Project Links
Golden Gate National Recreation Area » Dias Ridge Restoration and Trail Improvement Project » Document List » Document Contents
Dias Ridge Restoration and Trail Improvement Project
The National Park Service and the Department of Parks and Recreation propose to restore and improve the Dias Ridge Trail located in the Golden Gate National Recreation Area and Mt. Tamalpais State Park. The proposed actions would realign trail segments and restore degraded areas on Dias Ridge. The project would improve overall quality of the parkland and reduce sedimentation into the Redwood Creek and Green Gulch watersheds by removing unauthorized trails, replacing or rehabilitating poorly aligned and eroding segments of the Dias Ridge trail, and restoring areas of natural landscape. An improved trail alignment would also support existing authorized trail-use designations.
Comment Period:
Closed
Jul 5, 2007 - Aug 3, 2007
|
Document Content: |
Dias Ridge Restoration and Trail Improvement EA/IS
(3.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |