PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Proposal to Improve a Natural Gas Pipeline Right-of-Way for Maintenance Access and to Lower a Segment of Exposed and Suspended Pipe in Big Sandy Creek within the Big Sandy Creek Unit of Big Thicket National Preserve


Proposal to Improve a Natural Gas Pipeline Right-of-Way for Maintenance Access and to Lower a Segment of Exposed and Suspended Pipe in Big Sandy Creek within the Big Sandy Creek Unit of Big Thicket National Preserve
 
Comment Period: Closed        Jul 20, 2012 - Aug 20, 2012
Document Content:
Environmental Assessment   (22.6 MB, PDF file)
Appendix A   (2.8 MB, PDF file)
Appendix B   (693.3 KB, PDF file)
Appendix C   (1.9 MB, PDF file)
Appendix D   (3.3 MB, PDF file)
Appendix E   (3.0 MB, PDF file)
Appendix F   (285.2 KB, PDF file)
Appendix H   (84.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.