WSDOT US 101 Elwha River Bridge Replacement - FONSI


This is the decision document ("Finding of No Significant Impact" or "FONSI") for the WSDOT US 101 Elwha River Bridge Replacement Environmental Assessment.
 
Comment Period: Closed        Dec 6, 2021 - Jan 6, 2022
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.