PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Multi-agency Congestion Relief Pilot Study Planned to Improve Traffic Management, Marin Headlands, Golden Gate Bridge and Presidio


Golden Gate National Recreation Area (GGNRA) in conjunction with Golden Gate Bridge Highway and Transportation District and the Presidio Trust will implement a collaboratively planned series of pilots today to study ways to relieve traffic congestion and major traffic delays on the Golden Gate Bridge, in the Marin Headlands, and in the Presidio.
 
Document Content:
Admin CE for Traffic Pilots.pdf   (125.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.