Project Links
Olympic National Park » Quinault South Shore and Graves Creek Road Rehabilitation » Document List » Document Contents
Graves Creek and South Shore Road Rehabilitation Environmental Assessment
The Graves Creek and South Shore Road Rehabilitation Environmental Assessment (EA) was released on September 12, 2008 for public review and comment. The EA was prepared by the National Park Service (NPS) in cooperation with the Federal Highway Administration (FHWA). The review period ended October 15, 2008. Currently comments are being evaluated and the NPS will be preparing a decision document.
Comment Period:
Closed
Sep 12, 2008 - Oct 15, 2008
|
Document Content: |
Appendix B - Floodplain Statement of Findings
(55.8 KB, PDF file)
Appendix C - Federal and State Listed Species List
(33.2 KB, PDF file)
Appendix A - Biological Assessment
(4.3 MB, PDF file)
Graves Creek and South Shore Road EA
(3.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |