Project Links
Gates Of The Arctic National Park and Preserve » Ambler Mining District Industrial Access Project EEA » Document List » Document Contents
Revised ROW Application, SF-299_06-30-2016
Included below is the full revised final application package received from Alaska Industrial Development and Export Authority (AIDEA) on June 30, 2016. Note that this consolidated application was submitted to the NPS, BLM, U.S. Coast Guard, and U.S. Army Corps of Engineers and includes materials for the entire 211-mile proposed Ambler Mining District Industrial Access Project route.
Information specific to the ca. 20 mile NPS portion of the proposed route is located within this consolidated application.