Yellowstone National Park - All Documents and Projects

Intermountain » Idaho, Montana, Wyoming

Listed in the table below are plans or projects and associated documents that have been posted to the public for the selected NPS unit. Click on the project title for more information on the whole project or on the document title for information on the specific document.

For general information, use the 'Park/Unit Information' link to the left to go to the park's main internet page to access park information not related to park planning (for example, park brochures, lodging and campground reservations, and general park information).

Project Title Document Title Review End Project Type
Yellowstone Justice Center Yellowstone Justice Center Environmental Assessment Nov 24, 2004 Other
Old Faithful Visitor Education Center Old Faithful Visitor Education Center Environmental Assessment Mar 10, 2005 Capital Improvement/New Construction
Proposed Changes in 2006 Fishing Regulations Proposed Changes to 2006 Fishing Regulations Aug 31, 2005 Other
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed Westslope Cutthroat Trout Restoration Public Scoping Newsletter Nov 30, 2005 Restoration
ARRA - Madison Area Wastewater Treatment Project Environmental Assessment Madison Area Wastewater Treatment Project Environmental Assessment Dec 05, 2005 Capital Improvement/New Construction
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed Environmental Assessment Jun 07, 2006 Restoration
Tower-Roosevelt Comprehensive Plan Scoping Letter for Tower-Roosevelt Comprehensive Plan Jun 30, 2006 Other
Canyon Rim Drives 3R Road Project Letter announcing Environmental Assessment is available for public review and comment. Jul 03, 2006 Capital Improvement/New Construction
Canyon Rim Drives 3R Road Project Canyon Rim Drives Road Rehabilitaiton, Environmental Assessment (EA) Jul 03, 2006 Capital Improvement/New Construction
Stephen's Creek Administrative Area EA Stephens Creek Administrative Area EA Jul 14, 2006 Other
Wireless Communication Services Plan Environmental Assessment Wireless Communication Services Plan Environmental Assessment Scoping Newsletter Aug 31, 2006 Other
Lamar River Bridge Scoping Brochure - Lamar River Bridge Aug 28, 2008 Repair/Rehabilitation
Wireless Communication Services Plan Environmental Assessment Wireless Communications Services Plan, Environmental Assessment Oct 31, 2008 Other
Interim Winter Use Plan 2009 2008 Winter Use Plans Environmental Assessment Nov 17, 2008 Other
Tower-Roosevelt Comprehensive Plan Tower-Roosevelt Comprehensive Plan Environmental Assessment Jul 09, 2009 Other
Lamar River Bridge Lamar River Bridge Environmental Assessment Sep 25, 2009 Repair/Rehabilitation
Old Faithful Area Comprehensive Plan Scoping Newsletter Jun 07, 2010 Other
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA Scoping Letter & Existing Conditons Map Jun 18, 2010 Other
Lake Area Comprehensive Plan/EA Lake Area Comprehensive Plan/EA Scoping Newsletter Aug 06, 2010 Other
Snake River Headwaters Comprehensive River Management Plan Snake River Headwaters - Newsletter #1 Dec 31, 2010 Wild and Scenic Comprehensive River Management Plan
Native Fish Conservation Plan Environmental Assessment Native Fish Conservation Plan Environmental Assessment Jan 31, 2011 Other
Norris-Golden Gate Road Reconstruction Project Norris to Golden Gate Road Reconstruction EA Jun 13, 2011 Capital Improvement/New Construction
Winter Use Plan/EIS Yellowstone Draft Winter Use Plan/Draft Environmental Impact Statement Jul 18, 2011 Implementation Plan - Other
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA North Entrance/Park Street Improvement Plan/Environmental Assessment Aug 13, 2011 Other
Old Faithful Cabin Repurposing and Dormitory Construction EA Scoping Newsletter Dec 20, 2011 Implementation Plan - Other
Wildland Fire Management Plan Scoping Letter Dec 22, 2011 Fire Management Plan
World Heritage State of Conservation Report State Party’s Report on the State of Conservation of its Property Inscribed on the World Heritage List Jan 20, 2012 Other
Old Faithful Cabin Repurposing and Dormitory Construction EA Old Faithful Cabin Repurposing and Dormitory Construction Environmental Assessment Feb 26, 2012 Implementation Plan - Other
Lake Area Comprehensive Plan/EA Lake Area Comprehensive Plan / Environmental Assessment (LACP/EA) Mar 02, 2012 Other
2012/2013 Supplemental Winter Use Plan EIS Notice of Intent to Prepare a Supplemental EIS--Yellowstone Winter Use Mar 09, 2012 Implementation Plan - Other
Isa Lake Bridge Reconstruction EA Isa Lake Bridge Reconstruction Scoping Newsletter Aug 24, 2012 Other
2012/2013 Supplemental Winter Use Plan EIS Draft Winter Use Plan/Supplemental EIS Oct 09, 2012 Implementation Plan - Other
Wildland Fire Management Plan Yellowstone National Park Wildland Fire Management Plan/Environmental Assessment Oct 19, 2012 Fire Management Plan
Lake Cell Tower Lake Cell Tower and EA Amendment Notice Dec 17, 2012 Right-of-Way Permit
Proposed Campground Fee Rate Increase Yellowstone Proposes Campground Fee Rate Increase Feb 28, 2013 Other
Invasive Vegetation Management Plan/Environmental Assessment Invasive Vegetation Management Plan/EA, Yellowstone National Park Mar 22, 2013 Invasive Species Management Plan
Isa Lake Bridge Reconstruction EA Isa Lake Bridge Reconstruction Environmental Assessment Apr 14, 2013 Other
Parkwide Commercial Stock Outfitter Concession Contracts/EA Parkwide Commercial Stock Outfitter Concessions Contract EA Scoping Newsletter Apr 15, 2013 Commercial Services Plan
Bechler Administrative Area Improvement Plan Environmental Assessment Bechler Administrative Area Improvement Plan/Environmental Assessment May 05, 2013 Repair/Rehabilitation
Snake River Headwaters Comprehensive River Management Plan Snake River Headwaters Comprehensive River Management Plan and Environmental Assessment Jun 30, 2013 Wild and Scenic Comprehensive River Management Plan
Isa Lake Bridge EA Ammendment to Allow for a Road Closure During Construction Road Closure CE Oct 01, 2013 Repair/Rehabilitation
Northwestern Energy Communication and Automation Plan Electric Transmission/Distribution System Communication & Automation Plan EA Dec 21, 2013 Capital Improvement/New Construction
Parkwide Commercial Stock Outfitter Concession Contracts/EA Parkwide Commercial Stock Outfitter Concession Contracts EA Jan 10, 2014 Commercial Services Plan
Lamar Buffalo Ranch Sustainable Energy Project Lamar Buffalo Ranch Sustainability Project Press Release May 09, 2014 Implementation Plan - Other
Lamar Buffalo Ranch Sustainable Energy Project Lamar Buffalo Ranch Sustainable Energy Project - Environmental Assessment Aug 15, 2014 Implementation Plan - Other
Old Faithful Force Main Sewer Replacement Project Old Faithful Sewer Replacement Scoping Notice Aug 18, 2014 Repair/Rehabilitation
Old Faithful Force Main Sewer Replacement Project Draft Old Faithful Force Main Sewer Replacement Project CE Package Sep 04, 2014 Repair/Rehabilitation
Yellowstone Bison Quarantine Plan EA Yellowstone Bison Quarantine Plan Scoping Notice Sep 12, 2014 Resource Management
Yellowstone Youth Campus Plan EA Yellowstone YCC Campus Plan EA Scoping Notice Sep 26, 2014 Implementation Plan - Other
Update and Repair Canyon Rim Overlooks and Trails Yellowstone Seeks Public Input On Proposal To Update And Repair Canyon Rim Overlooks and Trails Oct 24, 2014 Implementation Plan - Other
Entrance and Backcountry Fee Proposal Entrance Fee Proposal Dec 20, 2014 Other Plan
Entrance and Backcountry Fee Proposal Overnight Backcountry Permit Fee Proposal Dec 20, 2014 Other Plan
National Ecological Observatory Network NEON Monitoring Site in Yellowstone Scoping Notice Dec 21, 2014 Implementation Plan - Other
Yellowstone World Heritage Report 2014 Yellowstone World Heritage Report 2014 Jan 11, 2015 Other Natural/Cultural Resource Activities
Soda Butte Creek Native Fish Restoration Project Soda Butte Creek Native Fish Restoration Project Draft CE Jun 19, 2015 Restoration
Winter Use Adaptive Management Plan Draft Winter Use Adaptive Management Plan Aug 21, 2015 Other Plan
Update and Repair Canyon Rim Overlooks and Trails Environmental Assessment (EA) - Canyon Rim Overlooks and Trails Rehabilitation Sep 16, 2015 Implementation Plan - Other
Bridge Replacement - Bighorn Pass Trail Potential Bridge Replacement - Bighorn Pass Trail Feb 03, 2016 Reconstruction
Yellowstone Bison Quarantine Plan EA Environmental Assessment for the Use of Quarantine to Identify Brucellosis-free Yellowstone Bison for Relocation Elsewhere Feb 29, 2016 Resource Management
Reconstruct road from Fishing Bridge to Indian Pond Scoping Brochure - Fishing Bridge to Indian Pond Mar 15, 2016 Implementation Plan - Other
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Proposed Changes to Mount Washburn and Other Park Areas Mar 22, 2017 Implementation Plan - Other
Fairy Falls Trailhead Temporary Parking Area Fairy Falls Additional Information Apr 01, 2017 Capital Improvement/New Construction
Reconstruct road from Fishing Bridge to Indian Pond Environmental Assessment - Fishing Bridge to Indian Pond Road Reconstruction May 26, 2017 Implementation Plan - Other
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Determination of Effect Documents for Section 106 Jun 22, 2017 Implementation Plan - Other
National Ecological Observatory Network NEON Monitoring Site in Yellowstone National Ecological Observatory Network, Northern Rockies - Domain 12, Environmental Assessment Jul 18, 2017 Implementation Plan - Other
Yellowstone Youth Campus Plan EA Yellowstone Youth Campus, Environmental Assessment Aug 11, 2017 Implementation Plan - Other
Two Ocean Trail Plateau Project Two Ocean Plateau and Trail Creek Trail Project Nov 18, 2017 Repair/Rehabilitation
Mammoth Hotel Guest Wing Renovation NHPA Section 106 Adverse Effect to the Mammoth Hot Springs Hotel Feb 16, 2018 Repair/Rehabilitation
Lewis River Bridge Replacement Scoping Brochure - Lewis River Bridge Jul 23, 2018 Reconstruction
Lewis River Bridge Replacement Lewis River Bridge Replacement, Environmental Assessment Nov 30, 2018 Reconstruction
Yellowstone National Park Concessionaire Housing EA Concessions Housing Scoping Brochure Feb 28, 2019 Reconstruction
Yellowstone National Park Concessionaire Housing EA Concessionaire Housing Environmental Assessment Jun 14, 2019 Reconstruction
Replace the Yellowstone River Bridge Yellowstone River Bridge Replacement EA Mar 15, 2020 Reconstruction
Access Parks - Broadband Internet for Employees and Visitors UPDATED AccessParks Proposal with photosimulations Jun 10, 2020 Construction Permit
Fiber Optic Cable Installation Project Scoping Brochure Oct 21, 2020 Implementation Plan - Other
Winter Use Adaptive Management Adjustments - East Entrance Dates/South Entrance Times Proposal Newsletter Oct 29, 2020 Concessions
Fiber Optic Cable Installation Environmental Assessment (EA) Apr 21, 2021 Implementation Plan - Other
Changes to Yellowstone Winter Wildlife Monitoring Program Winter Use Monitoring Summary of Findings Nov 01, 2021 Inventory and Monitoring
Programmatic Yellowstone Commercial Use Authorization Plan Commercial Use Authorization (CUA) Operating Plan Nov 23, 2021 Concessions
Yellowstone National Park Bison Management Plan EIS - - Public Scoping Notices Feb 28, 2022 Ungulate Management Plan
Buffalo Creek Native Fish Restoration Environmental Assessment Buffalo Creek Native Fish Restoration Environmental Assessment Aug 25, 2023 Resource Management
Yellowstone National Park Bison Management Plan Draft Environmental Impact Statement for Bison Management Oct 10, 2023 Ungulate Management Plan
North Entrance Road Reconstruction Project North Entrance Road Civic Engagement Mar 13, 2024 Reconstruction
Proposal to Implement Certain Restrictions for Launch of Some Types of Motorized Boats to Reduce the Risk of Aquatic Invasive Species Yellowstone Proposal to Reduce AIS Apr 05, 2024 Other Permit
Northeast Entrance Road Reconstruction Project Northeast Entrance Road Construction Project - Public Scoping Dec 03, 2024 Reconstruction
Winter Use Plan/EIS Yellowstone Final Winter Use Plan/Environmental Impact Statement Implementation Plan - Other
Old Faithful Cabin Repurposing and Dormitory Construction EA FONSI Implementation Plan - Other
2012/2013 Supplemental Winter Use Plan EIS Final Winter Use Plan/Supplemental EIS Implementation Plan - Other
Lake Cell Tower May 24 2008 Request for Concurrence Lake Cell Tower Right-of-Way Permit
Northwestern Energy Communication and Automation Plan YNP to GNF transmittal of final report and SHPO concurrence letters 03-03-14 Capital Improvement/New Construction
Remote Delivery Bison Vaccination Program Record of Decision for Remote Vaccination of Bison Other
National Ecological Observatory Network NEON Monitoring Site in Yellowstone Press Release - NEON Project Proposal Implementation Plan - Other
National Ecological Observatory Network NEON Monitoring Site in Yellowstone NEON FONSI Implementation Plan - Other
Yellowstone Bison Quarantine Plan EA FONSI Resource Management
Access Parks - Broadband Internet for Employees and Visitors Access Parks, Broadband Internet for Employees and Visitors Construction Permit
Old Faithful Visitor Education Center Finding of No Significant Impact (FONSI) for the Old Faithful Visitor Education Center Environmental Assessment Capital Improvement/New Construction
ARRA - Madison Area Wastewater Treatment Project Environmental Assessment Madison Area Wastewater Treatment Project Finding of No Significant Impact (FONSI) and ERRATA Sheet Capital Improvement/New Construction
Tower-Roosevelt Comprehensive Plan FONSI Tower-Roosevelt Comprehensive Plan Other
Lamar River Bridge FONSI 11.23.09 Repair/Rehabilitation
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 021 Implementation Plan - Other
Commercial Use Authorization Plan Commercial Use Authorization Plan Commercial Use Authorization
Lake Cell Tower Categorical Exclusion - Signed Right-of-Way Permit
Northwestern Energy Communication and Automation Plan Letter from MT SHPO to GNF 01-27-14 Capital Improvement/New Construction
Northwestern Energy Communication and Automation Plan Letter from MT SHPO to YNP 01-27-14 Capital Improvement/New Construction
Bechler Administrative Area Improvement Plan Environmental Assessment FONSI Repair/Rehabilitation
Winter Use Adaptive Management Plan N-CGSAP Annual Report 2014-2015 Other Plan
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas MOA Completion Report Implementation Plan - Other
Yellowstone National Park Bison Management Plan Record of Decision for a Bison Management Plan Ungulate Management Plan
Lake Cell Tower WY SHPO Letter (related infrastructure) Right-of-Way Permit
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 012 Implementation Plan - Other
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 022 Implementation Plan - Other
Lake Cell Tower Photo Simulation 3 Right-of-Way Permit
Northwestern Energy Communication and Automation Plan Initial Consultation WY SHPO 05-13-13 Capital Improvement/New Construction
2012/2013 Supplemental Winter Use Plan EIS Proposed Winter Use Regulation Implementation Plan - Other
Commercial Use Authorization Plan Biking Operating Plan Commercial Use Authorization
Commercial Use Authorization Plan Overnight Backcountry Trip Operating Plan Commercial Use Authorization
Parkwide Commercial Stock Outfitter Concession Contracts/EA Public Scoping Presentation Commercial Services Plan
Northwestern Energy Communication and Automation Plan WY SHPO response to the reformatted/revised report Capital Improvement/New Construction
Snake River Headwaters Comprehensive River Management Plan CRMP/EA Maps Wild and Scenic Comprehensive River Management Plan
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Corrospondence for Section 106 of NHPA Implementation Plan - Other
Yellowstone National Park Employee Housing Improvements Goal 1 Trailer Replacement Equipment Replacement
Fiber Optic Cable Installation Finding of No Significant Impact (FONSI) Implementation Plan - Other
Programmatic Yellowstone Commercial Use Authorization Plan Activity Operating Plans Concessions
Yellowstone National Park Bison Management Plan Final Environmental Impact Statement for Bison Management Ungulate Management Plan
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA Designs Presented at Public Scoping June 8, 2010 Other
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA Finding of No Significant Impact (FONSI) Other
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 041 Implementation Plan - Other
Lake Cell Tower Construction Drawings Right-of-Way Permit
Commercial Use Authorization Plan Motorized Boat Operating Plan Commercial Use Authorization
Lake Cell Tower WYSHPO Response_Concur with Alternative C Dec 10 2008 Right-of-Way Permit
Lake Cell Tower Request for Concurrence on Alternative C Sept 22 2008 MTSHPO Right-of-Way Permit
Lake Cell Tower Sept 16 2008 Notice Request for Review of EA Right-of-Way Permit
Lake Cell Tower Aug 24 2012 Request for Concurrence Data Cable Right-of-Way Permit
Lake Cell Tower Lake Cell Tower GE text Right-of-Way Permit
Lake Cell Tower Environmental Screening Form - Signed Right-of-Way Permit
Northwestern Energy Communication and Automation Plan Finding of No Significant Impact (FONSI) - Electric Transmission/Distribution System Communication Plan Capital Improvement/New Construction
Parkwide Commercial Stock Outfitter Concession Contracts/EA Parkwide Commercial Stock Outfitter Concession Contracts EA FONSI Commercial Services Plan
Lamar Buffalo Ranch Sustainable Energy Project SIGNED FONSI Implementation Plan - Other
Soda Butte Creek Native Fish Restoration Project Piscicide Related Appendices Restoration
Soda Butte Creek Native Fish Restoration Project Soda Butte Creek Restoration Project Signed CE & Comment Response Restoration
Wireless Communication Services Plan Environmental Assessment Wireless Telecommunications Committee Annual Reports Other
Reconstruct road from Fishing Bridge to Indian Pond YELL Fishing Bridge to Indian Pond Road Reconstruction FONSI and Wetland SOF Signed Implementation Plan - Other
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Public Scoping Comments Implementation Plan - Other
Yellowstone National Park Concessionaire Housing EA YELL Concessionaire Housing FONSI Signed Reconstruction
Wireless Communication Services Plan Environmental Assessment Wireless Communications Services Plan FONSI Other
Lake Area Comprehensive Plan/EA YELL Lake Area Comprehensive Plan/EA FONSI Signed 4.17.12 Other
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 025 Implementation Plan - Other
Snake River Headwaters Comprehensive River Management Plan Snake River Headwaters - Issues and Opportunities Wild and Scenic Comprehensive River Management Plan
Lake Cell Tower Photo Simulation 1 Right-of-Way Permit
Lake Cell Tower Crane Photo 3 Right-of-Way Permit
Lake Cell Tower SHPO Letter - Data Cable Right-of-Way Permit
Northwestern Energy Communication and Automation Plan Initial Consultation Letter-MT SHPO 05-13-13 Capital Improvement/New Construction
Commercial Use Authorization Plan Day Hiking Operating Plan Commercial Use Authorization
Commercial Use Authorization Plan Photography Operating Plan Commercial Use Authorization
Lake Cell Tower Proposed Lake Cell Tower Map Right-of-Way Permit
Lake Cell Tower Sept 24 2012 Request for Concurrence Equipment Building Right-of-Way Permit
Lake Cell Tower Sept 16 2008 Tribal Request for Review of EA Right-of-Way Permit
2012/2013 Supplemental Winter Use Plan EIS Record of Decision for the Winter Use Plan/Supplemental EIS Implementation Plan - Other
Isa Lake Bridge Reconstruction EA FONSI Other
Snake River Headwaters Comprehensive River Management Plan Snake River Headwaters FONSI Wild and Scenic Comprehensive River Management Plan
Northwestern Energy Communication and Automation Plan Letter from WY SHPO to YNP 12-04-13 Capital Improvement/New Construction
Remote Delivery Bison Vaccination Program Final EIS for Remote Vaccination Program to Reduce the Prevalence of Brucellosis in Yellowstone Bison Other
Soda Butte Creek Native Fish Restoration Project Map of Project Area Restoration
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Signal Propagation Maps Implementation Plan - Other
Data Recovery at the Donner Site Other
Tower-Roosevelt Comprehensive Plan Tower-Roosevelt Comprehensive Plan Other
Native Fish Conservation Plan Environmental Assessment FONSI Native Fish Conservation Plan Other
Norris-Golden Gate Road Reconstruction Project FONSI.Signed 10.21.11 Capital Improvement/New Construction
Canyon Lodging Redevelopment Project Briefing Packet Canyon Cabins MOA Implementation Plan - Other
Lake Cell Tower WYSHPO Response Preference for Alt B October 22 2008 Right-of-Way Permit
Lake Cell Tower Request for Concurrence on Alternative C Sept 22 2008 IDSHPO Right-of-Way Permit
Lake Cell Tower Response to Substantive Comments from the Public Right-of-Way Permit
North Entrance & Park Street (Gardiner, MT) Improvement Plan/EA Gardiner's Historic Resources Other
National Ecological Observatory Network NEON Monitoring Site in Yellowstone Summary of NEON proposal Implementation Plan - Other
Winter Use Adaptive Management Plan Yellowstone National Park Winter Use Adaptive Management Plan Other Plan
Yellowstone Youth Campus Plan EA Yellowstone Youth Campus FONSI Implementation Plan - Other
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas Signed Categorical Exclusion Implementation Plan - Other
Proposed Telecommunications Infrastructure at Mount Washburn & Other Park Areas List of all commercial communications equipment currently located on or near the Mount Washburn Fire Lookout Implementation Plan - Other
Yellowstone Justice Center Yellowstone Justice Center Finding of No Significant Impact (FONSI) Other
Tower-Roosevelt Comprehensive Plan News Release Other
Old Faithful Area Comprehensive Plan Summary of Public Scoping Comments Other
Lake Area Comprehensive Plan/EA Lake Area Comprehensive Plan Other
2012/2013 Supplemental Winter Use Plan EIS Winter Use Plan/Supplemental EIS Scoping Newsletter Implementation Plan - Other
Lake Cell Tower Lake Cell Tower Categorical Exclusion (CE) Right-of-Way Permit
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 011 Implementation Plan - Other
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 018 Implementation Plan - Other
Canyon Lodging Redevelopment Project Photo of Canyon Mission 66 Cabin A and C Loop Survey 047 Implementation Plan - Other
Lake Cell Tower Proposal for New Wireless Service Right-of-Way Permit
Lake Cell Tower Crane Photo 1 Right-of-Way Permit
Lake Cell Tower Wyoming SHPO Letter of Concurrence Right-of-Way Permit
Commercial Use Authorization Plan Road-based Transportation Operating Plan Commercial Use Authorization
Northwestern Energy Communication and Automation Plan YNP Letter to MT & WY SHPOs - EA Release 11-07-13 Capital Improvement/New Construction
Northwestern Energy Communication and Automation Plan Letter from YNP to WYSHPO 01-08-14 Capital Improvement/New Construction
Northwestern Energy Communication and Automation Plan YNP electronic submittal of reformatted report to WY SHPO 02-20-14 Capital Improvement/New Construction
2012/2013 Supplemental Winter Use Plan EIS Winter Use Final Rule Implementation Plan - Other
Update and Repair Canyon Rim Overlooks and Trails Appendix C- Schematic Design - Canyon Rim Overlooks and Trails Rehabilitation Implementation Plan - Other
Reconstruct road from Fishing Bridge to Indian Pond Public Scoping for Fishing Bridge to Indian Pond Road Segment Implementation Plan - Other
Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed FONSI for Restoration of Westslope Cutthroat Trout in the East Fork Specimen Creek Watershed Restoration
Canyon Rim Drives 3R Road Project Finding of No Significant Impact (FONSI) Capital Improvement/New Construction
Interim Winter Use Plan 2009 2009 Winter Use Plan Finding of No Significant Impact Other
Winter Use Plan/EIS Scientific Assessment of Yellowstone National Park Winter Use Implementation Plan - Other
Canyon Lodging Redevelopment Project Canyon Cabin Removal Map Implementation Plan - Other
Lake Cell Tower Signal Propagation Map Right-of-Way Permit
Lake Cell Tower Photo Simulation 2 Right-of-Way Permit
Lake Cell Tower Crane Photo 2 Right-of-Way Permit
2012/2013 Supplemental Winter Use Plan EIS Public Meeting Presentation for the Draft Winter Use Plan/Supplemental EIS Implementation Plan - Other
Northwestern Energy Communication and Automation Plan Initial Consultation Letter-ACHP 05-12-2013 Capital Improvement/New Construction
Wildland Fire Management Plan Wildland Fire Management Plan FONSI_Signed 022513 Fire Management Plan
Commercial Use Authorization Plan Fishing Operating Plan Commercial Use Authorization
Commercial Use Authorization Plan Non-motorized Boating Operating Plan Commercial Use Authorization
Lake Cell Tower July 26 2006 Tribal and Public Notice Mailing Right-of-Way Permit
Lake Cell Tower WYSHPO Response Mt Washburn Design Standards Right-of-Way Permit
Lake Cell Tower Sept 19 2008 Request for Concurrence WYSHPO Right-of-Way Permit
Invasive Vegetation Management Plan/Environmental Assessment Yellowstone Invasive Vegetation Mangement Plan/EA Finding of No Signfiicant Impact Invasive Species Management Plan
Northwestern Energy Communication and Automation Plan Letter from MT SHPO to YNP 01-17-14 Capital Improvement/New Construction
Northwestern Energy Communication and Automation Plan ACHP letter to YNP 02-20-14 Capital Improvement/New Construction
National Ecological Observatory Network NEON Monitoring Site in Yellowstone Presentation of NEON Proposal Implementation Plan - Other
Update and Repair Canyon Rim Overlooks and Trails Finding of No Significant Impact (FONSI) - Signed Copy Implementation Plan - Other
Bridge Replacement - Bighorn Pass Trail Bighorn Pass Trail Bridge - Map Reconstruction
Lewis River Bridge Replacement Finding of No Significant Impact (FONSI) Reconstruction
Yellowstone National Park Concessionaire Housing EA Area(s) of Potential Effect Reconstruction
Replace the Yellowstone River Bridge YELL Yellowstone River Bridge Replacement FONSI Signed Reconstruction
* Open for comment.