Project Links
Big Thicket National Preserve » Directional Drilling (Trigger #1) - EA » Document List » Document Contents
Public Scoping Document
Draft chapter 1 from EA with list of potential impact topics.
Comment Period:
Closed
Sep 15, 2022 - Sep 30, 2022
|
Topic Questions: |
1. How will potential impacts from the proposed action impact resources of concern at Big Thicket National Preserve |
Document Content: |
Public Scoping Document.docx
(415.6 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |