Project Links
George Washington Memorial Parkway » CLBA Rehabilitation of Roof and Installation of Fire Suppression and Climate Management System » Document List » Document Contents
CLBA Documents for Scoping Period
These documents are made availble to the public during a 30 day public scoping period. There are multiple documents attached.
1. Public meeting notice
2. press release
3. slides from the public scoping meeting
Comment Period:
Closed
Dec 3, 2013 - Jan 3, 2014
|
Document Content: |
slides from the public scoping meeting
(7.1 MB, PDF file)
public meeting notice
(135.2 KB, PDF file)
press release
(23.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |