GWMP South Section & MV Trail Improvement Assessment of Effect


The National Park Service (NPS), in cooperation with the National Capital Planning Commission (NCPC), is developing a George Washington Memorial Parkway (GW Parkway) South Section and Mount Vernon (MV) Trail Improvements Plan. In compliance with the National Historic Preservation Act Section 106, this Assessment of Effects Report was prepared to evaluate the effects of the proposed action.
 
Comment Period: Closed        Jul 26, 2023 - Sep 1, 2023
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.