Project Links
George Washington Memorial Parkway » ICC-B Stream Restoration » Document List » Document Contents
ICC-B Stream Restoration, Public Scoping Meeting
The National Park Service is accepting public scoping comments for the beginning stages of an Environmental Assessment (EA) being prepared for the restoration of parkland features adjacent to the Intelligence Community Campus-Bethesda (ICC-B).
Scoping is the first phase in developing an EA for the ICC-B stream restoration project. Scoping comments will help identify any issues, concerns, or ideas regarding the proposed project so they can be considered in the preparation of the EA. After the 30-day public scoping period concludes, the National Park Service will prepare and release a draft EA for public review and comment before finalizing the document.
Comment Period:
Closed
Feb 20, 2018 - Mar 22, 2018
|
Document Content: |
ICC-B EA_Public Scoping Boards_02-16-2018.pdf
(10.9 MB, PDF file)
ICC-B EA_Public Scoping Newsletter_02-16-2018.pdf
(1.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |