PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Road Closure CE


This is the unsigned Categorical Exclusion (CE) that would ammend the Isa Lake Bridge Reconstruction Environmental Assessment to allow a road closure during a portion of the construction period. The change would result in reduced impacts from not constructing a temporary bridge north of the existing bridge, a shortened time schedule, and reduced cost.
 
Comment Period: Closed        Aug 30, 2013 - Oct 1, 2013
Document Content:
Road Closure CE   (23.6 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.