Project Links
Golden Gate National Recreation Area » GGNRA Dog Management Plan » Document List » Document Contents
Draft Plan/EIS Newsletter - January 2011
This newsletter is an introduction to the GGNRA Draft Environmental Impact Statement for Dog Management (draft plan/EIS), which was released for
a 90-day public comment period on January 14, 2011.
![]() |
Document Content: |
Draft Plan/DEIS Newsletter
(3.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |