Project Links
George Washington Memorial Parkway » Arlington National Cemetery Millennium Expansion Plan » Document List » Document Contents
EA and FONSI
As part of the project, the existing stream channels, which are currently severely degraded in some areas, would be restored and integrated into the overall project as a natural landscape amenity. Natural Channel Design (NCD) techniques would be utilized to restore the existing channels. By establishing stable channel geometry and reestablishing a floodplain connection, excessive bank and bed erosion can be arrested, in-stream habitat improved, and the downstream transport of pollutants reduced. Although ~890 trees would be removed, this impact was minimized during planning and an additional 600 trees and 500 shrubs will be planted to help
mitigate for this impact.
Document Content: |
Sect. 106 Correspondence 6.12.12.pdf
(2.9 MB, PDF file)
Headstone Removal Project-executed FONSI 1-11-13.pdf
(757.6 KB, PDF file)
ANMC_EA.pdf
(1.1 MB, PDF file)
ANMC_EA_Appendix_B.pdf
(16.9 MB, PDF file)
ANMC_EA_Appendix_A.pdf
(11.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |