Finding of No Significant Impact (FONSI)


This is the decision document, signed by the Intermountain Regional Director on August 28, 2008.
 
Document Content:
Signed FONSI 8.28.08   (4.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.