Project Links
Golden Gate National Recreation Area » GGNRA Dog Management Plan » Document List » Document Contents
Golden Gate National Recreation Area Dog Management Plan / FEIS
The Final Environmental Impact Statement for Dog Management in GGNRA was released on December 9, 2016, beginning a 30-day no action period (FEIS is currently available on PEPC). This document analyzes alternative approaches to dog management and recommends Alternative F as the Preferred Alternative. The FEIS reflects and addresses public comments received on the Draft and Supplemental Environmental Impact Statements. There will not be a formal public comment period for the FEIS.
The FEIS Preferred Alternative incorporates a number of changes in response to public comment. A partial list of recent changes include:
-Addition of voice and sight control area at Rancho Corral de Tierra (Flat Top)
-Addition of an on-leash loop trail at Muir Beach (Kaashi Way)
-Expansion of both voice-and-sight-control and dog-free areas at Crissy Field
-Realignment and expansion of an on-leash area at Baker Beach
-Addition of an accessible on- and off-leash trail at Fort Funston
-Addition of an on-leash trail at Mori Point (Mori Headlands Trail)
-Addition of an on-leash trail to overlook at Milagra Ridge (Milagra Ridge Road)
Document Content: |
GOGA_Camera_Ready_FEIS_EPA_File_Volume_2_Part_1.pdf
(48.4 MB, PDF file)
GOGA_Camera_Ready_FEIS_EPA_File_Volume_1.pdf
(8.6 MB, PDF file)
FEIS Errata.pdf
(559.5 KB, PDF file)
GOGA_Camera_Ready_FEIS_EPA_File_Volume_2_Part_2.pdf
(25.1 MB, PDF file)
GOGA_Camera_Ready_FEIS_EPA_File_Volume_2_Part_3.pdf
(28.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |