Yellowstone Justice Center |
Yellowstone Justice Center Environmental Assessment |
Nov 24, 2004 |
Other |
Old Faithful Visitor Education Center |
Old Faithful Visitor Education Center Environmental Assessment |
Mar 10, 2005 |
Capital Improvement/New Construction |
Proposed Changes in 2006 Fishing Regulations |
Proposed Changes to 2006 Fishing Regulations |
Aug 31, 2005 |
Other |
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed |
Westslope Cutthroat Trout Restoration Public Scoping Newsletter |
Nov 30, 2005 |
Restoration |
ARRA - Madison Area Wastewater Treatment Project Environmental Assessment |
Madison Area Wastewater Treatment Project Environmental Assessment |
Dec 05, 2005 |
Capital Improvement/New Construction |
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed |
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed Environmental Assessment |
Jun 07, 2006 |
Restoration |
Tower-Roosevelt Comprehensive Plan |
Scoping Letter for Tower-Roosevelt Comprehensive Plan |
Jun 30, 2006 |
Other |
Canyon Rim Drives 3R Road Project |
Letter announcing Environmental Assessment is available for public review and comment. |
Jul 03, 2006 |
Capital Improvement/New Construction |
Canyon Rim Drives 3R Road Project |
Canyon Rim Drives Road Rehabilitaiton, Environmental Assessment (EA) |
Jul 03, 2006 |
Capital Improvement/New Construction |
Stephen's Creek Administrative Area EA |
Stephens Creek Administrative Area EA |
Jul 14, 2006 |
Other |
Wireless Communication Services Plan Environmental Assessment |
Wireless Communication Services Plan Environmental Assessment Scoping Newsletter |
Aug 31, 2006 |
Other |
Lamar River Bridge |
Scoping Brochure - Lamar River Bridge |
Aug 28, 2008 |
Repair/Rehabilitation |
Wireless Communication Services Plan Environmental Assessment |
Wireless Communications Services Plan, Environmental Assessment |
Oct 31, 2008 |
Other |
Interim Winter Use Plan 2009 |
2008 Winter Use Plans Environmental Assessment |
Nov 17, 2008 |
Other |
Tower-Roosevelt Comprehensive Plan |
Tower-Roosevelt Comprehensive Plan Environmental Assessment |
Jul 09, 2009 |
Other |
Lamar River Bridge |
Lamar River Bridge Environmental Assessment |
Sep 25, 2009 |
Repair/Rehabilitation |
Old Faithful Area Comprehensive Plan |
Scoping Newsletter |
Jun 07, 2010 |
Other |
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA |
Scoping Letter & Existing Conditons Map |
Jun 18, 2010 |
Other |
Lake Area Comprehensive Plan/EA |
Lake Area Comprehensive Plan/EA Scoping Newsletter |
Aug 06, 2010 |
Other |
Snake River Headwaters Comprehensive River Management Plan |
Snake River Headwaters - Newsletter #1 |
Dec 31, 2010 |
Wild and Scenic Comprehensive River Management Plan |
Native Fish Conservation Plan Environmental Assessment |
Native Fish Conservation Plan Environmental Assessment |
Jan 31, 2011 |
Other |
Norris-Golden Gate Road Reconstruction Project |
Norris to Golden Gate Road Reconstruction EA |
Jun 13, 2011 |
Capital Improvement/New Construction |
Winter Use Plan/EIS |
Yellowstone Draft Winter Use Plan/Draft Environmental Impact Statement |
Jul 18, 2011 |
Implementation Plan - Other |
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA |
North Entrance/Park Street Improvement Plan/Environmental Assessment |
Aug 13, 2011 |
Other |
Old Faithful Cabin Repurposing and Dormitory Construction EA |
Scoping Newsletter |
Dec 20, 2011 |
Implementation Plan - Other |
Wildland Fire Management Plan |
Scoping Letter |
Dec 22, 2011 |
Fire Management Plan |
World Heritage State of Conservation Report |
State Party’s Report on the State of Conservation of its Property Inscribed on the World Heritage List |
Jan 20, 2012 |
Other |
Old Faithful Cabin Repurposing and Dormitory Construction EA |
Old Faithful Cabin Repurposing and Dormitory Construction Environmental Assessment |
Feb 26, 2012 |
Implementation Plan - Other |
Lake Area Comprehensive Plan/EA |
Lake Area Comprehensive Plan / Environmental Assessment (LACP/EA) |
Mar 02, 2012 |
Other |
2012/2013 Supplemental Winter Use Plan EIS |
Notice of Intent to Prepare a Supplemental EIS--Yellowstone Winter Use |
Mar 09, 2012 |
Implementation Plan - Other |
Isa Lake Bridge Reconstruction EA |
Isa Lake Bridge Reconstruction Scoping Newsletter |
Aug 24, 2012 |
Other |
2012/2013 Supplemental Winter Use Plan EIS |
Draft Winter Use Plan/Supplemental EIS |
Oct 09, 2012 |
Implementation Plan - Other |
Wildland Fire Management Plan |
Yellowstone National Park Wildland Fire Management Plan/Environmental Assessment |
Oct 19, 2012 |
Fire Management Plan |
Lake Cell Tower |
Lake Cell Tower and EA Amendment Notice |
Dec 17, 2012 |
Right-of-Way Permit |
Proposed Campground Fee Rate Increase |
Yellowstone Proposes Campground Fee Rate Increase |
Feb 28, 2013 |
Other |
Invasive Vegetation Management Plan/Environmental Assessment |
Invasive Vegetation Management Plan/EA, Yellowstone National Park |
Mar 22, 2013 |
Invasive Species Management Plan |
Isa Lake Bridge Reconstruction EA |
Isa Lake Bridge Reconstruction Environmental Assessment |
Apr 14, 2013 |
Other |
Parkwide Commercial Stock Outfitter Concession Contracts/EA |
Parkwide Commercial Stock Outfitter Concessions Contract EA Scoping Newsletter |
Apr 15, 2013 |
Commercial Services Plan |
Bechler Administrative Area Improvement Plan Environmental Assessment |
Bechler Administrative Area Improvement Plan/Environmental Assessment |
May 05, 2013 |
Repair/Rehabilitation |
Snake River Headwaters Comprehensive River Management Plan |
Snake River Headwaters Comprehensive River Management Plan and Environmental Assessment |
Jun 30, 2013 |
Wild and Scenic Comprehensive River Management Plan |
Isa Lake Bridge EA Ammendment to Allow for a Road Closure During Construction |
Road Closure CE |
Oct 01, 2013 |
Repair/Rehabilitation |
Northwestern Energy Communication and Automation Plan |
Electric Transmission/Distribution System Communication & Automation Plan EA |
Dec 21, 2013 |
Capital Improvement/New Construction |
Parkwide Commercial Stock Outfitter Concession Contracts/EA |
Parkwide Commercial Stock Outfitter Concession Contracts EA |
Jan 10, 2014 |
Commercial Services Plan |
Lamar Buffalo Ranch Sustainable Energy Project |
Lamar Buffalo Ranch Sustainability Project Press Release |
May 09, 2014 |
Implementation Plan - Other |
Lamar Buffalo Ranch Sustainable Energy Project |
Lamar Buffalo Ranch Sustainable Energy Project - Environmental Assessment |
Aug 15, 2014 |
Implementation Plan - Other |
Old Faithful Force Main Sewer Replacement Project |
Old Faithful Sewer Replacement Scoping Notice |
Aug 18, 2014 |
Repair/Rehabilitation |
Old Faithful Force Main Sewer Replacement Project |
Draft Old Faithful Force Main Sewer Replacement Project CE Package |
Sep 04, 2014 |
Repair/Rehabilitation |
Yellowstone Bison Quarantine Plan EA |
Yellowstone Bison Quarantine Plan Scoping Notice |
Sep 12, 2014 |
Resource Management |
Yellowstone Youth Campus Plan EA |
Yellowstone YCC Campus Plan EA Scoping Notice |
Sep 26, 2014 |
Implementation Plan - Other |
Update and Repair Canyon Rim Overlooks and Trails |
Yellowstone Seeks Public Input On Proposal To Update And Repair Canyon Rim Overlooks and Trails |
Oct 24, 2014 |
Implementation Plan - Other |
Entrance and Backcountry Fee Proposal |
Overnight Backcountry Permit Fee Proposal |
Dec 20, 2014 |
Other Plan |
Entrance and Backcountry Fee Proposal |
Entrance Fee Proposal |
Dec 20, 2014 |
Other Plan |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
Scoping Notice |
Dec 21, 2014 |
Implementation Plan - Other |
Yellowstone World Heritage Report 2014 |
Yellowstone World Heritage Report 2014 |
Jan 11, 2015 |
Other Natural/Cultural Resource Activities |
Soda Butte Creek Native Fish Restoration Project |
Soda Butte Creek Native Fish Restoration Project Draft CE |
Jun 19, 2015 |
Restoration |
Winter Use Adaptive Management Plan |
Draft Winter Use Adaptive Management Plan |
Aug 21, 2015 |
Other Plan |
Update and Repair Canyon Rim Overlooks and Trails |
Environmental Assessment (EA) - Canyon Rim Overlooks and Trails Rehabilitation |
Sep 16, 2015 |
Implementation Plan - Other |
Bridge Replacement - Bighorn Pass Trail |
Potential Bridge Replacement - Bighorn Pass Trail |
Feb 03, 2016 |
Reconstruction |
Yellowstone Bison Quarantine Plan EA |
Environmental Assessment for the Use of Quarantine to Identify Brucellosis-free Yellowstone Bison for Relocation Elsewhere |
Feb 29, 2016 |
Resource Management |
Reconstruct road from Fishing Bridge to Indian Pond |
Scoping Brochure - Fishing Bridge to Indian Pond |
Mar 15, 2016 |
Implementation Plan - Other |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Proposed Changes to Mount Washburn and Other Park Areas |
Mar 22, 2017 |
Implementation Plan - Other |
Fairy Falls Trailhead Temporary Parking Area |
Fairy Falls Additional Information |
Apr 01, 2017 |
Capital Improvement/New Construction |
Reconstruct road from Fishing Bridge to Indian Pond |
Environmental Assessment - Fishing Bridge to Indian Pond Road Reconstruction |
May 26, 2017 |
Implementation Plan - Other |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Determination of Effect Documents for Section 106 |
Jun 22, 2017 |
Implementation Plan - Other |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
National Ecological Observatory Network, Northern Rockies - Domain 12, Environmental Assessment |
Jul 18, 2017 |
Implementation Plan - Other |
Yellowstone Youth Campus Plan EA |
Yellowstone Youth Campus, Environmental Assessment |
Aug 11, 2017 |
Implementation Plan - Other |
Two Ocean Trail Plateau Project |
Two Ocean Plateau and Trail Creek Trail Project |
Nov 18, 2017 |
Repair/Rehabilitation |
Mammoth Hotel Guest Wing Renovation |
NHPA Section 106 Adverse Effect to the Mammoth Hot Springs Hotel |
Feb 16, 2018 |
Repair/Rehabilitation |
Lewis River Bridge Replacement |
Scoping Brochure - Lewis River Bridge |
Jul 23, 2018 |
Reconstruction |
Lewis River Bridge Replacement |
Lewis River Bridge Replacement, Environmental Assessment |
Nov 30, 2018 |
Reconstruction |
Yellowstone National Park Concessionaire Housing EA |
Concessions Housing Scoping Brochure |
Feb 28, 2019 |
Reconstruction |
Yellowstone National Park Concessionaire Housing EA |
Concessionaire Housing Environmental Assessment |
Jun 14, 2019 |
Reconstruction |
Replace the Yellowstone River Bridge |
Yellowstone River Bridge Replacement EA |
Mar 15, 2020 |
Reconstruction |
Access Parks - Broadband Internet for Employees and Visitors |
UPDATED AccessParks Proposal with photosimulations |
Jun 10, 2020 |
Construction Permit |
Fiber Optic Cable Installation |
Project Scoping Brochure |
Oct 21, 2020 |
Implementation Plan - Other |
Winter Use Adaptive Management Adjustments - East Entrance Dates/South Entrance Times |
Proposal Newsletter |
Oct 29, 2020 |
Concessions |
Fiber Optic Cable Installation |
Environmental Assessment (EA) |
Apr 21, 2021 |
Implementation Plan - Other |
Changes to Yellowstone Winter Wildlife Monitoring Program |
Winter Use Monitoring Summary of Findings |
Nov 01, 2021 |
Inventory and Monitoring |
Programmatic Yellowstone Commercial Use Authorization Plan |
Commercial Use Authorization (CUA) Operating Plan |
Nov 23, 2021 |
Concessions |
Yellowstone National Park Bison Management Plan |
EIS - - Public Scoping Notices |
Feb 28, 2022 |
Ungulate Management Plan |
Buffalo Creek Native Fish Restoration Environmental Assessment |
Buffalo Creek Native Fish Restoration Environmental Assessment |
Aug 25, 2023 |
Resource Management |
Yellowstone National Park Bison Management Plan |
Draft Environmental Impact Statement for Bison Management |
Oct 10, 2023 |
Ungulate Management Plan |
North Entrance Road Reconstruction Project |
North Entrance Road Civic Engagement |
Mar 13, 2024 |
Reconstruction |
Proposal to Implement Certain Restrictions for Launch of Some Types of Motorized Boats to Reduce the Risk of Aquatic Invasive Species |
Yellowstone Proposal to Reduce AIS |
Apr 05, 2024 |
Other Permit |
Northeast Entrance Road Reconstruction Project |
Northeast Entrance Road Construction Project - Public Scoping |
Dec 03, 2024 * |
Reconstruction |
Winter Use Plan/EIS |
Yellowstone Final Winter Use Plan/Environmental Impact Statement |
|
Implementation Plan - Other |
Old Faithful Cabin Repurposing and Dormitory Construction EA |
FONSI |
|
Implementation Plan - Other |
2012/2013 Supplemental Winter Use Plan EIS |
Final Winter Use Plan/Supplemental EIS |
|
Implementation Plan - Other |
Lake Cell Tower |
May 24 2008 Request for Concurrence Lake Cell Tower |
|
Right-of-Way Permit |
Northwestern Energy Communication and Automation Plan |
YNP to GNF transmittal of final report and SHPO concurrence letters 03-03-14 |
|
Capital Improvement/New Construction |
Remote Delivery Bison Vaccination Program |
Record of Decision for Remote Vaccination of Bison |
|
Other |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
Press Release - NEON Project Proposal |
|
Implementation Plan - Other |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
NEON FONSI |
|
Implementation Plan - Other |
Yellowstone Bison Quarantine Plan EA |
FONSI |
|
Resource Management |
Access Parks - Broadband Internet for Employees and Visitors |
Access Parks, Broadband Internet for Employees and Visitors |
|
Construction Permit |
Old Faithful Visitor Education Center |
Finding of No Significant Impact (FONSI) for the Old Faithful Visitor Education Center Environmental Assessment |
|
Capital Improvement/New Construction |
ARRA - Madison Area Wastewater Treatment Project Environmental Assessment |
Madison Area Wastewater Treatment Project Finding of No Significant Impact (FONSI) and ERRATA Sheet |
|
Capital Improvement/New Construction |
Tower-Roosevelt Comprehensive Plan |
FONSI Tower-Roosevelt Comprehensive Plan |
|
Other |
Lamar River Bridge |
FONSI 11.23.09 |
|
Repair/Rehabilitation |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 021 |
|
Implementation Plan - Other |
Commercial Use Authorization Plan |
Commercial Use Authorization Plan |
|
Commercial Use Authorization |
Lake Cell Tower |
Categorical Exclusion - Signed |
|
Right-of-Way Permit |
Northwestern Energy Communication and Automation Plan |
Letter from MT SHPO to GNF 01-27-14 |
|
Capital Improvement/New Construction |
Northwestern Energy Communication and Automation Plan |
Letter from MT SHPO to YNP 01-27-14 |
|
Capital Improvement/New Construction |
Bechler Administrative Area Improvement Plan Environmental Assessment |
FONSI |
|
Repair/Rehabilitation |
Winter Use Adaptive Management Plan |
N-CGSAP Annual Report 2014-2015 |
|
Other Plan |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
MOA Completion Report |
|
Implementation Plan - Other |
Yellowstone National Park Bison Management Plan |
Record of Decision for a Bison Management Plan |
|
Ungulate Management Plan |
Lake Cell Tower |
WY SHPO Letter (related infrastructure) |
|
Right-of-Way Permit |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 012 |
|
Implementation Plan - Other |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 022 |
|
Implementation Plan - Other |
Lake Cell Tower |
Photo Simulation 3 |
|
Right-of-Way Permit |
Northwestern Energy Communication and Automation Plan |
Initial Consultation WY SHPO 05-13-13 |
|
Capital Improvement/New Construction |
2012/2013 Supplemental Winter Use Plan EIS |
Proposed Winter Use Regulation |
|
Implementation Plan - Other |
Commercial Use Authorization Plan |
Biking Operating Plan |
|
Commercial Use Authorization |
Commercial Use Authorization Plan |
Overnight Backcountry Trip Operating Plan |
|
Commercial Use Authorization |
Parkwide Commercial Stock Outfitter Concession Contracts/EA |
Public Scoping Presentation |
|
Commercial Services Plan |
Northwestern Energy Communication and Automation Plan |
WY SHPO response to the reformatted/revised report |
|
Capital Improvement/New Construction |
Snake River Headwaters Comprehensive River Management Plan |
CRMP/EA Maps |
|
Wild and Scenic Comprehensive River Management Plan |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Corrospondence for Section 106 of NHPA |
|
Implementation Plan - Other |
Yellowstone National Park Employee Housing Improvements |
Goal 1 Trailer Replacement |
|
Equipment Replacement |
Fiber Optic Cable Installation |
Finding of No Significant Impact (FONSI) |
|
Implementation Plan - Other |
Programmatic Yellowstone Commercial Use Authorization Plan |
Activity Operating Plans |
|
Concessions |
Yellowstone National Park Bison Management Plan |
Final Environmental Impact Statement for Bison Management |
|
Ungulate Management Plan |
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA |
Designs Presented at Public Scoping June 8, 2010 |
|
Other |
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA |
Finding of No Significant Impact (FONSI) |
|
Other |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 041 |
|
Implementation Plan - Other |
Lake Cell Tower |
Construction Drawings |
|
Right-of-Way Permit |
Commercial Use Authorization Plan |
Motorized Boat Operating Plan |
|
Commercial Use Authorization |
Lake Cell Tower |
WYSHPO Response_Concur with Alternative C Dec 10 2008 |
|
Right-of-Way Permit |
Lake Cell Tower |
Request for Concurrence on Alternative C Sept 22 2008 MTSHPO |
|
Right-of-Way Permit |
Lake Cell Tower |
Sept 16 2008 Notice Request for Review of EA |
|
Right-of-Way Permit |
Lake Cell Tower |
Aug 24 2012 Request for Concurrence Data Cable |
|
Right-of-Way Permit |
Lake Cell Tower |
Lake Cell Tower GE text |
|
Right-of-Way Permit |
Lake Cell Tower |
Environmental Screening Form - Signed |
|
Right-of-Way Permit |
Northwestern Energy Communication and Automation Plan |
Finding of No Significant Impact (FONSI) - Electric Transmission/Distribution System Communication Plan |
|
Capital Improvement/New Construction |
Parkwide Commercial Stock Outfitter Concession Contracts/EA |
Parkwide Commercial Stock Outfitter Concession Contracts EA FONSI |
|
Commercial Services Plan |
Lamar Buffalo Ranch Sustainable Energy Project |
SIGNED FONSI |
|
Implementation Plan - Other |
Soda Butte Creek Native Fish Restoration Project |
Piscicide Related Appendices |
|
Restoration |
Soda Butte Creek Native Fish Restoration Project |
Soda Butte Creek Restoration Project Signed CE & Comment Response |
|
Restoration |
Wireless Communication Services Plan Environmental Assessment |
Wireless Telecommunications Committee Annual Reports |
|
Other |
Reconstruct road from Fishing Bridge to Indian Pond |
YELL Fishing Bridge to Indian Pond Road Reconstruction FONSI and Wetland SOF Signed |
|
Implementation Plan - Other |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Public Scoping Comments |
|
Implementation Plan - Other |
Yellowstone National Park Concessionaire Housing EA |
YELL Concessionaire Housing FONSI Signed |
|
Reconstruction |
Wireless Communication Services Plan Environmental Assessment |
Wireless Communications Services Plan FONSI |
|
Other |
Lake Area Comprehensive Plan/EA |
YELL Lake Area Comprehensive Plan/EA FONSI Signed 4.17.12 |
|
Other |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 025 |
|
Implementation Plan - Other |
Snake River Headwaters Comprehensive River Management Plan |
Snake River Headwaters - Issues and Opportunities |
|
Wild and Scenic Comprehensive River Management Plan |
Lake Cell Tower |
Photo Simulation 1 |
|
Right-of-Way Permit |
Lake Cell Tower |
Crane Photo 3 |
|
Right-of-Way Permit |
Lake Cell Tower |
SHPO Letter - Data Cable |
|
Right-of-Way Permit |
Northwestern Energy Communication and Automation Plan |
Initial Consultation Letter-MT SHPO 05-13-13 |
|
Capital Improvement/New Construction |
Commercial Use Authorization Plan |
Day Hiking Operating Plan |
|
Commercial Use Authorization |
Commercial Use Authorization Plan |
Photography Operating Plan |
|
Commercial Use Authorization |
Lake Cell Tower |
Proposed Lake Cell Tower Map |
|
Right-of-Way Permit |
Lake Cell Tower |
Sept 24 2012 Request for Concurrence Equipment Building |
|
Right-of-Way Permit |
Lake Cell Tower |
Sept 16 2008 Tribal Request for Review of EA |
|
Right-of-Way Permit |
2012/2013 Supplemental Winter Use Plan EIS |
Record of Decision for the Winter Use Plan/Supplemental EIS |
|
Implementation Plan - Other |
Isa Lake Bridge Reconstruction EA |
FONSI |
|
Other |
Snake River Headwaters Comprehensive River Management Plan |
Snake River Headwaters FONSI |
|
Wild and Scenic Comprehensive River Management Plan |
Northwestern Energy Communication and Automation Plan |
Letter from WY SHPO to YNP 12-04-13 |
|
Capital Improvement/New Construction |
Remote Delivery Bison Vaccination Program |
Final EIS for Remote Vaccination Program to Reduce the Prevalence of Brucellosis in Yellowstone Bison |
|
Other |
Soda Butte Creek Native Fish Restoration Project |
Map of Project Area |
|
Restoration |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Signal Propagation Maps |
|
Implementation Plan - Other |
Data Recovery at the Donner Site |
|
|
Other |
Tower-Roosevelt Comprehensive Plan |
Tower-Roosevelt Comprehensive Plan |
|
Other |
Native Fish Conservation Plan Environmental Assessment |
FONSI Native Fish Conservation Plan |
|
Other |
Norris-Golden Gate Road Reconstruction Project |
FONSI.Signed 10.21.11 |
|
Capital Improvement/New Construction |
Canyon Lodging Redevelopment Project |
Briefing Packet Canyon Cabins MOA |
|
Implementation Plan - Other |
Lake Cell Tower |
WYSHPO Response Preference for Alt B October 22 2008 |
|
Right-of-Way Permit |
Lake Cell Tower |
Request for Concurrence on Alternative C Sept 22 2008 IDSHPO |
|
Right-of-Way Permit |
Lake Cell Tower |
Response to Substantive Comments from the Public |
|
Right-of-Way Permit |
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA |
Gardiner's Historic Resources |
|
Other |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
Summary of NEON proposal |
|
Implementation Plan - Other |
Winter Use Adaptive Management Plan |
Yellowstone National Park Winter Use Adaptive Management Plan |
|
Other Plan |
Yellowstone Youth Campus Plan EA |
Yellowstone Youth Campus FONSI |
|
Implementation Plan - Other |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
Signed Categorical Exclusion |
|
Implementation Plan - Other |
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas |
List of all commercial communications equipment currently located on or near the Mount Washburn Fire Lookout |
|
Implementation Plan - Other |
Yellowstone Justice Center |
Yellowstone Justice Center Finding of No Significant Impact (FONSI) |
|
Other |
Tower-Roosevelt Comprehensive Plan |
News Release |
|
Other |
Old Faithful Area Comprehensive Plan |
Summary of Public Scoping Comments |
|
Other |
Lake Area Comprehensive Plan/EA |
Lake Area Comprehensive Plan |
|
Other |
2012/2013 Supplemental Winter Use Plan EIS |
Winter Use Plan/Supplemental EIS Scoping Newsletter |
|
Implementation Plan - Other |
Lake Cell Tower |
Lake Cell Tower Categorical Exclusion (CE) |
|
Right-of-Way Permit |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 011 |
|
Implementation Plan - Other |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 018 |
|
Implementation Plan - Other |
Canyon Lodging Redevelopment Project |
Photo of Canyon Mission 66 Cabin A and C Loop Survey 047 |
|
Implementation Plan - Other |
Lake Cell Tower |
Proposal for New Wireless Service |
|
Right-of-Way Permit |
Lake Cell Tower |
Crane Photo 1 |
|
Right-of-Way Permit |
Lake Cell Tower |
Wyoming SHPO Letter of Concurrence |
|
Right-of-Way Permit |
Commercial Use Authorization Plan |
Road-based Transportation Operating Plan |
|
Commercial Use Authorization |
Northwestern Energy Communication and Automation Plan |
YNP Letter to MT & WY SHPOs - EA Release 11-07-13 |
|
Capital Improvement/New Construction |
Northwestern Energy Communication and Automation Plan |
Letter from YNP to WYSHPO 01-08-14 |
|
Capital Improvement/New Construction |
Northwestern Energy Communication and Automation Plan |
YNP electronic submittal of reformatted report to WY SHPO 02-20-14 |
|
Capital Improvement/New Construction |
2012/2013 Supplemental Winter Use Plan EIS |
Winter Use Final Rule |
|
Implementation Plan - Other |
Update and Repair Canyon Rim Overlooks and Trails |
Appendix C- Schematic Design - Canyon Rim Overlooks and Trails Rehabilitation |
|
Implementation Plan - Other |
Reconstruct road from Fishing Bridge to Indian Pond |
Public Scoping for Fishing Bridge to Indian Pond Road Segment |
|
Implementation Plan - Other |
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed |
FONSI for Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed |
|
Restoration |
Canyon Rim Drives 3R Road Project |
Finding of No Significant Impact (FONSI) |
|
Capital Improvement/New Construction |
Interim Winter Use Plan 2009 |
2009 Winter Use Plan Finding of No Significant Impact |
|
Other |
Winter Use Plan/EIS |
Scientific Assessment of Yellowstone National Park Winter Use |
|
Implementation Plan - Other |
Canyon Lodging Redevelopment Project |
Canyon Cabin Removal Map |
|
Implementation Plan - Other |
Lake Cell Tower |
Signal Propagation Map |
|
Right-of-Way Permit |
Lake Cell Tower |
Photo Simulation 2 |
|
Right-of-Way Permit |
Lake Cell Tower |
Crane Photo 2 |
|
Right-of-Way Permit |
2012/2013 Supplemental Winter Use Plan EIS |
Public Meeting Presentation for the Draft Winter Use Plan/Supplemental EIS |
|
Implementation Plan - Other |
Northwestern Energy Communication and Automation Plan |
Initial Consultation Letter-ACHP 05-12-2013 |
|
Capital Improvement/New Construction |
Wildland Fire Management Plan |
Wildland Fire Management Plan FONSI_Signed 022513 |
|
Fire Management Plan |
Commercial Use Authorization Plan |
Fishing Operating Plan |
|
Commercial Use Authorization |
Commercial Use Authorization Plan |
Non-motorized Boating Operating Plan |
|
Commercial Use Authorization |
Lake Cell Tower |
July 26 2006 Tribal and Public Notice Mailing |
|
Right-of-Way Permit |
Lake Cell Tower |
WYSHPO Response Mt Washburn Design Standards |
|
Right-of-Way Permit |
Lake Cell Tower |
Sept 19 2008 Request for Concurrence WYSHPO |
|
Right-of-Way Permit |
Invasive Vegetation Management Plan/Environmental Assessment |
Yellowstone Invasive Vegetation Mangement Plan/EA Finding of No Signfiicant Impact |
|
Invasive Species Management Plan |
Northwestern Energy Communication and Automation Plan |
Letter from MT SHPO to YNP 01-17-14 |
|
Capital Improvement/New Construction |
Northwestern Energy Communication and Automation Plan |
ACHP letter to YNP 02-20-14 |
|
Capital Improvement/New Construction |
National Ecological Observatory Network NEON Monitoring Site in Yellowstone |
Presentation of NEON Proposal |
|
Implementation Plan - Other |
Update and Repair Canyon Rim Overlooks and Trails |
Finding of No Significant Impact (FONSI) - Signed Copy |
|
Implementation Plan - Other |
Bridge Replacement - Bighorn Pass Trail |
Bighorn Pass Trail Bridge - Map |
|
Reconstruction |
Lewis River Bridge Replacement |
Finding of No Significant Impact (FONSI) |
|
Reconstruction |
Yellowstone National Park Concessionaire Housing EA |
Area(s) of Potential Effect |
|
Reconstruction |
Replace the Yellowstone River Bridge |
YELL Yellowstone River Bridge Replacement FONSI Signed |
|
Reconstruction |