Project Links
George Washington Memorial Parkway » Clara Barton Parkway Cantilever Project » Document List » Document Contents
Clara Barton Parkway Cantilever and Glen Echo Overpass FONSI
The National Park Service (NPS) prepared an Environmental Assessment (EA) to evaluate the impacts that will result from implementing the Clara Barton Parkway Cantilever and Glen Echo Overpass Project (the Project). The Project will replace the cantilever structure and reconstruct the adjacent retaining walls on Clara Barton Parkway between Cabin John Parkway and the Macarthur Boulevard exit ramp in Montgomery County, Maryland. The Project will also demolish the Glen Echo Overpass. The statements and conclusions reached in this Finding of No Significant Impact (FONSI) are based on documentation and analysis provided in the EA and associated decision file.
| Document Content: |
|
clba_pkwy_cantilever_FONSI - executed508a.pdf
(25.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
