Project Links
George Washington Memorial Parkway » Pepco Potomac River Substation Oil Spill Damage Assessment and Restoration Plan (DARP) » Document List » Document Contents
Administrative Record Index
Pepco Potomac River Substation Oil Spill Administrative Record Index
Document Content: |
4. Pepco Final Incident Report to USCG
(310.8 KB, PDF file)
FRN DOJ PEPCO Settlement Agreement 2018-24520.pdf
(181.1 KB, PDF file)
5. Pepco response to DDOE Compliance Directive 4-8-2011
(246.5 KB, PDF file)
PepcoPotomacRiverSubstationOilSpillAnnualReportCY21.pdf
(1.1 MB, PDF file)
Pepco Potomac River Substation Oil Spill Annual CY20.pdf
(890.5 KB, PDF file)
2. Cross Trans MSDS
(163.5 KB, PDF file)
6. Living Classrooms Design Report Trash Cage Interceptor
(8.9 MB, PDF file)
3. District of Columbia Pepco Consent Decree
(995.3 KB, PDF file)
1. Authorized Official Nomination for PEPCO Spill 18Nov2013
(126.1 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |