PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Revised EA (integrated with changes from Errata)


The EA in its entirety, complete with project modifications and text changes found in the Errata.

The Appendices have not changed. They can be viewed under the link for the original EA.
 
Document Content:
Revised Chapter 1 - Purpose and Need   (1.3 MB, PDF file)
Revised Chapter 2 - Alternatives   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.