-B Stream Restoration Parkland Restoration Plan Environmental Assessment Jun 24, 2019
RiverRenew Remediate Alexandria's Combined Sewer Outfalls Environmental Assessment - RiverRenew Remediate Alexandria's Combined Sewer Outfalls Jul 19, 2019
Southern George Washington Memorial Parkway Safety Study George Washington Memorial Parkway Safety Study (Summer 2019) Aug 21, 2019
South Turkey Run Park - Concept Plan South Turkey Run Park - Public Meeting #2 Oct 26, 2019
National Desert Storm and Desert Shield Memorial NDSDSM Section 106 Consulting Parties Meeting and Public Comments - 11.12.2019 Nov 26, 2019
Southern George Washington Memorial Parkway Safety Study Public Meeting Materials (Winter 2019) Jan 10, 2020
National Desert Storm and Desert Shield Memorial NDSDSM Letter of Determination of Effect Apr 01, 2020
Long Bridge Project Long Bridge Project - Wetland Statement of Findings Jun 22, 2020
Chesapeake Bay and Local TMDL Action Plans - Get Involved TMDL Reports Oct 02, 2020
National Desert Storm and Desert Shield Memorial National Desert Storm and Desert Shield Memorial Environmental Assessment Mar 08, 2022
National Desert Storm and Desert Shield Memorial National Desert Storm and Desert Shield Memorial Environmental Assessment Oct 07, 2022
Potomac Yard Metro Station Notification of Realty Action (NORA) Dec 23, 2022
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment Public Scoping (Dec '22 - Jan '23) Jan 18, 2023
Notice of Realty Action - Potomac Yard Metro Station Land Exchange Notice of Realty Action (NORA) Documents for Review Jan 23, 2023
Rehabilitate Clara Barton National Historic Site Schematic Design Alternatives Aug 25, 2023
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment GWMP South Section & MV Trail Improvement Assessment of Effect Sep 01, 2023
WMATA Trolley Trestle Bridge Demolition WMATA Trolley Trestle Bridge Demolition Sep 24, 2023
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment George Washington Memorial Parkway South Section (South Parkway) and Mount Vernon Trail Improvement Plan/Environmental Assessment Oct 24, 2023
Rehabilitate Clara Barton National Historic Site Assessment of Effect Report (2024) Feb 24, 2024
Glen Echo Park EA Public Scoping (Virtual Public Meeting) Jan 24, 2025 *
MS4 Virginia MS4 VA 2018-2023 Action Plan Oct 01, 2028 *
MS4 Maryland 2018 - 2023 MD Permit Nov 01, 2028 *
Rehabilitate Arlington House, Outbuildings and Grounds (2006-2013) Finding of No Significant Impact
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Public Scoping Comment Analysis Report
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Alternative Concepts Public Comment Summary
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Draft Plan/EIS Public Meeting Presentation
2018 GWMP North Section Rehabilitation EA 2008 EA for North Parkway Rehabilitation
Arlington County and Vicinity Non-Motorized Boathouse Facility EA GWMP Arlington County & VicinityBoathouse Final Public Scoping Analysis Report
National Desert Storm and Desert Shield Memorial NCPC materials
Arlington National Cemetery Millennium Expansion Plan EA and FONSI
Dominion Energy Virginia Crystal City Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Final Dominion Crystal City Damage Assessment and Restoration Plan (DARP)
Memorial Circle Transportation Plan and Environmental Assessment Memorial Circle Safety Improvements Executed FONSI 06072019
Pepco Potomac River Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Damage Assessment and Restoration Plan/Environmental Compliance Analysis for the January 2011 Potomac Electric Power Company Potomac River Substation Oil Spill in Alexandria, Virginia
RiverRenew Remediate Alexandria's Combined Sewer Outfalls RIVERRENEW: AN INFRASTRUCTURE INITIATIVE TO REMEDIATE ALEXANDRIA'S COMBINED SEWER SYSTEM
Georgetown Pike Footpath Feasibility Study Appendices
Southern George Washington Memorial Parkway Safety Study GWMP Traffic and Safety Context Sensitive Solution Assessment
Rehabilitate Clara Barton National Historic Site CLBA Cultural Landscape Report July 2023
MS4 Maryland ms4 md annual report 2023
Capital Crescent Trail Erosion Repairs
Jones Point Park Environmental Assessment Jones Point Park Hydrology Study, Drainage Maps
Great Falls Park General Management Plan/Environmental Impact Statement Record of Decision
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Record of Decision
Arlington Memorial Bridge Rehabilitation Environmental Assessment Programmatic Agreement
Small Parks Management Strategies Small Parks Management Strategies
Pepco Potomac River Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Administrative Record Index
Glen Echo Park - Traffic and Pedestrian Safety Context Sensitive Solutions Assessment Glen Echo Park - Traffic and Pedestrian Safety Context Sensitive Solutions Assessment
South Turkey Run Park - Concept Plan South Turkey Run Park Concept Plan
MS4 Virginia MS4 VA other reports and documents
2018 GWMP North Section Rehabilitation EA North Parkway Design Documents
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment August 9, 2023 GW Parkway South & MV Trail - Section 106 Consulting Party Meeting
Rehabilitate Clara Barton National Historic Site January 2024 - CLBA 312325 Final Schematic Design Report
MS4 Maryland ms4 md action plan (Signed 2020)
MS4 Maryland ms4 md training material
MS4 Virginia MS4 Annual Report Fy2023
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment GEORGE WASHINGTON MEMORIAL PARKWAY SOUTH SECTION AND MOUNT VERNON TRAIL IMPROVEMENTS PLAN - FONSI
DCA Improvements EA Signed FONSI
Great Falls Park General Management Plan/Environmental Impact Statement Public Newsletter for Great Falls General Management Plan EIS October 2005
Jones Point Park Environmental Assessment Jones Point Park Tree Survey
Jones Point Park Environmental Assessment Jones Point Park Permit Between NPS & City of Alexandria
Jones Point Park Environmental Assessment Press Release June 13, 2007
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Public Scoping Presentation
GLEC MacArthur Multi-use Trail Realignment January 24, 2013 Public Meeting Display Boards
East & West Blvd & Northdown Rd Rehab Summer 2013 Construction Schedule
Paved Trail Plan NCR Paved Trail Plan - final
National Desert Storm and Desert Shield Memorial NCPC Site Selection December 7, 2017
National Desert Storm and Desert Shield Memorial Commission of Fine Arts Presentation June 21, 2018
2018 GWMP North Section Rehabilitation EA GWMP North Section Rehab - Public Open House Meeting Boards
Authorizing the use of E-bikes Within George Washington Memorial Parkway compliance documentation
MS4 Virginia MS4 VA Annual Reports (previous years)
I-495 NEXT Project Final Environmental Assessment
Langley Fork Park Land Exchange Response to Public Comments
MS4 Virginia MS4 Guidance and helpful information
MS4 Virginia MS4 VA FY2022 Annual Report
Rehabilitate Clara Barton National Historic Site July 9 Consulting Parties Meeting Presentation and Video
Rehabilitate Clara Barton National Historic Site ACHP Electronic Section 106 Submittal
Lockhouse 8 Electric
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Notice of Intent to Prepare an Environmental Impact Statement
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Alternative Concepts Meeting Powerpoint Presentation
Dominion Energy Virginia Crystal City Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Administrative Record
ANC Millennium Area Headstone Removal Project FONSI
Theodore Roosevelt Island Cultural Landscape Report and Environmental Assessment TRI Cultural Landscape Report FONSI
2018 GWMP North Section Rehabilitation EA Finding of No Significant Impact
Southern George Washington Memorial Parkway Safety Study GWMP Traffic Data
MS4 Virginia MS4 VA Annual Report - 2020
I-495 NEXT Project Executed FONSI
MS4 Virginia updated MS4 Mapping (2023)
Rehabilitate Clara Barton National Historic Site Consulting Parties Meeting #4
MS4 Maryland ms4 md annaul report 2022
MS4 Virginia MS4 VA 2024 Annual Report
Chain Bridge Repair and Repainting
Jones Point Park Environmental Assessment Jones Point Park Wetlands Study
Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge Exclosure Photo
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Alternative Concepts Meeting Posters
Arlington County and Vicinity Non-Motorized Boathouse Facility EA Earlier Work - 2002 Arlington Boathouse Feasibility Study
GLEC MacArthur Multi-use Trail Realignment January 7, 2013. Press Release: Public Availability of an EA/AoE
CLBA Rehabilitation of Roof and Installation of Fire Suppression and Climate Management System Finding of No Significant Impact
Jones Point Park Recreation Plan Jones Point Park Recreation and Visitor Services Plan
Dominion Energy Virginia Crystal City Substation Oil Spill Damage Assessment and Restoration Plan (DARP) NPS Press Release 2.15.18 Public Comment Invited on Restoring Roaches Run Waterfowl Sanctuary after Oil Spill
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial Site Selection Phase - Site Design Studies Review- -CFA Meeting and Response, March 15th, 2018
ANC Millennium Area Headstone Removal Project Millennium EA June 2013
ICC-B Stream Restoration FONSI George Washington Memorial Parkway Parkway Restoration Plan
MS4 Virginia MS4 Mapping
MS4 Virginia MS4 VA 2021 Annual Report
MS4 Virginia MS4 Training Materials
2018 GWMP North Section Rehabilitation EA Memo to File - North Parkway Trees in Median
National Desert Storm and Desert Shield Memorial National Park Service Issues Finding of No Significant Impact (FONSI) for Desert Shield and Desert Storm Memorial Environmental Assessment
Rehabilitate Clara Barton National Historic Site APE and Ground Disturbance Maps
Rehabilitate Clara Barton National Historic Site 06.14.2023 - Historians Roundtable Meeting
Rehabilitate Clara Barton National Historic Site Materials from the January 30, Consulting Parties Meeting
Repairs to Canal Prism and Canal Berm at Chain Bridge
U.S. Marine Corps War Memorial Rehabilitation US Marine Corps War Memorial Rehabilitation Environmental Assessment
Jones Point Park Environmental Assessment Jones Point Park Hydrology Study, Volume 1 Summary
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Public Scoping Open House Display Boards
Fort Hunt Park Site Development Plan EA Public Scoping Report - Winter 2015
Fort Hunt Park Site Development Plan EA Public Comment Report - Fall 2015
Arlington Memorial Bridge Rehabilitation Environmental Assessment Finding of No Significant Impact - Rehabilitation of Arlington Memorial Bridge
Potomac Yard Metro Station National Park Service - Record of Decision (ROD) Potomac Yard Metro Station
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial Site Selection Study- -NCMAC Meeting, May 16, 2017
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial Site Selection Study- -CFA Meeting, July 20th, 2017
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial Site Selection Study- -NCPC Meeting, July 13th, 2017
National Desert Storm and Desert Shield Memorial National Desert Storm War Memorial Site Selection Study- -CFA Meeting, October 19th, 2017
Mount Vernon Trail Corridor Study Mount Vernon Trail Corridor Study
Southern George Washington Memorial Parkway Safety Study Virtual Neighborhood Educational Event
MS4 Virginia MS4 VA 2023 - 2028 new permit
CC2DCA Environmental Assessment FONSI
MS4 Maryland 2024 MS4 MD Annual Report
Jones Point Park Environmental Assessment Jones Point Park Hydrology Study, Volume 2
Jones Point Park Environmental Assessment Jones Point Park Lead Investigation
Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge Deer Study Site Bulletin
Mount Vernon Trail Extension Environmental Assessment Mount Vernon Multi-Use Trail Extension Feasibility Study
Jones Point Park Environmental Assessment Finding Of No Significant Impact (FONSI)
GLEC MacArthur Multi-use Trail Realignment Final FONSI
2018 GWMP North Section Rehabilitation EA North Section Rehabilitation EA Newsletter
National Desert Storm and Desert Shield Memorial Section 106 Consultation Initiation for National Desert Storm War Memorial
Langley Fork Park Land Exchange Langley Forks Land Exchange FONSI
Arlington County and Vicinity Non-Motorized Boathouse Facility EA Arlington Boathouse Executed FONSI 06072019
Georgetown Pike Footpath Feasibility Study Feasibility Study
Pepco Potomac River Substation Oil Spill Damage Assessment and Restoration Plan (DARP) Compliance Documentation
MS4 Virginia MS4 VA Permit
Clara Barton RFEI Request For Expressions of Interest
Rehabilitate Clara Barton National Historic Site Materials from May 1, 2023 Consulting Parties Meeting
MS4 Maryland ms4 md annual report 2019
MS4 Maryland MS4 MD annual report - 2020
MS4 Maryland ms4 md annual report 2021
Glen Echo Park EA Background Documents
Great Falls Park General Management Plan/Environmental Impact Statement Public Newsletter #1 January 2003
Mount Vernon Trail Extension Environmental Assessment Newsletter Open House
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Draft Plan/EIS Public Meeting Posters
Dyke Marsh Wetland Restoration and Long Term Management Plan/EIS Final Dyke Marsh Wetland Restoration and Long-term Management Plan/EIS
National Desert Storm and Desert Shield Memorial National Capital Memorial Advisory Commission Meeting, Tuesday, May 16, 2017
2018 GWMP North Section Rehabilitation EA Programmatic Agreement
MS4 Virginia TMDL reports
Clara Barton RFEI Press Release
National Desert Storm and Desert Shield Memorial SHPO letter
Rehabilitate Clara Barton National Historic Site Conditions Assessment of Clara Barton National Historic Site
South Section and Mount Vernon Trail Improvement Plan / Environmental Assessment Programmatic Agreement - GWMP South Section and MVT Improvements Plan
* Open for comment.