Project Links
Big Thicket National Preserve » Krescent Energy Company, LLC Tyler "Cable-Only" 3-D Seismic Survey » Document List » Document Contents
Krescent Energy Company LP's Plan of Operations for the Tyler "Cable-Only" 3-D Seismic Survey
Per 36 CFR 9.52(b) regarding public inspection of documents, please see the Plan of Operations for Krescent Energy Company LP's Tyler "Cable-Only" 3-D Seismic Survey below.
Comment Period:
Closed
Sep 2, 2005 - Oct 3, 2005
|
Document Content: |
Plan of Operations Appendix A Topo Map
(2.9 MB, PDF file)
Plan of Operations Appendix A Aerial Map
(3.9 MB, PDF file)
Plan of Operations - Krescent Tyler Cable-Only 3-D
(1.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |