Parkland Restoration Plan Environmental Assessment


The National Park Service is developing a Parkland Restoration Plan to improve drainage and resolve sedimentation issues on parkland downstream of the Intelligence Community Campus-Bethesda (ICC-B) in Bethesda, Maryland. The purpose of the proposed project is to improve the long-term ecological function and drainage of two stream channels, stabilize a non-natural erosion channel, and resolve sedimentation issues on NPS land that is downstream of ICC-B. The 26.7 acre project area is comprised of lands managed by the George Washington Memorial Parkway and the Chesapeake and Ohio Canal National Historical Park.

The NPS is announcing a 30-day public comment period for the Environmental Assessment to solicit comments on this proposal. The comment period will open on May 23, 2019 and close on June 23, 2019. You may submit comments electronically here or comments can be submitted in writing during the public comment period to:

Superintendent
Attn: ICC-B Environmental Assessment
George Washington Memorial Parkway
700 George Washington Memorial Parkway
c/o Turkey Run Park
McLean, Virginia 22101
 
Comment Period: Closed        May 23, 2019 - Jun 24, 2019
Document Content:
ICC-B_SWM_EA_2019_05_08_508.pdf   (6.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.