Golden Gate National Recreation Area - All Documents and Projects

Pacific West » California

Listed in the table below are plans or projects and associated documents that have been posted to the public for the selected NPS unit. Click on the project title for more information on the whole project or on the document title for information on the specific document.

For general information, use the 'Park/Unit Information' link to the left to go to the park's main internet page to access park information not related to park planning (for example, park brochures, lodging and campground reservations, and general park information).

Project Title Document Title Review End Project Type
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement PG&E Jefferson-Martin 230 kV Transmission Line Project Settlement Agreement EA Jun 06, 2005 Other
Negotiated Rulemaking for Dog Management at GGNRA Federal Register Notices to Establish the Negotiated Rulemaking Committee Jul 28, 2005 Other
Mori Point Restoration and Trail Plan Mori Point Restoration and Trail Plan EA Mar 31, 2006 Resource Management Plan
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Design Concepts May 30, 2006 Resource Management Plan
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #1 - Spring 2006 May 31, 2006 General Management Plan
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Environmental Assessment (EA) Apr 06, 2007 Resource Management Plan
Dias Ridge Restoration and Trail Improvement Project Dias Ridge Restoration and Trail Improvement Project Aug 03, 2007 Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - February 2007 Aug 01, 2008 General Management Plan
General Management Plan - Golden Gate National Recreation Area Scoping Summary 2006, General Management Plan Aug 01, 2008 General Management Plan
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Spring 2008 Aug 01, 2008 General Management Plan
Fort Funston Site Improvements Scoping Flyer - Construction of New Restroom at Fort Funston Jan 18, 2009 Capital Improvement/New Construction
Crissy Field Center Temporary Relocation Project Crissy Field Center Relocation Jun 12, 2009 Other
Crissy Field Center Temporary Relocation Project Crissy Field Center Temporary Relocation Impact Assessment Jun 12, 2009 Other
Headlands Institute Campus Improvement and Expansion Plan Headlands Institute Campus Improvement and Expansion Plan Final EA Sep 14, 2009 Capital Improvement/New Construction
Point Bonita Suspension Bridge Replacement Project Point Bonita Bridge Replacement Project May 27, 2011 Repair/Rehabilitation
GGNRA Dog Management Plan Draft Dog Management Plan / Environmental Impact Statement May 30, 2011 Implementation Plan - Other
General Management Plan - Golden Gate National Recreation Area Draft General Management Plan/Environmental Impact Statement - September 2011 Dec 09, 2011 General Management Plan
Marin Equestrian Stables Plan Marin Equestrian Stables Plan Environmental Assessment Dec 16, 2011 Other
Ocean Beach Master Plan SPUR Ocean Beach Master Plan Executive Summary Feb 29, 2012 Resource Management Plan
34th America's Cup Event, Parkwide Environmental Assessment for the 34th America's Cup Jul 07, 2012 Other
Alcatraz Ferry Embarkation Project Notice of Intent to Prepare an EIS for the Alcatraz Ferry Embarkation Site Jul 31, 2012 Capital Improvement/New Construction
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands Public Scoping Notice Jan 31, 2013 Other Permit
Fire Management Plan Amendment for Rancho Corral de Tierra DRAFT AMENDMENT TO THE FIRE MANAGEMENT PLAN FOR RANCHO CORRAL DE TIERRA Jul 12, 2013 Fire Management Plan
Fire Management Plan Amendment for Rancho Corral de Tierra Proposed Fire Management Actions for 2013 - Rancho Corral de Tierra Jul 12, 2013 Fire Management Plan
Cosco Busan Recreational Use Restoration Projects Plan NPS Cosco Busan Initial Projects Approved For Funding in San Francisco Jul 31, 2013 Other
General Management Plan - Golden Gate National Recreation Area Draft Programmatic Agreement for National Historic Preservation Act Compliance - September 2013 Nov 25, 2013 General Management Plan
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands Sausalito-Marin City Sanitary District Treatment Upgrade Project EA/IS Dec 13, 2013 Other Permit
Access Reservation System, Muir Woods Public Scoping Announcement - September 4, 2013 Jan 11, 2014 Commercial Services Plan
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Scoping Announcement - September 4, 2013 Jan 11, 2014 Capital Improvement/New Construction
Crissy Field Refresh Planning Planning Goals for Crissy Refresh Effort Feb 16, 2014 Repair/Rehabilitation
GGNRA Dog Management Plan Draft Dog Management Plan/ Supplemental Environmental Impact Statement Feb 18, 2014 Implementation Plan - Other
Interim Compendium Amendment - Commercial Dog Walking Permit Interim Compendium Amendment for Commercial Dog Walking Apr 14, 2014 Other
Ocean Beach Fire Revised Pilot Program Ocean Beach Fire Revised Pilot Program Announcement May 16, 2014 Regulation
Interim Trail Plan, Rancho Corral de Tierra, San Mateo County Draft Rancho Interim Trail Plan Jun 14, 2014 Other Plan
(See PEPC 108243) 2014 Ocean Beach Sand Management Project Detailed Project Description Sep 26, 2014 Other Maintenance Activities
Proposed Fee Increases within Golden Gate National Recreation Area Proposed Fee Increases within Golden Gate National Recreation Area Dec 19, 2014 Fee Collection
Alcatraz Ferry Embarkation Project Draft EIS - February 20, 2015 May 20, 2015 Capital Improvement/New Construction
Rehabilitate Cavallo Point Lodge Historic Building 615, Fort Baker Alternatives for Building 615 Aug 20, 2015 Rehabilitation
Cavallo Point Lodge Demonstration Greenhouse, Fort Baker Greenhouse Site Plan and Views (dated July 16, 2015) Aug 20, 2015 Other
Access Reservation System, Muir Woods Muir Woods Reservation System EA Nov 22, 2015 Commercial Services Plan
Ocean Beach Fire Program Ocean Beach Fire Program Proposal Dec 04, 2015 Regulation
Milagra Battery Trail and Signs, Milagra Ridge Milagra Battery Trail and Signs DRAFT CEQA/NEPA Environmental Compliance Categorical Exemption/Categorical Exclusion Dec 24, 2015 Other Maintenance Activities
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Redwood Creek Trail Realignment and Dias Ridge Extension Project EA, November 2015 Jan 15, 2016 Other Natural/Cultural Resource Activities
Repair and Upgrade City Pump Station #2 , Van Ness and McDowell, Fort Mason CCSF Auxiliary Water Supply System Seismic Upgrade Project Feb 04, 2016 Repair/Rehabilitation
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Extended: PG&E Gas Line-109 Pipeline Replacement Project Environmental Assessment Public Review Period, March 28 - April 15, 2016 Apr 15, 2016 Capital Improvement/New Construction
Crissy Field Centennial Repair, Presidio Schematic Design Apr 22, 2016 Repair/Rehabilitation
Crissy Field Centennial Repair, Presidio Draft Categorical Exclusion Documentation Apr 22, 2016 Repair/Rehabilitation
Vista Point Multi-Use Trail, Fort Baker Vista Point Multi-Use Trail Draft CE Jun 04, 2016 Right-of-Way Permit
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project Draft EIS_R Jul 01, 2016 Construction Permit
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Public Scoping: Muir Woods Salmon Habitat Enhancement & Bridge Replacement Project Presentation - 9/20/16 Oct 21, 2016 Resource Protection
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Sustainable Access Project - Draft Environmental Assessment Dec 05, 2016 Capital Improvement/New Construction
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Muir Woods Road Improvement Project Dec 09, 2016 Reconstruction
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Public Scoping Presentation Jan 31, 2017 Reconstruction
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Scoping Notice, Project Description, and Maps Mar 17, 2017 Repair/Rehabilitation
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Proposal and Draft Categorical Exclusion Apr 21, 2017 Special Use Permit
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Muir Woods Water/Wastewater Service Rehabilitation Draft Environmental Assessment (EA) May 05, 2017 Repair/Rehabilitation
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Draft Environmental Assessment May 18, 2017 Resource Protection
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Muir Woods Road Improvement Project Newsletter #2 Jun 12, 2017 Reconstruction
Proposed Fee Increase at Kirby Cove and Bicentennial Campgrounds, Marin Headlands Proposed Fee Increase at Kirby Cove and Bicentennial Campgrounds Oct 05, 2017 Fee Collection
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Draft Engineering Evaluation/Cost Analysis (EE/CA) Oct 15, 2021 Other Natural/Cultural Resource Activities
Compendium Updates Regarding E-bikes, Parkwide 2021 Superintendent's Compendium Oct 27, 2021 Other Plan
National Park Service Bay Area Air Tour Management Plan (ATMP) Air Tour Management Plan for Golden Gate National Recreation Area, Muir Woods National Monument, Point Reyes National Seashore, and San Francisco Maritime National Historical Park Nov 15, 2021 Air Tour Management Plan
FHWA Stinson Beach Parking Lots Rehabilitation FHWA Stinson Beach Parking Lot Rehabilitation Dec 10, 2021 Capital Improvement/New Construction
Minor Boundary Adjustment Notice of Realty Action (NORA) Map - Notice of Realty Action Aug 08, 2022 Boundary Adjustment
Minor Boundary Adjustment Notice of Realty Action (NORA) Notice of Realty Action Aug 08, 2022 Boundary Adjustment
Remove High Hazard Dam, Construct New Frog Ponds, Remove Non-Native Trees, Tennessee Valley Tennessee Valley Dam Removal and Lower Valley Restoration Project Environmental Assessment Nov 17, 2022 Removal/Demolition
Public Electric Vehicle (EV) Charging Fee Proposal - Public Comment Site Map - NPS-GGNRA Public EV Charging Fee Proposal May 2023 Jun 23, 2023 Fee Collection
Mori Point Restoration and Trail Plan Public Scoping Summary Resource Management Plan
GGNRA Dog Management Plan Public Scoping Comment Analysis Report - 2006 Implementation Plan - Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 7/31/2006 Committee Meeting Other
GGNRA Dog Management Plan Public Scoping Workshops Project Information - 2006 Implementation Plan - Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 5/15/2006 Committee Meeting Other
Golden Gate NRA Fire Management Plan (FMP) EIS Record of Decision for the GGNRA Fire Management Plan Fire Management Plan
Alcatraz Island Historic Preservation & Safety Construction Project Alcatraz Island Historic Preservation & Safety Construction Project Final Environmental Impact Statement (FEIS) Other
General Management Plan - Golden Gate National Recreation Area GMP NOI March 2006 General Management Plan
Dias Ridge Restoration and Trail Improvement Project FONSI - Dias Ridge Restoration and Trail Improvement Project Other
General Management Plan - Golden Gate National Recreation Area Summary of Public Comments on the Preliminary Alternatives General Management Plan
34th America's Cup Event, Parkwide FONSI Other
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Purpose, Need and Objectives - September 2013 Capital Improvement/New Construction
Access Reservation System, Muir Woods Agency/Stakeholder Meeting - September 18, 2013 Commercial Services Plan
Perform Flood Repairs, Stinson Beach 2014_2015 Project Overview Repair/Rehabilitation
Cavallo Point Lodge Demonstration Greenhouse, Fort Baker Email to Stakeholders July 20, 2015 Other
Ocean Beach Erosion Protection Measures - Immediate Action Plan IAP Construction Drawings Routine Maintenance
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Construction Drawings_Set One Repair/Rehabilitation
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs - Engineering Report Repair/Rehabilitation
Interim Trail Plan, Rancho Corral de Tierra, San Mateo County Final Categorical Exclusion - Interim Trail Plan Other Plan
Alcatraz Ferry Embarkation Project Regulatory Agency Concurrence (CA SHPO, BCDC, NMFS) Capital Improvement/New Construction
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project EIS Record of Decision Construction Permit
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Errata Other Natural/Cultural Resource Activities
Compendium Updates Regarding E-bikes, Parkwide 36 CFR 1.4 Definition of electric bicycle Other Plan
GGNRA Dog Management Plan About NEPA and Negotiated Rulemaking Implementation Plan - Other
Negotiated Rulemaking for Dog Management at GGNRA Frequently Asked Questions Other
General Management Plan - Golden Gate National Recreation Area Summer 2008 Public Meetings General Management Plan
Fort Mason Long Term Lease Fort Mason Long Term Lease EA, FONSI, and Errata Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - 1. Fall 2007 General Management Plan
Presidio Trails and Bikeways Master Plan Presidio Trails and Bikeways Master Plan EA, FONSI, and Errata Other
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Press Release regarding Agreement between NPS and Sausalito Capital Improvement/New Construction
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update January 2011 General Management Plan
Alexander Avenue Planning Study, Marin County Alexander Avenue Planning Study Transportation Plan
Caltrans Storm Damage Repairs, State Route 1, Marin County Caltrans Fact Sheets for Four Pending Projects at PM 6.6, 7.7, 8.1, and 10.95 Other Maintenance Activities
Marin Equestrian Stables Plan Marin Equestrian Stables Plan Finding of No Significant Impact (FONSI) Other
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Fort Baker Plan FEIS - Record of Decision Capital Improvement/New Construction
Perform Flood Repairs, Stinson Beach Flood Pictures Repair/Rehabilitation
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Work Summary and Phasing Description Repair/Rehabilitation
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Supporting EA Documents Other Natural/Cultural Resource Activities
GGNRA Dog Management Plan SEIS Public Comment Report - 2014 Implementation Plan - Other
Ocean Beach Fire Program Final Ocean Beach Fire Program Regulation
Access Reservation System, Muir Woods Muir Woods Reservation System Finding of No Significant Impact (FONSI) and Errata Commercial Services Plan
Milagra Battery Trail and Signs, Milagra Ridge FINAL Milagra Battery Trail and Signs CE/CE Package Other Maintenance Activities
Ocean Beach Fire Program Pre-Proposal Scoping and Public Meeting Materials Regulation
Alcatraz Ferry Embarkation Project Comment Analysis Report for the Ferry Embarkation Draft Environmental Impact Statement Capital Improvement/New Construction
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Determination of No Impairment Capital Improvement/New Construction
National Park Service Bay Area Air Tour Management Plan (ATMP) Public Meeting PowerPoint Air Tour Management Plan
Rancho Corral de Tierra Comprehensive Site Management Plan Rancho Corral De Tierra Equestrian Facilities Management Study Comprehensive Management Plan
Trail System Accessible Improvements, Mori Point Repair/Rehabilitation
Negotiated Rulemaking for Dog Management at GGNRA Meeting Summaries Other
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 7/2006 Other
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement Errata Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 4/18/2006 Committee Meeting Other
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 3/2006 Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 10/27/2007 Committee Meeting Other
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Finding of No Significant Impact (FONSI) and Errata Resource Management Plan
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Marin Headlands & Fort Baker TIMP Final EIS Transportation Plan
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Chinese General Management Plan
Headlands Institute Campus Improvement and Expansion Plan Preliminary Cultural Landscape Report for Ft. Cronkhite Capital Improvement/New Construction
GGNRA Dog Management Plan Draft Plan/EIS Open House Meeting Posters March 2011 Implementation Plan - Other
34th America's Cup Event, Parkwide Draft America's Cup People Plan Other
Caltrans Storm Damage Repairs, State Route 1, Marin County Location Map of 2007 and proposed 2012 Tieback Walls Other Maintenance Activities
Cosco Busan Recreational Use Restoration Projects Plan Informational Poster from October 2011 Open House Other
Alcatraz Ferry Embarkation Project Public Scoping Comment Summary Capital Improvement/New Construction
Marin Equestrian Stables Plan 2011 Marin Equestrian Stables Plan Environmental Assessment Public Comments (with redactions) Other
Construct Bus Stops and Upgrade Trail, Muir Beach Public Outreach Capital Improvement/New Construction
Construct Bus Stops and Upgrade Trail, Muir Beach Environmental Compliance Capital Improvement/New Construction
Alcatraz Ferry Embarkation Project Transportation and Circulation Study - Report Only Capital Improvement/New Construction
Access Reservation System, Muir Woods Background Information Commercial Services Plan
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Construction Drawings_Set Two Repair/Rehabilitation
Crissy Field Centennial Repair, Presidio Project Update Memo - May 5, 2016 Repair/Rehabilitation
Crissy Field Centennial Repair, Presidio Public Notification Flyer Repair/Rehabilitation
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E Crystal Springs Seed Mix Capital Improvement/New Construction
Compendium Updates Regarding E-bikes, Parkwide Categorical Exclusion and Approval for Compendium Updates Regarding Electrical Bicycles (e-bikes) Other Plan
Rehabilitation of the Water Tower (AL-001), Alcatraz Repair/Rehabilitation
Demolition and Removal of Nike Missile Site Structures and Utilities, Sweeney Ridge Other Natural/Cultural Resource Activities
Golden Gate NRA Fire Management Plan (FMP) EIS Golden Gate National Recreation Area Fire Management Plan FEIS Fire Management Plan
Negotiated Rulemaking for Dog Management at GGNRA NEPA and Negotiated Rulemaking Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Spanish General Management Plan
Dias Ridge Restoration and Trail Improvement Project Errata - Dias Ridge Restoration and Trail Improvement Project Other
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Marin Headlands and Fort Baker TIMP - Record of Decision Transportation Plan
34th America's Cup Event, Parkwide Host and Venue Agreement between the Event Authority and CCSF Other
34th America's Cup Event, Parkwide FONSI_Errata Other
Fire Management Plan Amendment for Rancho Corral de Tierra GGNRA Fire Management Plan, Final EIS Fire Management Plan
General Management Plan - Golden Gate National Recreation Area Final General Management Plan / Environmental Impact Statement - April 2014 General Management Plan
GGNRA Dog Management Plan Draft Plan/SEIS Open House Meeting Posters - November 2013 Implementation Plan - Other
Ocean Beach Fire Revised Pilot Program NEPA Compliance Document - May 22, 2014 Regulation
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Map of GGNRA Easements Capital Improvement/New Construction
Alcatraz Ferry Embarkation Project Transportation and Circulation Study - Appendices Capital Improvement/New Construction
Access Reservation System, Muir Woods Public Meeting Materials 2013-Present Commercial Services Plan
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Posters From October 3 SBVA Mtg Repair/Rehabilitation
Access Reservation System, Muir Woods Memorandum of Understanding (MOU), National Park Service (NPS) and County of Marin Commercial Services Plan
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Biological Assessment for the Sustainable Access Project Capital Improvement/New Construction
GGNRA Dog Management Plan Golden Gate National Recreation Area Dog Management Plan / FEIS Implementation Plan - Other
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Final EA/FONSI/Determination of No Impairment Repair/Rehabilitation
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Record of Decision (ROD) and Determination of No Impairment (DNI) Capital Improvement/New Construction
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E L-109 FONSI Capital Improvement/New Construction
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Administrative Record (AR) Other Natural/Cultural Resource Activities
Sneath Lane Trailhead Parking and Accessible Improvements Reconstruction
Negotiated Rulemaking for Dog Management at GGNRA Negotiated Rulemaking Committee Protocols Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 9/21/2006 Committee Meeting Other
Mori Point Restoration and Trail Plan Mori Point Finding of No Significant Impact (FONSI) and Errata Resource Management Plan
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 3/6/2006 Committee Meeting Other
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 9/2006 Other
Negotiated Rulemaking for Dog Management at GGNRA Agenda - Negotiated Rulemaking Committee Meetings Other
Negotiated Rulemaking for Dog Management at GGNRA Negotiated Rulemaking Committee Charter Other
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 4/5/2007 Committee Meeting Other
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 4/2007 Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - Chinese General Management Plan
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Record of Decision Attachment - Wetland Statement of Findings Transportation Plan
Crissy Field Center Temporary Relocation Project Project Update - September 25, 2009 Other
GGNRA Dog Management Plan Draft Plan/EIS Newsletter - January 2011 Implementation Plan - Other
General Management Plan - Golden Gate National Recreation Area NOI - Extended Public Comment Period - Dec 22, 2011 General Management Plan
Cosco Busan Recreational Use Restoration Projects Plan Detailed Project Selection Criteria Other
GGNRA Dog Management Plan Draft Plan/EIS Public Comment Summary Report - September 2011 Implementation Plan - Other
GGNRA Dog Management Plan Draft Plan/EIS Newsletter - January 2012 Implementation Plan - Other
Cosco Busan Recreational Use Restoration Projects Plan NPS Cosco Busan Projects Approved for Funding In Marin County Other
Crissy Field Refresh Planning Aerial Image of Crissy Field Planning Area Repair/Rehabilitation
Ocean Beach Fire Revised Pilot Program Update and Progress Report - August 2014 Regulation
General Management Plan - Golden Gate National Recreation Area Record of Decision (ROD) - GMP 2014 General Management Plan
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands SMCSD Treatment Plant Upgrade Project Other Permit
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Draft EIS Public Comments Capital Improvement/New Construction
Ocean Beach Fire Revised Pilot Program Fire Program Update Email - April 2015 Regulation
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project California State Clearinghouse Notice Other Natural/Cultural Resource Activities
Ocean Beach Fire Program Summary of Final Ocean Beach Fire Program Regulation
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project Final EIS_R Construction Permit
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Final Categorical Exclusion (CE) and Special Use Permit (SUP) Special Use Permit
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E Crystal Springs Vegetation Restoration Plan Capital Improvement/New Construction
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Finding of No Significant Impact (FONSI) Resource Protection
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Community Involvement Plan (CIP) Other Natural/Cultural Resource Activities
Compendium Updates Regarding E-bikes, Parkwide 36 CFR 4.30(i) - Regulations for electric bicycles Other Plan
FHWA Stinson Beach Parking Lots Rehabilitation Public Meeting Presentation Capital Improvement/New Construction
Rancho Corral de Tierra Comprehensive Site Management Plan Rancho Community Engagement Summary 2022-2023 Comprehensive Management Plan
Mori Point Restoration and Trail Plan Suggestions for Making Public Comments Resource Management Plan
Negotiated Rulemaking for Dog Management at GGNRA Federal Register Notices of Negotiated Rulemaking Committee Meetings Other
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 5/2006 Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - Spanish (Plan General de Manejo, Boletín #2) General Management Plan
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 4/2006 Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - Chinese General Management Plan
Dias Ridge Restoration and Trail Improvement Project Dias Ridge Update Flyer Other
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Summer 2009 - English General Management Plan
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Spanish General Management Plan
Caltrans Storm Damage Repairs, State Route 1, Marin County Caltrans Public Notices for PM 6.6, 7.7 and 8.1 Other Maintenance Activities
General Management Plan - Golden Gate National Recreation Area NOA of Draft EIS/GMP - Sept 12, 2011 General Management Plan
Cosco Busan Recreational Use Restoration Projects Plan Summary of Project Selection Process Other
Fire Management Plan Amendment for Rancho Corral de Tierra GGNRA Fire Management Plan - Record of Decision Fire Management Plan
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Agency/Stakeholder Meeting - September 18, 2013 Capital Improvement/New Construction
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Meeting Informational Banners - September 18, 2013 Capital Improvement/New Construction
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Newsletter Update - December 2013 Capital Improvement/New Construction
Rehabilitate Cavallo Point Lodge Historic Building 615, Fort Baker Email to Stakeholders July, 20, 2015 Rehabilitation
Ocean Beach Erosion Protection Measures - Immediate Action Plan Project Description Routine Maintenance
Crissy Field Centennial Repair, Presidio 100% Construction Drawings Repair/Rehabilitation
Alcatraz Ferry Embarkation Project DOA Notice of Availability Final EIS - Federal Register 1/24/17 Capital Improvement/New Construction
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Final Environmental Impact Statement Capital Improvement/New Construction
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Final EA, FONSI, Determination of No Impairment Capital Improvement/New Construction
Multi-agency Congestion Relief Pilot Study Planned to Improve Traffic Management, Marin Headlands, Golden Gate Bridge and Presidio Multi-agency Congestion Relief Pilot Study Planned to Improve Traffic Management, Marin Headlands, Golden Gate Bridge and Presidio Other Study
National Park Service Bay Area Air Tour Management Plan (ATMP) Final ATMP Package Air Tour Management Plan
Remove High Hazard Dam, Construct New Frog Ponds, Remove Non-Native Trees, Tennessee Valley Tennessee Valley Dam Removal Final FONSI/Determination of No Impairment Removal/Demolition
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 10/2007 Other
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Revised EA (integrated with changes from Errata) Resource Management Plan
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Final BCDC Consistency Determination Capital Improvement/New Construction
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - Spanish General Management Plan
Crissy Field Center Temporary Relocation Project Crissy Field Center Finding of No Significant Impact (FONSI) Other
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update August 2010 General Management Plan
Marin Equestrian Stables Plan Executive Summary Document Other
Alcatraz Ferry Embarkation Project Public Scoping Newsletter Capital Improvement/New Construction
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction NPS Notice of Intent - May 8, 2013 Construction Permit
Access Reservation System, Muir Woods Newsletter Update - December 2013 Commercial Services Plan
GGNRA Dog Management Plan Draft Plan/EIS Comment Response Report - September 2013 Implementation Plan - Other
Ocean Beach Fire Revised Pilot Program Informational Flyer Regulation
Ocean Beach Fire Revised Pilot Program Public Meeting Presentation - February 5, 2015 Regulation
Replace and Extend Stormwater Outfall IJKL, Crissy Field Categorical Exclusion Approval_Draft Reconstruction
Ocean Beach Fire Revised Pilot Program Public Meeting - Comments from Easels and Cards Regulation
Alcatraz Ferry Embarkation Project Draft EIS Newsletter - February 20, 2015 Capital Improvement/New Construction
General Management Plan - Golden Gate National Recreation Area 1980 GGNRA & Point Reyes General Management Plan EA General Management Plan
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs - County Flood Modeling Background Information Repair/Rehabilitation
Crissy Field Centennial Repair, Presidio Final Categorical Exclusion Approval Memo and Documentation Repair/Rehabilitation
Alcatraz Ferry Embarkation Project EPA Notice of Filing Final EIS - Federal Register 1/23/17 Capital Improvement/New Construction
Ocean Beach Fire Program February 2017 Public Open House Materials Regulation
Ocean Beach Fire Program February 2018 North Ocean Beach Public Meeting Materials Regulation
Ocean Beach Erosion Protection Measures - Immediate Action Plan Project Website Archive Routine Maintenance
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Determination of Non-Impairment Other Natural/Cultural Resource Activities
Alcatraz Island Historic Preservation & Safety Construction Project 2002 ROD Alcatraz Island Historic Preservation & Safety Construction Project Final Environmental Impact Statement (FEIS) Other
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement PG&E Jefferson – Martin 230kV Transmission Line Project and Settlement Agreement Finding of No Significant Impact (FONSI) Other
Negotiated Rulemaking for Dog Management at GGNRA 2006 NPS Management Policies Other
The Marine Mammal Center Site and Facilities Improvements Marine Mammal Center Site and Facilities Improvements EA, FONSI, and Errata Other
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Fort Baker Plan FEIS Capital Improvement/New Construction
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Chinese General Management Plan
General Management Plan - Golden Gate National Recreation Area Rancho Workshop 1 Brainstorm - January 29, 2009 General Management Plan
Caltrans Storm Damage Repairs, State Route 1, Marin County NPS Summary Sheet of Proposed Projects (August 2011) Other Maintenance Activities
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update January 2008 General Management Plan
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update Spring 2010 General Management Plan
34th America's Cup Event, Parkwide AC34 Cultural Resources Condition Assessment/Section 106 Report Other
34th America's Cup Event, Parkwide Cultural Resources (Section 106) Compliance Documents Other
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Alternatives Evaluation Report - February 7, 2011 Construction Permit
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Notice of Preparation/Notice of Intent - February 28, 2013 Construction Permit
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Meeting Presentation from September 18, 2013 Capital Improvement/New Construction
General Management Plan - Golden Gate National Recreation Area Additional Public Outreach General Management Plan
(See PEPC 108243) 2014 Ocean Beach Sand Management Project Project Overview Brochure Other Maintenance Activities
Interim Compendium Amendment - Commercial Dog Walking Permit CE Approval and Decision Memo with Attachments Other
Construct Bus Stops and Upgrade Trail, Muir Beach Regulatory Permits Capital Improvement/New Construction
Replace and Extend Stormwater Outfall IJKL, Crissy Field Categorical Exclusion Approval_Final Reconstruction
General Management Plan - Golden Gate National Recreation Area Final General Management Plan/Environmental Impact Statement SUMMARY General Management Plan
Ocean Beach Fire Program Project Website Archive Regulation
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs Project Drawings Repair/Rehabilitation
Crissy Field Centennial Repair, Presidio Public Comments Repair/Rehabilitation
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Public Comments Submitted on the Proposal and Draft Categorical Exclusion (CE) Special Use Permit
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Final Environmental Assessment (EA) for the Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Resource Protection
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project FONSI - Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Other Natural/Cultural Resource Activities
Army Corps of Engineers Sand Nourishment Project, Ocean Beach Ocean Beach Storm Damage Reduction Beach Nourishment Project Other Maintenance Activities
Rancho Corral de Tierra Comprehensive Site Management Plan Draft Rancho Corral De Tierra Comprehensive Site Management Plan Comprehensive Management Plan
* Open for comment.