PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Vista Point Multi-Use Trail Draft CE


Enclosed is the Draft Categorical Exclusion (CE) for the Vista Point Multi-Use Trail. Herein is the project description, environmental impacts analysis, best management practices, and the preliminary design drawings for the Project.
 
Comment Period: Closed        May 4, 2016 - Jun 4, 2016
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.