Press Release for Public Scoping on Graves Creek and South Shore Road Project


This document includes information on public scoping for the Graves Creek and South Shore Road project and additional information on park road status within Olympic National Park.

The park is developing alternatives to permanently repair the damaged roadway to provide more sustainable access along the South Shore Road and Graves Creek Road. Options include the design and placement of engineered log jams along portions of the roadway to better protect the road while protecting and improving habitat for fish.

The public is asked to provide comments to help develop the alternatives, which will be presented in an environmental assessment to be released later this year. Comments will be accepted now through March 5, 2008 during the 30-day scoping period.
 
Comment Period: Closed        Jan 31, 2008 - Mar 5, 2008
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.