PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey

Big Thicket National Preserve » Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey » Document List

Krescent Energy Company, LLC has proposed to conduct the Tyler "Cable-Only" 3-D Seismic Survey in the Upper Neches River Corridor Unit of the Big Thicket National Preserve in Jasper and Tyler Counties, Texas.

Krescent’s proposed “cable-only” seismic survey within the Unit is part of the 127-square mile Tyler 3-D Survey. Krescent proposes to use “cable-only” methodology within the Unit. This means that no shot holes would be drilled and no explosive charges would be detonated within the Unit. Therefore, operations in the Unit would be limited to surveying the receiver lines, laying of cables and geophones to receive and transmit vibration from source points located outside the Preserve, picking up equipment, and cleanup or reclamation. A minimal amount of vegetation would be trimmed to obtain lines of sight for the survey equipment and for single file passage by foot down the receiver lines.

Contact Information

Haigler "Dusty" Pate
Oil and Gas Program Manager
3785 Milam Street
Beaumont, TX 77701
409 951-6822
haigler_pate@nps.gov