PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Proposal to Drill and Produce the Fort Apache Energy, Inc. Baptist Foundation #1 and Nordin #1 Wells from Surface Locations Outside Big Thicket National Preserve Tyler County, Texas


Proposal to Drill and Produce the Fort Apache Energy, Inc. Baptist Foundation #1 and Nordin #1 Wells from Surface Locations Outside Big Thicket National Preserve Tyler County, Texas
 
Comment Period: Closed        May 21, 2013 - Jun 22, 2013
Document Content:
Scoping Notice   (547.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.