Project Title Document Title Review End
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement PG&E Jefferson-Martin 230 kV Transmission Line Project Settlement Agreement EA Jun 06, 2005
Negotiated Rulemaking for Dog Management at GGNRA Federal Register Notices to Establish the Negotiated Rulemaking Committee Jul 28, 2005
Mori Point Restoration and Trail Plan Mori Point Restoration and Trail Plan EA Mar 31, 2006
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Design Concepts May 30, 2006
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #1 - Spring 2006 May 31, 2006
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Environmental Assessment (EA) Apr 06, 2007
Dias Ridge Restoration and Trail Improvement Project Dias Ridge Restoration and Trail Improvement Project Aug 03, 2007
General Management Plan - Golden Gate National Recreation Area Scoping Summary 2006, General Management Plan Aug 01, 2008
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Spring 2008 Aug 01, 2008
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - February 2007 Aug 01, 2008
Fort Funston Site Improvements Scoping Flyer - Construction of New Restroom at Fort Funston Jan 18, 2009
Crissy Field Center Temporary Relocation Project Crissy Field Center Temporary Relocation Impact Assessment Jun 12, 2009
Crissy Field Center Temporary Relocation Project Crissy Field Center Relocation Jun 12, 2009
Headlands Institute Campus Improvement and Expansion Plan Headlands Institute Campus Improvement and Expansion Plan Final EA Sep 14, 2009
Point Bonita Suspension Bridge Replacement Project Point Bonita Bridge Replacement Project May 27, 2011
GGNRA Dog Management Plan Draft Dog Management Plan / Environmental Impact Statement May 30, 2011
General Management Plan - Golden Gate National Recreation Area Draft General Management Plan/Environmental Impact Statement - September 2011 Dec 09, 2011
Marin Equestrian Stables Plan Marin Equestrian Stables Plan Environmental Assessment Dec 16, 2011
Ocean Beach Master Plan SPUR Ocean Beach Master Plan Executive Summary Feb 29, 2012
34th America's Cup Event, Parkwide Environmental Assessment for the 34th America's Cup Jul 07, 2012
Alcatraz Ferry Embarkation Project Notice of Intent to Prepare an EIS for the Alcatraz Ferry Embarkation Site Jul 31, 2012
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands Public Scoping Notice Jan 31, 2013
Fire Management Plan Amendment for Rancho Corral de Tierra DRAFT AMENDMENT TO THE FIRE MANAGEMENT PLAN FOR RANCHO CORRAL DE TIERRA Jul 12, 2013
Fire Management Plan Amendment for Rancho Corral de Tierra Proposed Fire Management Actions for 2013 - Rancho Corral de Tierra Jul 12, 2013
Cosco Busan Recreational Use Restoration Projects Plan NPS Cosco Busan Initial Projects Approved For Funding in San Francisco Jul 31, 2013
General Management Plan - Golden Gate National Recreation Area Draft Programmatic Agreement for National Historic Preservation Act Compliance - September 2013 Nov 25, 2013
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands Sausalito-Marin City Sanitary District Treatment Upgrade Project EA/IS Dec 13, 2013
Access Reservation System, Muir Woods Public Scoping Announcement - September 4, 2013 Jan 11, 2014
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Scoping Announcement - September 4, 2013 Jan 11, 2014
Crissy Field Refresh Planning Planning Goals for Crissy Refresh Effort Feb 16, 2014
GGNRA Dog Management Plan Draft Dog Management Plan/ Supplemental Environmental Impact Statement Feb 18, 2014
Interim Compendium Amendment - Commercial Dog Walking Permit Interim Compendium Amendment for Commercial Dog Walking Apr 14, 2014
Ocean Beach Fire Revised Pilot Program Ocean Beach Fire Revised Pilot Program Announcement May 16, 2014
Interim Trail Plan, Rancho Corral de Tierra, San Mateo County Draft Rancho Interim Trail Plan Jun 14, 2014
(See PEPC 108243) 2014 Ocean Beach Sand Management Project Detailed Project Description Sep 26, 2014
Proposed Fee Increases within Golden Gate National Recreation Area Proposed Fee Increases within Golden Gate National Recreation Area Dec 19, 2014
Alcatraz Ferry Embarkation Project Draft EIS - February 20, 2015 May 20, 2015
Cavallo Point Lodge Demonstration Greenhouse, Fort Baker Greenhouse Site Plan and Views (dated July 16, 2015) Aug 20, 2015
Rehabilitate Cavallo Point Lodge Historic Building 615, Fort Baker Alternatives for Building 615 Aug 20, 2015
Access Reservation System, Muir Woods Muir Woods Reservation System EA Nov 22, 2015
Ocean Beach Fire Program Ocean Beach Fire Program Proposal Dec 04, 2015
Milagra Battery Trail and Signs, Milagra Ridge Milagra Battery Trail and Signs DRAFT CEQA/NEPA Environmental Compliance Categorical Exemption/Categorical Exclusion Dec 24, 2015
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Redwood Creek Trail Realignment and Dias Ridge Extension Project EA, November 2015 Jan 15, 2016
Repair and Upgrade City Pump Station #2 , Van Ness and McDowell, Fort Mason CCSF Auxiliary Water Supply System Seismic Upgrade Project Feb 04, 2016
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Extended: PG&E Gas Line-109 Pipeline Replacement Project Environmental Assessment Public Review Period, March 28 - April 15, 2016 Apr 15, 2016
Crissy Field Centennial Repair, Presidio Schematic Design Apr 22, 2016
Crissy Field Centennial Repair, Presidio Draft Categorical Exclusion Documentation Apr 22, 2016
Vista Point Multi-Use Trail, Fort Baker Vista Point Multi-Use Trail Draft CE Jun 04, 2016
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project Draft EIS_R Jul 01, 2016
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Public Scoping: Muir Woods Salmon Habitat Enhancement & Bridge Replacement Project Presentation - 9/20/16 Oct 21, 2016
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Sustainable Access Project - Draft Environmental Assessment Dec 05, 2016
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Muir Woods Road Improvement Project Dec 09, 2016
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Public Scoping Presentation Jan 31, 2017
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Scoping Notice, Project Description, and Maps Mar 17, 2017
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Proposal and Draft Categorical Exclusion Apr 21, 2017
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Muir Woods Water/Wastewater Service Rehabilitation Draft Environmental Assessment (EA) May 05, 2017
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Draft Environmental Assessment May 18, 2017
Muir Woods Road Improvements (County of Marin & Federal Highway Admin.) Muir Woods Road Improvement Project Newsletter #2 Jun 12, 2017
Proposed Fee Increase at Kirby Cove and Bicentennial Campgrounds, Marin Headlands Proposed Fee Increase at Kirby Cove and Bicentennial Campgrounds Oct 05, 2017
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Draft Engineering Evaluation/Cost Analysis (EE/CA) Oct 15, 2021
Compendium Updates Regarding E-bikes, Parkwide 2021 Superintendent's Compendium Oct 27, 2021
National Park Service Bay Area Air Tour Management Plan (ATMP) Air Tour Management Plan for Golden Gate National Recreation Area, Muir Woods National Monument, Point Reyes National Seashore, and San Francisco Maritime National Historical Park Nov 15, 2021
Minor Boundary Adjustment Notice of Realty Action (NORA) Map - Notice of Realty Action Aug 08, 2022
Minor Boundary Adjustment Notice of Realty Action (NORA) Notice of Realty Action Aug 08, 2022
Remove High Hazard Dam, Construct New Frog Ponds, Remove Non-Native Trees, Tennessee Valley Tennessee Valley Dam Removal and Lower Valley Restoration Project Environmental Assessment Nov 17, 2022
Public Electric Vehicle (EV) Charging Fee Proposal - Public Comment Site Map - NPS-GGNRA Public EV Charging Fee Proposal May 2023 Jun 23, 2023
NPS Easement and Special Use Permit to City and County of San Francisco South Ocean Beach Climate Change Adaptation Project Environmental Assessment OB CCAP May 08, 2024
Stinson Beach Parking Lot Rehabilitation Stinson Beach Parking Lot Rehabilitation Civic Engagement 2024 Aug 15, 2024
Mori Point Restoration and Trail Plan Public Scoping Summary
GGNRA Dog Management Plan Public Scoping Comment Analysis Report - 2006
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 7/31/2006 Committee Meeting
GGNRA Dog Management Plan Public Scoping Workshops Project Information - 2006
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 5/15/2006 Committee Meeting
Golden Gate NRA Fire Management Plan (FMP) EIS Record of Decision for the GGNRA Fire Management Plan
Alcatraz Island Historic Preservation & Safety Construction Project Alcatraz Island Historic Preservation & Safety Construction Project Final Environmental Impact Statement (FEIS)
General Management Plan - Golden Gate National Recreation Area GMP NOI March 2006
Dias Ridge Restoration and Trail Improvement Project FONSI - Dias Ridge Restoration and Trail Improvement Project
General Management Plan - Golden Gate National Recreation Area Summary of Public Comments on the Preliminary Alternatives
34th America's Cup Event, Parkwide FONSI
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Purpose, Need and Objectives - September 2013
Access Reservation System, Muir Woods Agency/Stakeholder Meeting - September 18, 2013
Perform Flood Repairs, Stinson Beach 2014_2015 Project Overview
Cavallo Point Lodge Demonstration Greenhouse, Fort Baker Email to Stakeholders July 20, 2015
Ocean Beach Erosion Protection Measures - Immediate Action Plan IAP Construction Drawings
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Construction Drawings_Set One
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs - Engineering Report
Interim Trail Plan, Rancho Corral de Tierra, San Mateo County Final Categorical Exclusion - Interim Trail Plan
Alcatraz Ferry Embarkation Project Regulatory Agency Concurrence (CA SHPO, BCDC, NMFS)
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project EIS Record of Decision
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Errata
Compendium Updates Regarding E-bikes, Parkwide 36 CFR 1.4 Definition of electric bicycle
GGNRA Dog Management Plan About NEPA and Negotiated Rulemaking
Negotiated Rulemaking for Dog Management at GGNRA Frequently Asked Questions
General Management Plan - Golden Gate National Recreation Area Summer 2008 Public Meetings
Fort Mason Long Term Lease Fort Mason Long Term Lease EA, FONSI, and Errata
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - 1. Fall 2007
Presidio Trails and Bikeways Master Plan Presidio Trails and Bikeways Master Plan EA, FONSI, and Errata
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Press Release regarding Agreement between NPS and Sausalito
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update January 2011
Alexander Avenue Planning Study, Marin County Alexander Avenue Planning Study
Caltrans Storm Damage Repairs, State Route 1, Marin County Caltrans Fact Sheets for Four Pending Projects at PM 6.6, 7.7, 8.1, and 10.95
Marin Equestrian Stables Plan Marin Equestrian Stables Plan Finding of No Significant Impact (FONSI)
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Fort Baker Plan FEIS - Record of Decision
Perform Flood Repairs, Stinson Beach Flood Pictures
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Work Summary and Phasing Description
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Supporting EA Documents
GGNRA Dog Management Plan SEIS Public Comment Report - 2014
Ocean Beach Fire Program Final Ocean Beach Fire Program
Access Reservation System, Muir Woods Muir Woods Reservation System Finding of No Significant Impact (FONSI) and Errata
Milagra Battery Trail and Signs, Milagra Ridge FINAL Milagra Battery Trail and Signs CE/CE Package
Ocean Beach Fire Program Pre-Proposal Scoping and Public Meeting Materials
Alcatraz Ferry Embarkation Project Comment Analysis Report for the Ferry Embarkation Draft Environmental Impact Statement
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Determination of No Impairment
National Park Service Bay Area Air Tour Management Plan (ATMP) Public Meeting PowerPoint
Rancho Corral de Tierra Comprehensive Site Management Plan Rancho Corral De Tierra Equestrian Facilities Management Study
Trail System Accessible Improvements, Mori Point
Negotiated Rulemaking for Dog Management at GGNRA Meeting Summaries
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 7/2006
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement Errata
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 4/18/2006 Committee Meeting
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 3/2006
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 10/27/2007 Committee Meeting
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Finding of No Significant Impact (FONSI) and Errata
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Marin Headlands & Fort Baker TIMP Final EIS
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Chinese
Headlands Institute Campus Improvement and Expansion Plan Preliminary Cultural Landscape Report for Ft. Cronkhite
GGNRA Dog Management Plan Draft Plan/EIS Open House Meeting Posters March 2011
34th America's Cup Event, Parkwide Draft America's Cup People Plan
Caltrans Storm Damage Repairs, State Route 1, Marin County Location Map of 2007 and proposed 2012 Tieback Walls
Cosco Busan Recreational Use Restoration Projects Plan Informational Poster from October 2011 Open House
Alcatraz Ferry Embarkation Project Public Scoping Comment Summary
Marin Equestrian Stables Plan 2011 Marin Equestrian Stables Plan Environmental Assessment Public Comments (with redactions)
Construct Bus Stops and Upgrade Trail, Muir Beach Public Outreach
Construct Bus Stops and Upgrade Trail, Muir Beach Environmental Compliance
Alcatraz Ferry Embarkation Project Transportation and Circulation Study - Report Only
Access Reservation System, Muir Woods Background Information
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Construction Drawings_Set Two
Crissy Field Centennial Repair, Presidio Project Update Memo - May 5, 2016
Crissy Field Centennial Repair, Presidio Public Notification Flyer
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E Crystal Springs Seed Mix
Compendium Updates Regarding E-bikes, Parkwide Categorical Exclusion and Approval for Compendium Updates Regarding Electrical Bicycles (e-bikes)
Rehabilitation of the Water Tower (AL-001), Alcatraz
Demolition and Removal of Nike Missile Site Structures and Utilities, Sweeney Ridge
Golden Gate NRA Fire Management Plan (FMP) EIS Golden Gate National Recreation Area Fire Management Plan FEIS
Negotiated Rulemaking for Dog Management at GGNRA NEPA and Negotiated Rulemaking
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Spanish
Dias Ridge Restoration and Trail Improvement Project Errata - Dias Ridge Restoration and Trail Improvement Project
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Marin Headlands and Fort Baker TIMP - Record of Decision
34th America's Cup Event, Parkwide Host and Venue Agreement between the Event Authority and CCSF
34th America's Cup Event, Parkwide FONSI_Errata
Fire Management Plan Amendment for Rancho Corral de Tierra GGNRA Fire Management Plan, Final EIS
General Management Plan - Golden Gate National Recreation Area Final General Management Plan / Environmental Impact Statement - April 2014
GGNRA Dog Management Plan Draft Plan/SEIS Open House Meeting Posters - November 2013
Ocean Beach Fire Revised Pilot Program NEPA Compliance Document - May 22, 2014
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo Map of GGNRA Easements
Alcatraz Ferry Embarkation Project Transportation and Circulation Study - Appendices
Access Reservation System, Muir Woods Public Meeting Materials 2013-Present
Stinson Beach Waste Water Treatment Facility Rehabilitation Project Posters From October 3 SBVA Mtg
Access Reservation System, Muir Woods Memorandum of Understanding (MOU), National Park Service (NPS) and County of Marin
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Biological Assessment for the Sustainable Access Project
GGNRA Dog Management Plan Golden Gate National Recreation Area Dog Management Plan / FEIS
Muir Woods Water/Wastewater Service and Telecom Rehabilitation Final EA/FONSI/Determination of No Impairment
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Record of Decision (ROD) and Determination of No Impairment (DNI)
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E L-109 FONSI
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Administrative Record (AR)
Sneath Lane Trailhead Parking and Accessible Improvements
Negotiated Rulemaking for Dog Management at GGNRA Negotiated Rulemaking Committee Protocols
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 9/21/2006 Committee Meeting
Mori Point Restoration and Trail Plan Mori Point Finding of No Significant Impact (FONSI) and Errata
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 3/6/2006 Committee Meeting
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 9/2006
Negotiated Rulemaking for Dog Management at GGNRA Agenda - Negotiated Rulemaking Committee Meetings
Negotiated Rulemaking for Dog Management at GGNRA Negotiated Rulemaking Committee Charter
Negotiated Rulemaking for Dog Management at GGNRA Information presented at 4/5/2007 Committee Meeting
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 4/2007
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - Chinese
Marin Headlands and Fort Baker Transportation Infrastructure and Management Plan Record of Decision Attachment - Wetland Statement of Findings
Crissy Field Center Temporary Relocation Project Project Update - September 25, 2009
GGNRA Dog Management Plan Draft Plan/EIS Newsletter - January 2011
General Management Plan - Golden Gate National Recreation Area NOI - Extended Public Comment Period - Dec 22, 2011
Cosco Busan Recreational Use Restoration Projects Plan Detailed Project Selection Criteria
GGNRA Dog Management Plan Draft Plan/EIS Public Comment Summary Report - September 2011
GGNRA Dog Management Plan Draft Plan/EIS Newsletter - January 2012
Cosco Busan Recreational Use Restoration Projects Plan NPS Cosco Busan Projects Approved for Funding In Marin County
Crissy Field Refresh Planning Aerial Image of Crissy Field Planning Area
Ocean Beach Fire Revised Pilot Program Update and Progress Report - August 2014
General Management Plan - Golden Gate National Recreation Area Record of Decision (ROD) - GMP 2014
Sausalito-Marin City Sanitary District Treatment Plant Upgrade, Fort Baker, Marin Headlands SMCSD Treatment Plant Upgrade Project
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Draft EIS Public Comments
Ocean Beach Fire Revised Pilot Program Fire Program Update Email - April 2015
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project California State Clearinghouse Notice
Ocean Beach Fire Program Summary of Final Ocean Beach Fire Program
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Improvement Project Final EIS_R
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Final Categorical Exclusion (CE) and Special Use Permit (SUP)
PG&E Pipeline Safety Enhancement Plan, Phase 2, SFPUC Peninsula Watershed, San Mateo PG&E Crystal Springs Vegetation Restoration Plan
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Finding of No Significant Impact (FONSI)
CERCLA Hawk Hill, Hazardous Materials Management in Soil, Marin Headlands Community Involvement Plan (CIP)
Compendium Updates Regarding E-bikes, Parkwide 36 CFR 4.30(i) - Regulations for electric bicycles
Rancho Corral de Tierra Comprehensive Site Management Plan Rancho Community Engagement Summary 2022-2023
Mori Point Restoration and Trail Plan Suggestions for Making Public Comments
Negotiated Rulemaking for Dog Management at GGNRA Federal Register Notices of Negotiated Rulemaking Committee Meetings
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 5/2006
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - Spanish (Plan General de Manejo, Boletín #2)
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 4/2006
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #2 - Chinese
Dias Ridge Restoration and Trail Improvement Project Dias Ridge Update Flyer
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Summer 2009 - English
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #5 - Spanish
Caltrans Storm Damage Repairs, State Route 1, Marin County Caltrans Public Notices for PM 6.6, 7.7 and 8.1
General Management Plan - Golden Gate National Recreation Area NOA of Draft EIS/GMP - Sept 12, 2011
Cosco Busan Recreational Use Restoration Projects Plan Summary of Project Selection Process
Fire Management Plan Amendment for Rancho Corral de Tierra GGNRA Fire Management Plan - Record of Decision
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Agency/Stakeholder Meeting - September 18, 2013
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Meeting Informational Banners - September 18, 2013
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Newsletter Update - December 2013
Rehabilitate Cavallo Point Lodge Historic Building 615, Fort Baker Email to Stakeholders July, 20, 2015
Ocean Beach Erosion Protection Measures - Immediate Action Plan Project Description
Crissy Field Centennial Repair, Presidio 100% Construction Drawings
Alcatraz Ferry Embarkation Project DOA Notice of Availability Final EIS - Federal Register 1/24/17
Alcatraz Ferry Embarkation Project Alcatraz Ferry Embarkation Final Environmental Impact Statement
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Final EA, FONSI, Determination of No Impairment
Multi-agency Congestion Relief Pilot Study Planned to Improve Traffic Management, Marin Headlands, Golden Gate Bridge and Presidio Multi-agency Congestion Relief Pilot Study Planned to Improve Traffic Management, Marin Headlands, Golden Gate Bridge and Presidio
National Park Service Bay Area Air Tour Management Plan (ATMP) Final ATMP Package
Remove High Hazard Dam, Construct New Frog Ponds, Remove Non-Native Trees, Tennessee Valley Tennessee Valley Dam Removal Final FONSI/Determination of No Impairment
Negotiated Rulemaking for Dog Management at GGNRA Written Public Comments - 10/2007
Lower Redwood Creek Floodplain and Salmonid Habitat Restoration, Banducci Site Revised EA (integrated with changes from Errata)
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Final BCDC Consistency Determination
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #3 - Spanish
Crissy Field Center Temporary Relocation Project Crissy Field Center Finding of No Significant Impact (FONSI)
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update August 2010
Marin Equestrian Stables Plan Executive Summary Document
Alcatraz Ferry Embarkation Project Public Scoping Newsletter
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction NPS Notice of Intent - May 8, 2013
Access Reservation System, Muir Woods Newsletter Update - December 2013
GGNRA Dog Management Plan Draft Plan/EIS Comment Response Report - September 2013
Ocean Beach Fire Revised Pilot Program Informational Flyer
Ocean Beach Fire Revised Pilot Program Public Meeting Presentation - February 5, 2015
Replace and Extend Stormwater Outfall IJKL, Crissy Field Categorical Exclusion Approval_Draft
Ocean Beach Fire Revised Pilot Program Public Meeting - Comments from Easels and Cards
Alcatraz Ferry Embarkation Project Draft EIS Newsletter - February 20, 2015
General Management Plan - Golden Gate National Recreation Area 1980 GGNRA & Point Reyes General Management Plan EA
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs - County Flood Modeling Background Information
Crissy Field Centennial Repair, Presidio Final Categorical Exclusion Approval Memo and Documentation
Alcatraz Ferry Embarkation Project EPA Notice of Filing Final EIS - Federal Register 1/23/17
Ocean Beach Fire Program February 2017 Public Open House Materials
Ocean Beach Fire Program February 2018 North Ocean Beach Public Meeting Materials
Ocean Beach Erosion Protection Measures - Immediate Action Plan Project Website Archive
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Determination of Non-Impairment
Alcatraz Island Historic Preservation & Safety Construction Project 2002 ROD Alcatraz Island Historic Preservation & Safety Construction Project Final Environmental Impact Statement (FEIS)
PG&E Jefferson Martin 230 kV Transmission Line Project Settlement Agreement PG&E Jefferson – Martin 230kV Transmission Line Project and Settlement Agreement Finding of No Significant Impact (FONSI)
Negotiated Rulemaking for Dog Management at GGNRA 2006 NPS Management Policies
The Marine Mammal Center Site and Facilities Improvements Marine Mammal Center Site and Facilities Improvements EA, FONSI, and Errata
Fort Baker Plan Final Environmental Impact Statement and Record of Decision Fort Baker Plan FEIS
General Management Plan - Golden Gate National Recreation Area General Management Plan Newsletter #4 - Chinese
General Management Plan - Golden Gate National Recreation Area Rancho Workshop 1 Brainstorm - January 29, 2009
Caltrans Storm Damage Repairs, State Route 1, Marin County NPS Summary Sheet of Proposed Projects (August 2011)
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update January 2008
General Management Plan - Golden Gate National Recreation Area General Management Plan E-Mail Update Spring 2010
34th America's Cup Event, Parkwide AC34 Cultural Resources Condition Assessment/Section 106 Report
34th America's Cup Event, Parkwide Cultural Resources (Section 106) Compliance Documents
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Vista Grande Drainage Basin Alternatives Evaluation Report - February 7, 2011
Vista Grande Drainage Basin Improvement Project EIR/EIS and Construction Notice of Preparation/Notice of Intent - February 28, 2013
Muir Woods Sustainable Access Project (formerly Muir Woods Site Improvements) Public Meeting Presentation from September 18, 2013
General Management Plan - Golden Gate National Recreation Area Additional Public Outreach
(See PEPC 108243) 2014 Ocean Beach Sand Management Project Project Overview Brochure
Interim Compendium Amendment - Commercial Dog Walking Permit CE Approval and Decision Memo with Attachments
Construct Bus Stops and Upgrade Trail, Muir Beach Regulatory Permits
Replace and Extend Stormwater Outfall IJKL, Crissy Field Categorical Exclusion Approval_Final
General Management Plan - Golden Gate National Recreation Area Final General Management Plan/Environmental Impact Statement SUMMARY
Ocean Beach Fire Program Project Website Archive
Perform Flood Repairs, Stinson Beach 2015_16 Flood Repairs Project Drawings
Crissy Field Centennial Repair, Presidio Public Comments
Pacific Leadership Institute Overnight Program, West Fort Miley, Lands End Public Comments Submitted on the Proposal and Draft Categorical Exclusion (CE)
Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project Final Environmental Assessment (EA) for the Muir Woods Salmon Habitat Enhancement and Bridge Replacement Project
Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project FONSI - Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project
Army Corps of Engineers Sand Nourishment Project, Ocean Beach Ocean Beach Storm Damage Reduction Beach Nourishment Project
Rancho Corral de Tierra Comprehensive Site Management Plan Draft Rancho Corral De Tierra Comprehensive Site Management Plan