PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Endeavor Natural Gas LP Blackstone Minerals Well #B-2 Re-Entry EA


Endeavor Natural Gas LP Blackstone Minerals Well #B-2 Re-Entry Environmental Assessment.

There are five (5) documents posted for this EA:

Body of the EA
Appendix A
Appendix B
Appendix C
Appendix D

These documents were posted seperately for ease of downloading.
 
Comment Period: Closed        Sep 21, 2009 - Oct 21, 2009
Document Content:
Endeavor EA   (1.0 MB, PDF file)
Appendix A   (2.5 MB, PDF file)
Appendix B   (42.8 KB, PDF file)
Appendix C   (16.4 KB, PDF file)
Appendix D   (11.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.