Sanchez Oil and Gas Corporation's WM Rice #1 Well |
Public Scoping Brochure - Sanchez Oil and Gas Corporation WM Rice #1 Well |
Nov 19, 2004 |
Other |
Famcor Oil, Inc.'s Roberts/Duke #1 Flowline |
Environmental Assessment Famcor Oil, Inc. Roberts / Duke #1 Flowline |
Jan 28, 2005 |
Other |
Famcor Oil, Inc.'s Roberts/Duke #1 Flowline |
NOA for EA Plan of Operations |
Jan 28, 2005 |
Other |
Sanchez Oil and Gas Corporation's WM Rice #1 Well |
Federal Register correction |
Jan 28, 2005 |
Other |
C&E Operating Hankammer #1 Well |
Environmental Assessment C&E Operating, Inc. Proposal to Directionally Drill and Produce the Hankammer Well No. 1from a location outside the Neches Bottom/Jack Gore Baygall Unit, Big Thicket National Preserve, Hardin and Jasper Counties, Texas |
May 09, 2005 |
Other |
Peoples Energy Production Vastar Unit 2A Well No. 2 Application for Exemption |
Public Scoping Brochure |
Jun 23, 2005 |
Other |
Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey |
Project Scoping - Krescent Energy Company's Tyler "Cable-Only" 3-D Seismic Survey |
Aug 29, 2005 |
Other |
Peoples Energy Production Vastar Unit 2A Well No. 2 Application for Exemption |
Environmental Assessment, Peoples Energy Production - Texas, LP, Proposal to Directionally Drill and Produce the Vastar Unit 2A No. 2 Well, Beaumont Unit, Big Thicket National Preserve, Hardin and Orange Counties, Texas |
Sep 29, 2005 |
Other |
Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey |
Categorical Exclusion Form Regarding Krescent Energy Company LP's Tyler Cable-Only 3-D Seismic Survey |
Oct 03, 2005 |
Other |
Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey |
Krescent Energy Company LP's Plan of Operations for the Tyler "Cable-Only" 3-D Seismic Survey |
Oct 03, 2005 |
Other |
Reestablish an Administration Facility |
Scoping Brochure |
Apr 21, 2006 |
Capital Improvement/New Construction |
Reestablish an Administration Facility |
Environmental Assessment |
Jun 15, 2006 |
Capital Improvement/New Construction |
Reestablish an Administration Facility |
FONSI |
Jun 30, 2006 |
Capital Improvement/New Construction |
Construct a Fire Management Facility |
Proposal to Construct a Fire Cache/Maintenance Facility |
Jul 28, 2006 |
Capital Improvement/New Construction |
Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Scoping Brochure - Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Aug 23, 2006 |
Other |
Construct a Fire Management Facility |
Proposal to Construct a Fire Management Facility |
Oct 10, 2006 |
Capital Improvement/New Construction |
Construct a Fire Management Facility |
Fire Management Facility Environmental Assessment |
Oct 10, 2006 |
Capital Improvement/New Construction |
Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Notice to Hunters - Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Feb 28, 2007 |
Other |
Debris Removal from Little Pine Island - Pine Island Bayou Corridor Unit |
Scoping Brochure: EA for Hurricane Rita Debris in the Little Pine Island – Pine Island Bayou Corridor Unit |
Dec 14, 2007 |
Capital Improvement/New Construction |
Kelson Transmission Cedar Bayou-To-Deweyville 345-Kilovolt Electrical Transmission Line |
Public Scoping Brochure - Kelson Transmission Cedar Bayou-to-Deweville Transmission Line Project |
Dec 27, 2007 |
Right-of-Way Permit |
Debris Removal from Little Pine Island - Pine Island Bayou Corridor Unit |
Environmental Assessment - Removal of Hurricane Rita Related Debris in the Little Pine Island - Pine Island Bayou Corridor Unit |
May 17, 2008 |
Capital Improvement/New Construction |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Plan of Operations for Reclamation |
Plan of Operations - Buford Curtis, Inc. Rafferty Fee Well #1 Site Reclamation |
Jul 11, 2008 |
Other Permit |
Cimarex Energy Co. Delilah Cable-Only 3-D Seismic Survey |
Cimarex 3D Seismic Survey Public Scoping Brochure |
Nov 10, 2008 |
Other |
Endeavor Natural Gas, L.P. Black Stone Minerals Well #B-2 Re-entry |
Scoping Brochure - Endeavor Natural Gas, LP Proposal to Directionally Drill and Produce the Blackstone Minerals B-2 Well |
Dec 21, 2008 |
Other Permit |
Cimarex Energy Co. Delilah Cable-Only 3-D Seismic Survey |
Plan of Operations- Cimarex Energy Co. Delilah 3D Seismic Survey |
Feb 07, 2009 |
Other |
Big Sandy Creek Unit -- Hazardous Fuel Reduction / Longleaf Pine Restoration Project |
Public Scoping Brochure |
Apr 30, 2009 |
Other |
Provide Administrative Campsites and Recreational Vehicle (RV) Sites at the Field Research Station |
Public Scoping Notice |
Apr 30, 2009 |
Capital Improvement/New Construction |
BITH General Management Plan/ Environmental Impact Statement |
Big Thicket National Preserve General Management Plan Newsletter #1 |
Aug 31, 2009 |
General Management Plan |
Endeavor Natural Gas, L.P. Black Stone Minerals Well #B-2 Re-entry |
Endeavor Natural Gas LP Blackstone Minerals Well #B-2 Re-Entry EA |
Oct 21, 2009 |
Other Permit |
BITH General Management Plan/ Environmental Impact Statement |
Big Thicket National Preserve - Newsletter #2: Draft Management Alternatives |
Jan 03, 2011 |
General Management Plan |
Mil Vid Samson Directionally Drilled Well |
Samson Lone Star LLC Proposal to Drill and Produce the Mil-Vid Properties A-3 #1 Well from a Surface Location Outside Big Thicket National Preserve Using a Previously Existing Access Road through the Preserve, Orange County, Texas |
Oct 30, 2011 |
Other Permit |
Tennessee Gas Pipeline Company Culvert and Geoweb Placement |
Project Scoping Newsletter |
Dec 18, 2011 |
Right-of-Way Permit |
Tennessee Gas Pipeline Company Culvert and Geoweb Placement |
Ammendment to Project Scoping Notice |
May 03, 2012 |
Right-of-Way Permit |
Tennessee Gas Pipeline Company Culvert and Geoweb Placement |
Proposal to Improve a Natural Gas Pipeline Right-of-Way for Maintenance Access and to Lower a Segment of Exposed and Suspended Pipe in Big Sandy Creek within the Big Sandy Creek Unit of Big Thicket National Preserve |
Aug 20, 2012 |
Right-of-Way Permit |
BITH Fire Management Plan Environmental Assessment |
Big Thicket National Preserve Fire Managment Plan Environmental Assessment |
Jan 06, 2013 |
Fire Management Plan |
Feral Hog Management Plan and Environmental Assessment |
Project Scoping for an Environmental Assessment |
Feb 10, 2013 |
Resource Management Plan |
Fort Apache Baptist Foundation #1 and Nordin #1 Directionally Drilled Wells |
Proposal to Drill and Produce the Fort Apache Energy, Inc. Baptist Foundation #1 and Nordin #1 Wells from Surface Locations Outside Big Thicket National Preserve Tyler County, Texas |
Jun 22, 2013 |
Other |
Famcor Oil Inc Carroll No. 2 & 3 and 4 & 5 Directionally Drilled Wells |
Environmental Assessment of the Famcor Proposal to Directionally Drill and Produce the Carroll-BMSC#2 and #3 Wells from a New Surface Location Outside Big Sandy Creek Unit and the Carroll-BSMC #1 and #5 Wells and the Carroll #4 Well From an Existing Surface Location Outside the Big Sandy Creek Unit |
Jun 22, 2013 |
Other |
Environmental Assessment of the Proposed Century Exploration Houston, LLC Phineas #3 and Wiley Coyote Wells and DC Montgomery #1 Well and Flowline |
Proposal to drill and produce three wells from two surface locations outside of the Lower Neches River Corridor Unit and Beaumont Unit and install a flowline beneath the Lower Neches River Corridor Unit in Hardin, Jasper, and Orange counties, Texas |
Jun 25, 2013 |
Other |
BITH General Management Plan/ Environmental Impact Statement |
Big Thicket National Preserve DRAFT General Management Plan |
Jul 01, 2013 |
General Management Plan |
Fort Apache Baptist Foundation #1 and Nordin #1 Directionally Drilled Wells |
Environmental Assessment Fort Apache Energy, Inc. Proposal to Directionally Drill and Produce: The Baptist Foundation No. 1 and Nordin No. 1 Wells from Two Locations Outside the Turkey Creek Unit in Tyler County, Texas |
Nov 06, 2013 |
Other |
Environmental Assessment of the Proposed Century Exploration Houston, LLC Phineas #3 and Wiley Coyote Wells |
Environmental Assessment, Century Exploration Houston, LLC Proposal to: Drill and Produce the Phineas #3 and Wile E. Coyote Wells from One Location Outside the Beaumont Unit in Orange County, Texas |
Nov 08, 2013 |
Other |
Feral Hog Management Plan and Environmental Assessment |
Feral Hog Management Plan and Environmental Assessment |
Jan 20, 2014 |
Resource Management Plan |
Century Exploration Houston LLC BP-Yosemite No.1 and up to 6 Additional Directionally Drilled Wells |
Project Scoping For Environmental Analysis |
Sep 05, 2014 |
Other Administrative Activities |
Century Exploration Houston LLC BP-Yosemite No.1 and up to 6 Additional Directionally Drilled Wells |
Century Exploration Houston, LLC Proposal to Drill and Produce the BP-Yosemite Well No. 1 and up to Six Additional Wells from One SUrface Location Outside the Beaumont Unit in Hardin County, Texas |
Nov 24, 2014 |
Other Administrative Activities |
Enterprise Pipeline Company Pipeline Installation in Hickory Creek Savannah and Turkey Creek Units |
Scoping Notice |
Jun 19, 2015 |
Special Use Permit |
Unit Blackstone #1 and #2 Well Plugging and Reclamation |
Categorical Exclusion Form |
Jun 23, 2015 |
Repair/Rehabilitation |
BP America Ticonderoga Directional Drilling Project |
BP America Production Company Proposal to Horizontally drill and produce up to nine wells from six surface locations outside of the Big Thicket National Preserve in Hardin County, Texas |
Oct 11, 2015 |
Other Administrative Activities |
BP America Ticonderoga Directional Drilling Project |
EA for BP Proposal to Directionally Drill and Produce up to 9 Wells from 6 Surface Locations Outside BITH's Neches Bottom/Jack Gore Baygall Unit |
Jan 19, 2017 |
Other Administrative Activities |
Unit Petroleum Company Installation of a Gathering Pipeline Under Menard Creek Corridor Unit |
EA for UPC Plan of Operations 8_in Gathering Line across MCCU |
Mar 28, 2017 |
Other Plan |
Directional Drilling (Trigger #1) - EA |
Public Scoping Document |
Sep 30, 2022 |
Other Natural/Cultural Resource Activities |
Directional Drilling (Trigger #1) - EA |
Draft EA Lawco Trigger #1 Cross-boundary Exemption |
Jul 08, 2023 |
Other Natural/Cultural Resource Activities |
Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Survey Operations |
Temporary Access Permit - Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Survey Operations |
|
Other Permit |
Debris Removal from Little Pine Island - Pine Island Bayou Corridor Unit |
Finding of No Significant Impact (FONSI) |
|
Capital Improvement/New Construction |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Plan of Operations for Reclamation |
Response Action Completion Report |
|
Other Permit |
Endeavor Natural Gas, L.P. Black Stone Minerals Well #B-2 Re-entry |
FONSI |
|
Other Permit |
Century Exploration Houston LLC BP-Yosemite No.1 and up to 6 Additional Directionally Drilled Wells |
Signed Exploration Houston LLC BP- Yosemite No.1 and up to 6 additional Directionally Drilled Wells FONSI |
|
Other Administrative Activities |
Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Categorical Exclusion Form - Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
|
Other |
Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Survey Operations |
Categorical Exclusion Form - Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Survey Operations |
|
Other Permit |
BITH General Management Plan/ Environmental Impact Statement |
Federal Register Notice of Intent |
|
General Management Plan |
BITH General Management Plan/ Environmental Impact Statement |
Big Thicket General Management Plan - Public Scoping Summary Report |
|
General Management Plan |
Famcor Oil Inc Carroll No. 2 & 3 and 4 & 5 Directionally Drilled Wells |
Public Scoping Notice |
|
Other |
BITH Fire Management Plan Environmental Assessment |
BITH FONSI Fire Management Plan SIGNED |
|
Fire Management Plan |
BP America Ticonderoga Directional Drilling Project |
Signed FONSI for BP Proposal to Directionally Drill and Produce up to 9 Wells from 6 Surface Locations Outside BITHs Neches BottomJack Gore Baygall |
|
Other Administrative Activities |
Construct a Fire Management Facility |
FONSI |
|
Capital Improvement/New Construction |
Seismic Assistants Ltd Supplemental Temporary Access Permit Request to Conduct a Wetland Delineation |
Dixie Environmental Services Co.'s (DESCO's) Proposed Scope of Work for Wetland Delineation of SAL's Drill Access Routes and Source Point Locations within the Turkey Creek, Big Sandy Creek Corridor, and Village Creek Corridor Units of the Big Thicket National Preserve |
|
Other Permit |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
Temporary Access Permit - Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
|
Other Permit |
Seismic Assistants Ltd Supplemental Temporary Access Permit Request to Conduct a Wetland Delineation |
Categorical Exclusion Form - Seismic Assistants Ltd Supplemental Temporary Access Permit Request to Conduct a Wetland Delineation |
|
Other Permit |
Debris Removal from Little Pine Island - Pine Island Bayou Corridor Unit |
Press Release for FONSI |
|
Capital Improvement/New Construction |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Plan of Operations for Reclamation |
Federal Register Notice of Availability of Plan of Operations |
|
Other Permit |
Fort Apache Baptist Foundation #1 and Nordin #1 Directionally Drilled Wells |
FONSI |
|
Other |
BITH General Management Plan/ Environmental Impact Statement |
Final General Management Plan/Environmental Impact Statement - August 2014 |
|
General Management Plan |
Unit Petroleum Company Installation of a Gathering Pipeline Under Menard Creek Corridor Unit |
Signed FONSI for Unit Petroleum |
|
Other Plan |
Peoples Energy Production Vastar Unit 2A Well No. 2 Application for Exemption |
Finding of No Significant Impact for Peoples Energy Production - Texas, LP Proposal to Directionally Drill and Produce the Vastar Unit 2A No. 2 Well from a Surface Location Outside the Beaumont Unit Big Thicket National Preserve Hardin and Orange Counties, Texas |
|
Other |
Kerr McGee Oil & Gas Onshore LP's Kountze 3-D Seismic Survey - Plan of Operations Supplement |
Categorical Exclusion Form - Kerr McGee Kountze 3-D Plan Supplement |
|
Other |
Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Vegetation Sampling and Mapping |
Categorical Exclusion Form - Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Vegetation Sampling and Mapping |
|
Other Permit |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
Summary of Findings - Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Soil and Groundwater Investigation, Pit Bottom Sampling |
|
Other Permit |
Seismic Assistants Ltd Supplemental Temporary Access Permit Request to Conduct a Wetland Delineation |
Temporary Access Permit - Seismic Assistants Ltd Supplemental Temporary Access Permit Request to Conduct a Wetland Delineation |
|
Other Permit |
Feral Hog Management Plan and Environmental Assessment |
FONSI |
|
Resource Management Plan |
Big Sandy Central Mechanical Fuel Reduction |
|
|
Fire - Mechanical Fuel Reduction |
Oil and Gas Management Plan |
FINAL Oil and Gas Management Plan Environmental Impact Statement for Big Thicket National Preserve, Texas |
|
Other |
Kerr McGee Oil & Gas Onshore LP's Kountze 3-D Seismic Survey - Plan of Operations Supplement |
Kerr McGee Kountze 3-D - Supplement Request for Vibroseis Operations |
|
Other |
Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Vegetation Sampling and Mapping |
Seismic Assistants, Ltd's Knight Phase IV 3D: Big Thicket National Preserve Turkey Creek Unit Vegetation Mapping and Sampling Plan |
|
Other Permit |
BITH Fire Management Plan Environmental Assessment |
Public Scoping Brochure |
|
Fire Management Plan |
BITH General Management Plan/ Environmental Impact Statement |
ROD for Final Environmental Impact Statement for GMP, BITH |
|
General Management Plan |
Directional Drilling (Trigger #1) - EA |
FINDING OF NO SIGNIFICANT IMPACT Lawco Trigger #1 Cross-boundary Exemption September 2023 |
|
Other Natural/Cultural Resource Activities |
Oil and Gas Management Plan |
Record of Decision, Oil and Gas Management Plan Environmental Impacts Statement, Big Thicket National Preserve, Texas |
|
Other |
Sanchez Oil and Gas Corporation's WM Rice #1 Well |
Project Termination Notice - Sanchez Oil and Gas Corporation WM Rice #1 Well |
|
Other |
Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
Temporary Access Permit - Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
|
Other Permit |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
Categorical Exclusion Form - Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
|
Other Permit |
Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
Seismic Assistants, Ltd's. Cultural Resource Survey in the Big Sandy Creek Corridor Unit, Turkey Creek Corridor Unit, and Village Creek Corridor Unit of the Big Thicket National Preserve in Hardin and Tyler Counties, Texas, Research Design |
|
Other Permit |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
Scope of Work - Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Characterize and Delineate Contamination |
|
Other Permit |
Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
Plan of Operations - Cimarex Energy Co. Sour Lake 3-D Seismic Survey |
|
Other |
Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
Categorical Exclusion Form - Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
|
Other Permit |
Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
ARPA Permit - Seismic Assistants Ltd Supplemental Temporary Access Permit to Conduct a Cultural Resources Survey |
|
Other Permit |
Buford Curtis, Inc. Rafferty Fee #1 Wellsite - Plan of Operations for Reclamation |
Categorical Exclusion Form Regarding the Plan of Operations - Buford Curtis, Inc. Rafferty Fee Well #1 Site Reclamation |
|
Other Permit |
Environmental Assessment of the Proposed Century Exploration Houston, LLC Phineas #3 and Wiley Coyote Wells |
FONSI |
|
Other |
Kerr McGee Oil & Gas Onshore LP's Kountze 3-D Seismic Survey - Plan of Operations Supplement |
Environmental Screening Form - Kerr McGee Kountze 3-D Plan Supplement |
|
Other |
Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Vegetation Sampling and Mapping |
Temporary Access Permit - Seismic Assistants, Ltd. Temporary Access Permit Request to Conduct Vegetation Sampling and Mapping |
|
Other Permit |