The Hoh wastewater system is undersized for current visitation of the area. The project is proposed to be conducted in three phases:
1) Soil testing of potential drain field sites followed by pre-design of system modifications and cost estimates.
2) Emergency measures: construct additional drain field and complete sufficient system modifications to eliminate introduction of solids to drain fields.
3) Complete remaining system modifications not accomplished in Phase 2.