PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Finding of No Significant Impact for Peoples Energy Production - Texas, LP Proposal to Directionally Drill and Produce the Vastar Unit 2A No. 2 Well from a Surface Location Outside the Beaumont Unit Big Thicket National Preserve Hardin and Orange Counties, Texas


FONSI signed by acting Intermountain Regional Director Michael D. Snyder on November 10, 2005.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.