Fire Management Plan |
Olympic National Park Fire Management Plan Revised Environmental Assessment |
May 16, 2003 |
Fire Management Plan |
Enchanted Valley Chalet Preservation Maintenance |
News Release for Enchanted Valley Chalet Scoping |
Jul 02, 2004 |
Other Maintenance Activities |
Rehabilitate Hurricane Ridge Road Project |
Rehabilitation of Hurricane Ridge Road Environmental Assessment |
Nov 05, 2004 |
Other |
Rehabilitate Hurricane Ridge Road Project |
News Release: Rehabilitation of Hurricane Ridge Road EA |
Nov 05, 2004 |
Other |
Enchanted Valley Chalet Preservation Maintenance |
News Release: Feb. 4, 2005, Second Scoping Period for Future of Enchanted Valley Chalet |
Mar 10, 2005 |
Other Maintenance Activities |
San Juan Island NHP Fire Management Plan and Environmental Assessment |
San Juan Island National Historical Park Fire Management Plan Environmental Assessment – 2005 |
Apr 01, 2005 |
Fire Management Plan |
Plant Propagation Facility |
Olympic National Park Plant Propagation Facility EA |
Apr 25, 2005 |
Other |
Finley Creek, Olympic National Park |
Maintaining Finley Creek Road Access Through Continued Removal of Gravel |
Aug 19, 2005 |
Resource Management Plan |
Fisher Reintroduction Plan/Environmental Assessment |
News Release on Public Scoping for Fisher |
Feb 10, 2006 |
Other |
Olympic National Park General Management Plan |
OLYM Draft GMP/EIS |
Sep 30, 2006 |
General Management Plan |
Olympic National Park General Management Plan |
OLYM Draft GMP/EIS, Chapter 2 - Alternatives Descriptions and Maps for Park |
Sep 30, 2006 |
General Management Plan |
Restore Interim Access to the Queets Area |
Environmental Assessment to Restore Interim Access to Queets Road |
Jan 31, 2007 |
Other |
Repairs to Hoh River Road - West Twin Creek Crossing |
West Twin Creek Crossing |
Mar 26, 2007 |
Other |
Repairs to Hoh River Road - West Twin Creek Crossing |
Environmental Assessment for the Upper Hoh Road, West Twin Creek Bridge |
Jun 13, 2007 |
Other |
Proposed Changes to Fees at Olympic National Park |
Olympic National Park Fee Increase Proposal |
Sep 30, 2007 |
Other |
Fisher Reintroduction Plan/Environmental Assessment |
Fisher Reintroduction Plan and Environmental Assessment |
Oct 10, 2007 |
Other |
Install Upper Elwha SNOTEL Site |
Environmental Assessment - Upper Elwha Snow Telemetry Project |
Oct 11, 2007 |
Research Permit |
Quinault South Shore and Graves Creek Road Rehabilitation |
Press Release for Public Scoping on Graves Creek and South Shore Road Project |
Mar 05, 2008 |
Repair/Rehabilitation |
NW Avalanche Center Weather Station Relocation |
Public Invited to Provide Input on Proposed Improvements to Hurricane Ridge Weather Station |
Sep 10, 2008 |
Other |
Quinault South Shore and Graves Creek Road Rehabilitation |
Graves Creek and South Shore Road Rehabilitation Environmental Assessment |
Oct 15, 2008 |
Repair/Rehabilitation |
Road Use Permit for Timber Management Activities - DNR and Merrill & Ring |
Scoping Press Release and Map |
Nov 10, 2008 |
Special Use Permit |
NW Avalanche Center Weather Station Relocation |
Environmental Assessment for the Proposed Relocation and Improvements to the Hurricane Ridge Weather Station |
Feb 09, 2009 |
Other |
Boulder Creek Trail and Campground Rehabilitation |
Press Release for Boulder Creek Trail and Campground Rehabilitation Project Scoping |
Mar 06, 2009 |
Repair/Rehabilitation |
Changes to Fishing Regulations |
Press Release for Proposed Fishing Regulations |
Mar 11, 2009 |
Other |
Replacement of Griff Creek Barrier Culvert |
News Release for Griff Creek Culvert Replacement Project |
Apr 01, 2009 |
Other |
Nippon Water Quality Improvements |
Nippon Water Quality Improvements, Restore Elwha River Ecosystems and Fisheries |
Jun 29, 2009 |
Other |
Boulder Creek Trail and Campground Rehabilitation |
Rehabilitate Boulder Creek Trail and Campground EA |
Jan 06, 2010 |
Repair/Rehabilitation |
Stormwater Separation to Mitigate Lower Elwha Flows to City of Port Angeles |
Stormwater Separation Environmental Assessment |
Nov 10, 2010 |
Capital Improvement/New Construction |
Kalaloch Firing Range Engineering Evaluation / Cost Analysis (EE/CA) |
Kalaloch Firing Range Engineering Assessment / Cost Analysis |
Apr 15, 2012 |
Other Maintenance Activities |
2012 Spruce Railroad Trail EA |
2012 Spruce Railroad Trail EA - open for public comment through June 8, 2012 |
Jun 08, 2012 |
Implementation Plan - Other |
Olympic National Park Wilderness Stewardship Plan |
OLYM Wilderness Stewardship Plan - Newsletter #1 - Scoping |
Apr 23, 2013 |
Wilderness Plan |
ONP Fishing Regulations Update |
Proposed Annual Fishing Regulations for Pacific Coastal Areas of Olympic National Park, 2014-15 |
Mar 24, 2014 |
Other |
Olympic National Park Wilderness Stewardship Plan |
Preliminary Draft Alternatives - ONP Wilderness Stewardship Plan |
May 17, 2014 |
Wilderness Plan |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River - Environmental Assessment |
Jun 05, 2014 |
Other Natural/Cultural Resource Activities |
Log Cabin Resort Replacement Structures and Accessibility |
Log Cabin Resort Proposed Improvements |
Jun 09, 2014 |
Repair/Rehabilitation |
Mountain Goat Management Plan/EIS |
Notice of Intent to Prepare an Environmental Impact Statement (July 21, 2014) |
Sep 19, 2014 |
Ungulate Management Plan |
Olympic National Park Proposed Recreation Fee Increases |
Olympic National Park Proposed Recreation Fee Increases |
Dec 31, 2014 |
Fee Collection |
U.S. Highway 101 Lake Crescent & East Beach Road Rehabilitation/EA |
U.S. Highway 101 Rehabilitation at Lake Crescent - Preliminary Alternative Concepts |
Jul 07, 2015 |
Repair/Rehabilitation |
Log Cabin Resort Replacement Structures and Accessibility |
Log Cabin Resort Cabin Replacement |
Mar 09, 2016 |
Repair/Rehabilitation |
U.S. Highway 101 Lake Crescent & East Beach Road Rehabilitation/EA |
U.S. Highway 101 Lake Crescent and East Beach Rehabilitation DRAFT Environmental Assessment |
Apr 30, 2016 |
Repair/Rehabilitation |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
Final Disposition of the Enchanted Valley Chalet EA/Public Scoping |
Aug 31, 2016 |
Resource Management |
Mountain Goat Management Plan/EIS |
Olympic National Park Mountain Goat Management Plan/Draft EIS |
Oct 10, 2017 |
Ungulate Management Plan |
Fire Management Plan 2018 |
ONP Fire Management Plan Scoping Newsletter |
Mar 02, 2018 |
Fire Management Plan |
Temporary Off-road Access for Geotechnical Investigation/EA |
Olympic Hot Springs Road Geotechnical Investigation Public Scoping Newsletter |
Apr 01, 2018 |
Reconnaissance Survey |
Temporary Off-road Access for Geotechnical Investigation/EA |
Temporary Off-road Access for Geotechnical Investigation/EA |
Aug 31, 2018 |
Reconnaissance Survey |
Olympic Hot Springs Road Access/Environmental Assessment |
Olympic Hot Springs Road Long-Term Access Civic Engagement (2018) |
Mar 13, 2019 |
Repair/Rehabilitation |
Fire Management Plan 2018 |
Olympic National Park Updated Fire Management Plan/EA |
Apr 24, 2019 |
Fire Management Plan |
Olympic Hot Springs Road Access/Environmental Assessment |
Olympic Hot Springs Road Long-Term Access Environmental Assessment (2019) |
Dec 18, 2019 |
Repair/Rehabilitation |
Frontcountry Campground Fee Rate Changes |
Campground Fee Comparability Review |
Mar 03, 2020 |
Fee Collection |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
Aug 31, 2020 |
Resource Management |
Quillayute River Restoration - Reach 3 |
Quileute Tribe's Quillayute River Restoration - Reach 3/Environmental Assessment |
Aug 22, 2021 |
Restoration |
Air Tour Management Plan - Olympic National Park |
Draft Olympic National Park Air Tour Management Plan |
Aug 28, 2021 |
Air Tour Management Plan |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
Enchanted Valley Chalet NHPA Section 106 Consultation |
Dec 31, 2021 |
Resource Management |
US 101 Elwha River Bridge Replacement (WSDOT Lead) |
WSDOT US 101 Elwha River Bridge Replacement - FONSI |
Jan 06, 2022 |
Other Permit |
Quillayute River Restoration - Reach 3 |
Quileute Tribe Quillayute River Restoration Reach 3 FONSI |
Mar 01, 2022 |
Restoration |
Cape Alava and Sand Point Wilderness Trails Rehabilitation |
Cape Alava and Sand Point Wilderness Trails Rehabilitation Civic Engagement |
Apr 26, 2022 |
Repair/Rehabilitation |
US 101 Elwha Bridge Replacement Downstream Mitigation |
US 101 Elwha Bridge Replacement Downstream Mitigation EA |
Nov 22, 2023 |
Implementation Plan - Other |
Accessibility Self-Evaluation and Transition Plan |
Accessibility Self-Evaluation and Transition Plan (SETP) |
Aug 31, 2024 |
Other Plan |
East Fork Quinault River Trail and Enchanted Valley Overcrowding |
East Fork Quinault Trail and Enchanted Valley Overcrowding |
Nov 15, 2024 * |
Predominant Use Change |
Fire Management Plan |
Appendices A-F and H for the Environmental Assessment for the Olympic National Park Fire Management Plan |
|
Fire Management Plan |
San Juan Island NHP Fire Management Plan and Environmental Assessment |
Finding of No Significant Impact (FONSI) for Fire Management Plan Environmental Assessment |
|
Fire Management Plan |
Restore Interim Access to the Queets Area |
News Release for Public Review of EA |
|
Other |
Rehabilitate Hurricane Ridge Road Project |
Hurricane Ridge Road - Finding of No Significant Impact |
|
Other |
Olympic National Park General Management Plan |
DGMP Comments Part B |
|
General Management Plan |
Changes to Fishing Regulations |
Proposed Changes to Fishing Regulations |
|
Other |
2012 Spruce Railroad Trail EA |
2011 Spruce Railroad Trail Expansion and Improvments EA Materials |
|
Implementation Plan - Other |
Olympic National Park Wilderness Stewardship Plan |
222 Acre Wilderness Removal Legislation |
|
Wilderness Plan |
Adoption of National Marine Fisheries Service's EA for the Elwha River Hatchery and Genetic Management Plans |
Adoption FONSI by NPS |
|
Resource Management Plan |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
EVC Memorandum of Agreement - Signed |
|
Other Natural/Cultural Resource Activities |
Mountain Goat Management Plan/EIS |
Banners for Public DEIS Meetings - August 2017 |
|
Ungulate Management Plan |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
2014 Memorandum of Agreement |
|
Resource Management |
Mountain Goat Management Plan/EIS |
News Release: Final Mountain Goat Management Plan for ONP Released |
|
Ungulate Management Plan |
Olympic Hot Springs Road Access/Environmental Assessment |
Civic Engagement Presentation (2018) |
|
Repair/Rehabilitation |
Air Tour Management Plan - Olympic National Park |
Olympic National Park Draft ATMP Public Meeting PowerPoint Aug 2021 |
|
Air Tour Management Plan |
US 101 Elwha Bridge Replacement Downstream Mitigation |
US 101 Elwha River Bridge Relocation Downstream Mitigation FONSI |
|
Implementation Plan - Other |
Accessibility Self-Evaluation and Transition Plan |
Implementation Strategy Table |
|
Other Plan |
Hoh Wastewater System Replacement |
|
|
Repair/Rehabilitation |
Olympic National Park General Management Plan |
DGMP Comments Part C |
|
General Management Plan |
Fisher Reintroduction Plan/Environmental Assessment |
Fisher Question and Answer Handout |
|
Other |
Olympic National Park General Management Plan |
Federal Register Notice of Record of Decision |
|
General Management Plan |
Olympic National Park General Management Plan |
Olympic National Park, General Management Plan Summary Presentation |
|
General Management Plan |
Whale Trail Wayside Exhibit #2 |
Whale Trail Exhibit #2 - Proposal and Information |
|
Other |
Mountain Goat Management Plan/EIS |
Public Scoping Report - Mountain Goat Management Plan (Jan. 29, 2015) |
|
Ungulate Management Plan |
U.S. Highway 101 Lake Crescent & East Beach Road Rehabilitation/EA |
U.S. Hwy 101 Lake Crescent & E. Beach Rd. Rehab/EA FONSI |
|
Repair/Rehabilitation |
Verizon Wireless at Hurricane Ridge |
Verizon SF299 - OLYM-Hurricane Ridge |
|
Right-of-Way Permit |
Temporary Off-road Access for Geotechnical Investigation/EA |
Description of Typical Geotechnical Drilling Operations |
|
Reconnaissance Survey |
Olympic Hot Springs Road Access/Environmental Assessment |
Plan View - All Engineering Solutions (2018) |
|
Repair/Rehabilitation |
Finley Creek, Olympic National Park |
Finding of No Significant Impact Statement |
|
Resource Management Plan |
Boulder Creek Trail and Campground Rehabilitation |
Boulder Creek Finding of No Significant Impact (FONSI) |
|
Repair/Rehabilitation |
2012 Spruce Railroad Trail EA |
2012 SRRT EA Plan View and Cross Section Drawings of Switchbacks Proposed for SRRT |
|
Implementation Plan - Other |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
2014 Concise EA and Related Decision Documents |
|
Resource Management |
Fire Management Plan 2018 |
Public Meeting Materials |
|
Fire Management Plan |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
Enchanted Valley Chalet NRHP Listing |
|
Resource Management |
Air Tour Management Plan - Olympic National Park |
Final ATMP Package |
|
Air Tour Management Plan |
Whale Trail Wayside Exhibit Installation |
|
|
Other |
Fire Management Plan |
Appendix G - Maps for the Environmental Assessment for the Olympic National Park Fire Management Plan |
|
Fire Management Plan |
Fire Management Plan |
Finding of No Significant Impact - Olympic National Park Fire Management Plan |
|
Fire Management Plan |
San Juan Island NHP Fire Management Plan and Environmental Assessment |
Errata Sheets to Accompany Fire Management Plan Environmental Assessment |
|
Fire Management Plan |
Olympic National Park General Management Plan |
Final GMP/EIS Volume 2 |
|
General Management Plan |
Install Upper Elwha SNOTEL Site |
Finding of No Significant Impact Statement |
|
Research Permit |
2012 Spruce Railroad Trail EA |
2012 Spruce Railroad Trail/EA - Finding of No Significant Impact (FONSI) |
|
Implementation Plan - Other |
Olympic National Park Wilderness Stewardship Plan |
Notice of Intent To Prepare an Environmental Impact Statement for the Wilderness Stewardship Plan |
|
Wilderness Plan |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
2016 MOA Letter to SHPO and Annual Reports |
|
Other Natural/Cultural Resource Activities |
Mountain Goat Management Plan/EIS |
Draft Mtn Goat Mgmt Plan Public Meeting Presentation |
|
Ungulate Management Plan |
Temporary Off-road Access for Geotechnical Investigation/EA |
Proposed Geotech Locations for Olympic Hot Springs Road |
|
Reconnaissance Survey |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
FINAL Historic American Buildings Survey (HABS) Report 2017 |
|
Resource Management |
Fire Management Plan 2018 |
OLYM FMP/EA FONSI (Decision Document) |
|
Fire Management Plan |
Install Electrical Cable in Conduit on Hurricane Ridge Road to Preserve Visitor Services |
|
|
Other Maintenance Activities |
Olympic National Park General Management Plan |
Olympic National Park GMP Newsletter #3 - May 2003 |
|
General Management Plan |
Olympic National Park General Management Plan |
DGMP Comments |
|
General Management Plan |
Olympic National Park General Management Plan |
Final GMP Volume 1 |
|
General Management Plan |
Nippon Water Quality Improvements |
Signed FONSI with Errata and Response to Comments (12-18-2009) |
|
Other |
Olympic National Park Wilderness Stewardship Plan |
Public Scoping Meeting Materials |
|
Wilderness Plan |
Olympic National Park Wilderness Stewardship Plan |
Keeping It Wild: An Interagency Strategy to Monitor Trends in Wilderness Character |
|
Wilderness Plan |
Temporary Off-road Access for Geotechnical Investigation/EA |
Temporary Off-road Access for Geotechnical Investigation/EA FONSI |
|
Reconnaissance Survey |
US 101 Elwha Bridge Replacement Downstream Mitigation |
US 101 Elwha River Bridge Relocation EA Documents (FOR REFERENCE ONLY) |
|
Implementation Plan - Other |
Plant Propagation Facility |
Finding of No Significant Impact - Plant Propagation Facility |
|
Other |
Fisher Reintroduction Plan/Environmental Assessment |
Fisher Reintroduction Plan and Environmental Assessment Internal Scoping Report |
|
Other |
Fire Management Plan |
News Release for the Finding of No Significant Impact |
|
Fire Management Plan |
Restore Interim Access to the Queets Area |
Finding of No Significant Impact Statement |
|
Other |
Repairs to Hoh River Road - West Twin Creek Crossing |
Final Decision Documents for the West Twin Creek Bridge Project |
|
Other |
Olympic National Park General Management Plan |
Final GMP News Release |
|
General Management Plan |
Olympic National Park General Management Plan |
Record of Decision for Final GMP/EIS |
|
General Management Plan |
Quinault South Shore and Graves Creek Road Rehabilitation |
Finding of No Significant Impact Statement for the Rehabilitation of Graves Creek and South Shore Roads |
|
Repair/Rehabilitation |
Olympic National Park Wilderness Stewardship Plan |
Olympic National Park Wilderness Designation Legislation |
|
Wilderness Plan |
Olympic National Park Wilderness Stewardship Plan |
Olympic National Park Wilderness Stewardship Plan - Public Scoping Comment Report |
|
Wilderness Plan |
Mountain Goat Management Plan/EIS |
News Release: Olympic NP Invites Public Participation in Development of Mountain Goat Management Plan (July 21, 2014) |
|
Ungulate Management Plan |
Mountain Goat Management Plan/EIS |
Public Scoping Meeting Posters (August 2014) |
|
Ungulate Management Plan |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
NPS DO-12 Policy Waiver for Emergency Response - Enchanted Valley Chalet EA |
|
Other Natural/Cultural Resource Activities |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
Public Scoping Meeting Posters |
|
Resource Management |
Replace Roofing Parkwide |
|
|
Other Maintenance Activities |
Olympic National Park General Management Plan |
Olympic National Park GMP Newsletter #4 - Fall 2004 |
|
General Management Plan |
Olympic National Park General Management Plan |
Olympic National Park GMP Newsletter #2 - January 2002 |
|
General Management Plan |
Olympic National Park General Management Plan |
OLYM Draft GMP/EIS, Supplemental Information |
|
General Management Plan |
Fire Management Plan |
Errata Sheet for EA |
|
Fire Management Plan |
Restore Interim Access to the Queets Area |
Update Queets Access Map and Handout |
|
Other |
Stormwater Separation to Mitigate Lower Elwha Flows to City of Port Angeles |
Signed Finding of No Significant Impact (3-11-2011) |
|
Capital Improvement/New Construction |
2012 Spruce Railroad Trail EA |
2012 Spruce Railroad Trail/EA Public Comments (from the May 9-June 8, 2012 open comment period) |
|
Implementation Plan - Other |
Olympic National Park Wilderness Stewardship Plan |
The Wilderness Act of 1964 |
|
Wilderness Plan |
Adoption of National Marine Fisheries Service's EA for the Elwha River Hatchery and Genetic Management Plans |
Elwha River Hatchery and Genetic Management Plan/Environmental Assessment |
|
Resource Management Plan |
Temporary Relocation of the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
Final EA and FONSI for the Emergency Action to Temporarily Relocate the Enchanted Valley Chalet for the Protection of the East Fork Quinault River |
|
Other Natural/Cultural Resource Activities |
Olympic National Park General Management Plan |
Olympic National Park GMP Newsletter #1 - Summer 2001 |
|
General Management Plan |
Fisher Reintroduction Plan/Environmental Assessment |
Finding of No Significant Impact Statement and Errata |
|
Other |
NW Avalanche Center Weather Station Relocation |
Finding of No Significant Impact for Hurricane Ridge Weather Station |
|
Other |
Minor boundary revision in the Umbrella Creek area of Olympic National Park |
Public Comments Regarding Minor Boundary Adjustment |
|
General Management Plan |
Adoption of National Marine Fisheries Service's EA for the Elwha River Hatchery and Genetic Management Plans |
NMFS Decision Memo |
|
Resource Management Plan |
Adoption of National Marine Fisheries Service's EA for the Elwha River Hatchery and Genetic Management Plans |
Appendix A of NMFS EA |
|
Resource Management Plan |
Adoption of National Marine Fisheries Service's EA for the Elwha River Hatchery and Genetic Management Plans |
NMFS Elwha Hatchery and Genetic Management Plan - Biological Opinion |
|
Resource Management Plan |
Mountain Goat Management Plan/EIS |
Scoping Newsletter: Olympic National Park Mountain Goat Mgt. Plan (July 21, 2014) |
|
Ungulate Management Plan |
Olympic National Park Wilderness Stewardship Plan |
Public Comment Report for the Preliminary Draft Alternatives |
|
Wilderness Plan |
The Final Disposition of the Enchanted Valley Chalet/Environmental Assessment |
EVC EA Public Scoping Comment Summary Report - 2016 |
|
Resource Management |
U.S. Highway 101 Lake Crescent & East Beach Road Rehabilitation/EA |
USFWS Biological Opinion |
|
Repair/Rehabilitation |
Mountain Goat Management Plan/EIS |
ONP Mountain Goat Management Plan/FEIS FAQs |
|
Ungulate Management Plan |
Mountain Goat Management Plan/EIS |
Record of Decision (NPS only) Documentation |
|
Ungulate Management Plan |
Mountain Goat Management Plan/EIS |
Olympic National Park Mountain Goat Management Plan Final EIS |
|
Ungulate Management Plan |
Temporary Off-road Access for Geotechnical Investigation/EA |
Public Presentation from 5.15.18 |
|
Reconnaissance Survey |
Rehabilitate Five Park Road Bridges |
|
|
Repair/Rehabilitation |