Isa Lake Bridge Reconstruction Environmental Assessment


An environmental assessment that was prepared to analyze the impacts associated with a proposed project to reconstruct the Isa Lake Bridge located on Craig Pass within Yellowstone National Park.
 
Comment Period: Closed        Mar 14, 2013 - Apr 14, 2013
Document Content:
Isa Lake Bridge Reconstruction EA   (761.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.