New Sewer Line Great Falls Maintenance Facility |
New Sewer Line Great Falls Maintenance Facility Project documents |
Apr 06, 2006 |
Repair/Rehabilitation |
Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse Draft Environmental Assessment |
Jun 15, 2006 |
Other |
Mulberry Tree Removal at the Georgetown Visitor Center |
Mulberry Tree Removal at the Georgetown Visitor Center |
Aug 14, 2006 |
Other Maintenance Activities |
New Design Raw Water Main and McKinney Treated Effluent Outfall |
Draft Environmental Assessment, November 2006 |
Nov 30, 2006 |
Capital Improvement/New Construction |
Catoctin Aqueduct |
Proposed Restoration of the Catoctin Aqueduct |
Nov 30, 2006 |
Other |
Historic Dams 4&5 Eelway Passage Project - Potomac River |
Eelways - Historic Dams #4&5, Public Scoping Information |
Feb 10, 2007 |
Other |
Retaining Wall, 11900 River Road, Potomac, MD |
Public Scoping Information |
Nov 30, 2007 |
Other Maintenance Activities |
Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse/Land Transfer Notice of Intent/EIS |
Jan 18, 2008 |
Other |
Catoctin Aqueduct |
Catoctin Aqueduct Restoration Draft Environmental Assessment |
Apr 14, 2008 |
Other |
Historic Dams 4&5 Eelway Passage Project - Potomac River |
Proposed Eel Ladder Construction at Dams 4 and 5 on the Potomac River, Environmental Assessment / Assessment of Effects, November 2009 |
Jan 08, 2010 |
Other |
Washington County - Sharpsburg Water Intake Upgrades |
Washington County - Sharpsburg Water Intake Upgrades Public Scoping Document |
Mar 09, 2010 |
Other |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH EIS ROW permit scoping newsletter |
Aug 20, 2010 |
Right-of-Way Permit |
Summit Hall Turf Farm Water Access Project |
Summit Hall Turf Farm Water Access Project Public Scoping Information |
Aug 20, 2010 |
Other |
Summit Hall Turf Farm Water Access Project |
Summit Hall Turf Farm Water Access, Poolesville, Maryland, Environmental Assessment/Assessment of Effect July 2011 |
Aug 12, 2011 |
Other |
Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Public Scoping Newsletter |
Mar 13, 2012 |
Special Resource Study/New Area Study |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Newsletter #1 - Feasibility Study for non-motorized boathouse zone |
Mar 30, 2012 |
Feasibility Study |
Washington County - Sharpsburg Water Intake Upgrades |
Sharpsburg Water Intake Upgrade Environmental Assessment/Assessment of Effect, March 2012 |
Apr 19, 2012 |
Other |
Canal Place Heritage Area Management Plan Update and Chesapeake and Ohio Canal NHP Cumberland Boatyard and Rewatering EA |
Canal Place Heritage Area Management Plan Update - Public Scoping |
May 18, 2012 |
Capital Improvement/New Construction |
Canal Place Heritage Area Management Plan Update and Chesapeake and Ohio Canal NHP Cumberland Boatyard and Rewatering EA |
Cumberland Boatyard and Rewatering EA - Public Scoping |
May 18, 2012 |
Capital Improvement/New Construction |
Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Press Release |
Apr 21, 2013 |
Other Maintenance Activities |
Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Newsletter |
Apr 21, 2013 |
Other Maintenance Activities |
Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Maps |
Apr 21, 2013 |
Other Maintenance Activities |
Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Scoping for the Proposed Offshore Submerged Channel Intake |
Aug 18, 2013 |
Other |
Potomac River Tunnel |
Potomac River Tunnel Project Scoping Comment Form |
Sep 02, 2014 |
Other |
Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Shepherdstown Battlefield Special Resource Study/Boundary Study/Environmental Assessment |
Oct 03, 2014 |
Special Resource Study/New Area Study |
Enhancing Visitor Experience at Hancock, MD, Mile 122.12-124.59 |
Restoration of Canal Operations at Hancock MP 122.12 to 124.59 |
Oct 10, 2014 |
Repair/Rehabilitation |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal Invites Feedback on Proposal to Increase and Expand Entrance and Other Fees Park-wide |
Feb 22, 2015 |
Fee Collection |
Potomac River Tunnel |
Potomac River Tunnel Section 106 |
Mar 06, 2015 |
Other |
C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
Public Scoping Newsletter |
Mar 20, 2015 |
Ungulate Management Plan |
Georgetown Nonmotorized Boathouse Zone Development Plan |
Preliminary Alternatives Newsletter |
Apr 10, 2015 |
Implementation Plan - Other |
Nationwide Multi-Unit Fire Management Plan / Environmental Assessment |
Nationwide Multi-Unit Fire Management Plan / Environmental Assessment |
Apr 18, 2016 |
Fire Management Plan |
Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Potomac Submerged Channel Intake Environmental Assessment and Assessment of Effect, July 2016 |
Sep 14, 2016 |
Other |
Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan EA scoping |
Sep 16, 2016 |
Other Plan |
Georgetown Nonmotorized Boathouse Zone Development Plan |
Georgetown Nonmotorized Boathouse Zone Development Plan and Environmental Assessment |
Sep 30, 2016 |
Implementation Plan - Other |
Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan/EA for four parks within the NCR |
May 12, 2017 |
Other Plan |
C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
White-tailed Deer Management Plan and Environmmental Assessment |
May 16, 2017 |
Ungulate Management Plan |
C&O Canal National Historical Park - Georgetown Canal Plan |
November 2, 2017 Public meeting - Initial Design Concepts for the C&O Canal in Georgetown |
Jan 05, 2018 |
Development Concept Plan/Site Plan |
Potomac River Tunnel |
Potomac River Tunnel EA |
Dec 04, 2018 |
Other |
Reconstruct/Stabilize Historic Stone Wall & Towpath McMahon's Mill to Lock 42 |
Reconstruct/Stabilize The Historic Stone Wall and Towpath from McMahon's Mill to Lock 42 Environmental Assessment |
Feb 20, 2019 |
Repair/Rehabilitation |
C&O Canal NHP Park Headquarters Relocation |
Public Comment on Conceptual Plans |
Apr 24, 2019 |
Other Plan |
C&O Canal National Historical Park - Georgetown Canal Plan |
April 4, 2019 - Refined Design Concepts for the C&O Canal in Georgetown; Public Comment Period Now Open |
May 11, 2019 |
Development Concept Plan/Site Plan |
Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Scoping Boards |
May 29, 2019 |
Capital Improvement/New Construction |
C&O Canal NHP Park Headquarters Relocation |
Environmental Assessment |
Sep 09, 2019 |
Other Plan |
C&O Canal National Historical Park - Georgetown Canal Plan |
Georgetown Canal Plan Environmental Assessment |
Nov 16, 2019 |
Development Concept Plan/Site Plan |
Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Transportation Upgrades Environmental Assessment |
Dec 13, 2019 |
Capital Improvement/New Construction |
Improve Visitor Safety and Mitigate Rockfall Hazards in the Paw Paw Tunnel Hollow |
Environmental Assessment |
Jul 25, 2020 |
Other Maintenance Activities |
City of Cumberland Mill Race CSO |
Environmental Assessment and Wetland Statement of Findings |
Oct 31, 2020 |
Capital Improvement/New Construction |
Repair of the Potomac Interceptor sewage system - LZ09 and LZ03 |
Project Information |
Jul 03, 2022 |
Special Use Permit |
White's Ferry Development Concept Plan |
Public Scoping for White's Ferry Plan |
Nov 12, 2022 |
Development Concept Plan/Site Plan |
Great Falls (MD) Development Concept Plan |
Comment Period #1 - Great Falls DCP Issues and Opportunities |
Sep 29, 2023 |
Development Concept Plan/Site Plan |
Motion Picture Filming - Permit Request |
Section 404 Permit |
|
Other |
New Design Raw Water Main and McKinney Treated Effluent Outfall |
Finding of No Significant Impact, New Design Raw Water Main and Treated Effluent Outfall, Chesapeake and Ohio Canal National Historical Park, August 2007 |
|
Capital Improvement/New Construction |
Catoctin Aqueduct |
Catoctin Aqueduct Restoration Finding of No Significant Impact |
|
Other |
Historic Dams 4&5 Eelway Passage Project - Potomac River |
Public Scoping Comments Regarding Proposed Eelway Passage Project at historic Dams 4 and 5 on the Potomac River |
|
Other |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Notice of Intent (NOI) to prepare the EIS |
|
Right-of-Way Permit |
Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Battle History Presentation |
|
Special Resource Study/New Area Study |
Emergency Rock Fall Mitigation at the Chesapeake & Ohio Canal (Paw Paw) |
FINDING OF NO SIGNIFICANT IMPACT ROCK FALL MITIGATION Oldtown, Maryland |
|
Emergency Repair |
Redesign Entrance and Intersection at Fletcher's Cove |
Section 106 Meeting #2 Presentation |
|
Capital Improvement/New Construction |
Clear Vegetation from Historic Lockhouse 52 Foundation |
|
|
Repair/Rehabilitation |
Ford Mine Loop Trail Completion |
|
|
Other |
Footbridge construction within Great Falls Hiking Trail Network |
|
|
Repair/Rehabilitation |
SHA Culvert Repairs |
|
|
Repair/Rehabilitation |
Burnside Property |
|
|
Other Maintenance Activities |
Mothball Knight House and Staub House |
|
|
Other Maintenance Activities |
Install "Mule Power" wayside exhibit |
|
|
Implementation Plan - Other |
Restoration and Recovery of Federally Endangered Harperalla |
|
|
Research Permit |
Boatramp Restroom Facilities |
|
|
Other Maintenance Activities |
2011 Canal Pride Days - Lock 10 Vegetation Removal Project |
|
|
Other Maintenance Activities |
Flagpole Installation at Williamsport Visitor Center |
|
|
Capital Improvement/New Construction |
USGS Potomac River Gauge Station - Edwards Ferry |
|
|
Special Use Permit |
29th Street Bridge Water Main |
|
|
Other Maintenance Activities |
Indigo Tunnel Bat Habitat - Installation of Bat Gates, Interim Closure |
|
|
Inventory and Monitoring |
Marlowe-Boonsboro Transmission Line Rebuild |
|
|
Other |
Inlet Lock #1 - Emergency Repairs - Flood 2010 |
|
|
Emergency Repair |
Capital Crescent Trail Erosion Repairs |
|
|
Other Maintenance Activities |
Cushwa Basin Wall Repair |
Photograph of wall failure |
|
Repair/Rehabilitation |
Historic Dams 4&5 Eelway Passage Project - Potomac River |
General Agreement Regarding Eel Ladder Construction, NPS, USFWS, and Maryland Historical Trust |
|
Other |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
NEWs release |
|
Right-of-Way Permit |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Previous Planning Documents |
|
Feasibility Study |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - 12-16 Update and Request to Continue Abeyance - USFS |
|
Right-of-Way Permit |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Final - Non-Motorized Boathouse Zone Feasibility Study |
|
Feasibility Study |
Potomac River Tunnel |
Potomac River Tunnel Newsletter #1 |
|
Other |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal NHP Revises Fee Proposal 2-6-2015 |
|
Fee Collection |
C&O Canal National Historical Park - Georgetown Canal Plan |
Georgetown Canal Plan Finding of No Significant Impact |
|
Development Concept Plan/Site Plan |
Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Transportation Upgrades - FONSI |
|
Capital Improvement/New Construction |
City of Cumberland Mill Race CSO |
Concurrence from Maryland Historical Trust |
|
Capital Improvement/New Construction |
Quantico Orienteering Club 2006 Orienteering Event - Special Use Permit Request (REVISED EVENT) |
|
|
Special Use Permit |
Lock 20 Bypass Flume Stabilization |
|
|
Other Maintenance Activities |
Paw Paw Tunnel Hill Trail Project |
|
|
Other Maintenance Activities |
Replace roof at Hancock Maintenance Facility |
|
|
Repair/Rehabilitation |
Arizona Avenue Bridge Damage Repair Project |
|
|
Other Maintenance Activities |
Four Locks Maintenance Complex Septic System Upgrades |
|
|
Repair/Rehabilitation |
Parking Lot Repairs, Dargan Bend Boatramp |
|
|
Repair/Rehabilitation |
Temporary Canal Loading Dock-Great Falls |
|
|
Other |
Remove Concession Stand at Lock 21 |
|
|
Other |
Install "Switching Time" wayside exhibit |
|
|
Implementation Plan - Other |
Preservation Repairs to Wasteweir # 3 at Flecthers |
Waste Weir # 3 |
|
Other Maintenance Activities |
Frederick County Water Intake Tree Removal Project |
Activity Details |
|
Other Maintenance Activities |
Frederick County Water Intake Sediment Removal Project |
Project drawings |
|
Other Maintenance Activities |
Split Swing Gates Installation (Parkwide) |
Best Management Practice for Gate Installation |
|
Other Maintenance Activities |
2009 Revision of Park Fire Management Plan |
2009 Chesapeake and Ohio Canal NHP Fire Management Plan |
|
Fire Management Plan |
Historic Dams 4&5 Eelway Passage Project - Potomac River |
Historic Dams 4 and 5 Eelway Passage Project, Finding of No Significant Impact January 2011 |
|
Other |
Georgetown Nonmotorized Boathouse Zone Development Plan |
Public Scoping Analysis Report |
|
Implementation Plan - Other |
Paved Trail Plan |
NCR Paved Trail Plan - final |
|
Trail Management Plan |
Palisades Maintenance Facility Improvements |
|
|
Other Maintenance Activities |
Billy Goat A Upstream Trailhead Re-route |
|
|
Other |
Informational Signs - Williamsport |
|
|
Other |
Lockhouse 8 Electric |
|
|
Repair/Rehabilitation |
Mary's Wall Vegetation Removal |
|
|
Other Maintenance Activities |
Removal of Non-contributing resource - Midriver Canoe Club Shed |
|
|
Other |
Liberty Tree |
|
|
Other |
Replace Stairway at Stopgate Milepost 13.7 |
|
|
Other Maintenance Activities |
SHA Bridge Painting SUP - I-495 |
|
|
Other |
Install Towpath Direction Signs at the 34th Street Bridge |
|
|
Other Maintenance Activities |
Preservation - Lockhouses 49, 37, 28, 22, and 6 |
|
|
Other Maintenance Activities |
Fiber Optic Right-of-Way, Route 15 |
|
|
Right-of-Way Permit |
Installation of New Potomac River Safety Signs |
|
|
Other |
Removal of Non-historic pedestrian bridges |
|
|
Repair/Rehabilitation |
Motion Picture Filming - Permit Request |
Special Use Permit Conditions |
|
Other |
Frederick County Water Intake Sediment Removal Project |
Project Activity Details |
|
Other Maintenance Activities |
Retaining Wall, 11900 River Road, Potomac, MD |
Public Scoping Comments |
|
Other Maintenance Activities |
Brunswick and Point of Rocks Boat Ramps |
Access Improvements to Point of Rocks, Brunswick, Fifteenmile Creek, and Monocacy Aqueduct. |
|
Other Maintenance Activities |
Potomac River Tunnel |
Potomac River Tunnel Project Study Area Map |
|
Other |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Fee Proposal Presentation (Updated February 9, 2015) |
|
Fee Collection |
C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
FONSI - White-tailed Deer Management Plan and EA for C&O Canal and Harpers Ferry National Historical Parks |
|
Ungulate Management Plan |
C&O Canal NHP Park Headquarters Relocation |
Finding of No Significant Impact (FONSI) |
|
Other Plan |
Potomac River Tunnel |
DC Clean Rivers Project - Potomac River Tunnel FONSI |
|
Other |
VIP Project - Routine Maintenance - Non-Historic Structures |
|
|
Routine Maintenance |
Installation of Park ID Signs |
|
|
Capital Improvement/New Construction |
Great Falls Entrance Station - Replacement in Kind |
|
|
Other Maintenance Activities |
Lock 44 Area Boundary Delineation |
|
|
Repair/Rehabilitation |
Chain Bridge Repair and Repainting |
|
|
Other Permit |
Mountain Lock Stock Pile Site |
|
|
Repair/Rehabilitation |
VIP Project - Parking Lots |
|
|
Other Maintenance Activities |
Billy Goat A Trail - Wooden Bridge Deck Replacement |
|
|
Other |
Install Potomac Heritage National Scenic Trail Wayside Exhibits |
|
|
Capital Improvement/New Construction |
Stone Steps - Lock 24 (Riley's Lock) |
|
|
Repair/Rehabilitation |
Install Potomac Gorge Wayside exhibits |
|
|
Capital Improvement/New Construction |
Canal Museum Exhibit, Cushwa Basin, Trolley Barn |
|
|
Other Maintenance Activities |
Install benches and sign for campfire program area - McCoy's Ferry |
|
|
Capital Improvement/New Construction |
Mule Paddock Shed - Great Falls |
|
|
Capital Improvement/New Construction |
Preservation- Lockhouse10 |
|
|
Other Maintenance Activities |
Mothball and Secure Uninhabited Historic Adams Buildings |
|
|
Repair/Rehabilitation |
Cleaning and Painting of Maryland State Highway Bridges - Routes 17, 340, Interstate 81 |
|
|
Other Maintenance Activities |
Sycamore Island Bridge - Repair and Repaint Project - Mile 6.46 |
|
|
Other Maintenance Activities |
Lock 6 Feeder Lock Trail Improvements |
|
|
Other Maintenance Activities |
Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge |
Exclosure Photo |
|
Research Permit |
Frederick County Water Intake Sediment Removal Project |
Section 404 Permit |
|
Other Maintenance Activities |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Public Scoping Comment Analysis Report - PATH EIS |
|
Right-of-Way Permit |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
PowerPoint Presentation from December 13, 2011 Meeting |
|
Feasibility Study |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH powerline project-NPS response to PATH-Final-Signed |
|
Right-of-Way Permit |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - 12-16 Update and Request to Continue Abeyance - NPS |
|
Right-of-Way Permit |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Frequently Asked Questions - Fee Proposal (Updated February 9, 2015) |
|
Fee Collection |
Redesign Entrance and Intersection at Fletcher's Cove |
Section 106 Meeting #1 Presentation |
|
Capital Improvement/New Construction |
Repair of the Potomac Interceptor sewage system - LZ09 and LZ03 |
Public Announcement |
|
Special Use Permit |
Lock 8 - Modification of Canoe Access to Potomac River |
|
|
Other |
Great Falls River Trail Maintenance |
|
|
Other Maintenance Activities |
PEPCO Powerline Hazard Vegetation Removal, Violette's Lock - Mile 22 |
|
|
Right-of-Way Permit |
Replacement Park Bench- Marsden Tract Area |
|
|
Repair/Rehabilitation |
Install new signage on hiking trails - Parkwide |
|
|
Other Maintenance Activities |
Appalachian Trail Signage on C&O Canal |
|
|
Other Maintenance Activities |
VIP Project - Trail Repairs |
|
|
Other Maintenance Activities |
Short Term Rockslide Mitigation (Paw Paw Rockslide) |
|
|
Resource Management Plan |
Storage Shed Removal, Swain's Lock, Mile 16.6 |
|
|
Other |
Mary's Wall Vegetation Removal, Part II |
|
|
Other Maintenance Activities |
Carderock Climbing Area Maintenance Project |
|
|
Other Maintenance Activities |
Pennyfield/Muddy Run Boatramp Replacement |
|
|
Repair/Rehabilitation |
Historic Prather (Weber) House Rehabilitation |
|
|
Other Maintenance Activities |
Carderock Access Pathway to Billy Goat Trail Section C |
|
|
Repair/Rehabilitation |
Jarboe Store Stabilization |
|
|
Other Maintenance Activities |
Carderock Siphon Cleaning - Fairfax County |
|
|
Other Maintenance Activities |
Mitigation of Beaver Dam at Culvert |
|
|
Other |
Repairs to Canal Prism and Canal Berm at Chain Bridge |
|
|
Other |
Hancock Visitor Center at the Little House |
|
|
Repair/Rehabilitation |
Temporary Antietam Iron Works Connector Trail |
|
|
Capital Improvement/New Construction |
New Site signs at Fletchers Cove |
Sign Locations |
|
Other Maintenance Activities |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Zone Constraints Map presented at 12/13/11 Public Meeting |
|
Feasibility Study |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - Request for Abeyance of NPS Review of ROW Applications |
|
Right-of-Way Permit |
Washington County - Sharpsburg Water Intake Upgrades |
Finding of No Significant Impact Sharpsburg Water Intake Upgrade |
|
Other |
Georgetown Nonmotorized Boathouse Zone Development Plan |
Presentation from February 4, 2015 Public Meeting |
|
Implementation Plan - Other |
Enhancing Visitor Experience at Hancock, MD, Mile 122.12-124.59 |
Finding of No Significant Impact-Restoration of Canal Operations at Hancock MP 122.12 to 124.59 |
|
Repair/Rehabilitation |
Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Public Meeting Presentation and Posters |
|
Other |
Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
WSSC Submerged Water Intake FONSI |
|
Other |
Columbia Gas/TransCanada - ROW Permit Application (8' Natural Gas Line) |
ROW Permit to Columbia Gas FONSI |
|
Right-of-Way Permit |
Improve Visitor Safety and Mitigate Rockfall Hazards in the Paw Paw Tunnel Hollow |
FONSI Improve Visitor Safety and Mitigate Rockfall Hazards In the Paw Paw Tunnel Hollow |
|
Other Maintenance Activities |
Release of biological control (knotweed psyllid) for Japanese knotweed management |
Finding of No Significant Impact (FONSI) |
|
Invasive Species Management |
Install Little Falls Fish Ladder wayside |
|
|
Other |
Campground, Picnic areas, Roadway, Parking Lot Repairs - Parkwide - Winter Storm and Flood 2010 |
|
|
Other Maintenance Activities |
Washington Canoe Club Perimeter Fence Removal |
|
|
Other Maintenance Activities |
Antietam Aqueduct Structural Investigation |
|
|
Other |
Provide Exotic Vegetation Management Control with SCA Partner |
|
|
Resource Management |
Sierra Club's MWROP Day Hike, April 28, 2007 |
|
|
Special Use Permit |
Repair Of Ferry Hill Trail |
|
|
Other |
Stabilize Paw Paw Tunnel and Boardwalk |
|
|
Other Maintenance Activities |
Historic Moore House Rehabilitation |
|
|
Other Maintenance Activities |
Vegetation Management at Lock 38/Bridgeport Area |
|
|
Repair/Rehabilitation |
Quantico Orienteering REVISED Event, February 4, 2007 |
|
|
Other |
Catoctin Aqueduct Overlook Trail |
|
|
Capital Improvement/New Construction |
Visitor Trail Counters on Bear Island Billy Goat Trail |
|
|
Other |
Preservation Lockhouse 25 |
|
|
Other Maintenance Activities |
Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge |
Deer Study Site Bulletin |
|
Research Permit |
Land Survey Work for Catoctin Power Plant Project |
Special Use Permit for Topographical Survey Work |
|
Other |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Posters for Public Scoping Meetings |
|
Right-of-Way Permit |
Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Public Scoping Summary Report |
|
Special Resource Study/New Area Study |
Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Letter to Joseph B. Nelson, Counsel to the PATH Companies-Signed by RD-NER-NCR2 |
|
Right-of-Way Permit |
Potomac Interceptor Long-Term Odor Abatement Program |
Potomac Interceptor Long-Term Odor Abatement Program |
|
Capital Improvement/New Construction |
Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Materials from March 3, 2012 Public Workshop |
|
Feasibility Study |
Potomac River Tunnel |
Federal Register Notice and Newspaper Ads |
|
Other |
Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Final Study Documents |
|
Special Resource Study/New Area Study |
Georgetown Nonmotorized Boathouse Zone Development Plan |
National Park Service Finalizes Plan for Georgetown Nonmotorized Boathouse Zone |
|
Implementation Plan - Other |
C&O Canal National Historical Park - Georgetown Canal Plan |
June 14, 2017 Public meeting - Georgetown Canal Plan |
|
Development Concept Plan/Site Plan |
Carderock Climbing Area Maintenance |
|
|
Other Maintenance Activities |
Culvert #182 Preservation |
|
|
Other Maintenance Activities |
SHA Bridge Painting SUP - Route 522 |
|
|
Other |
Relocate Pole Light at Antietam Campground |
|
|
Other |
Refurbishment of McCoy's Ferry Campground - 2011 C&O Canal Pride Days |
|
|
Other |
National Public Lands Day - Adopt-A-Crag Volunteer Project - Carderock Rehab |
|
|
Repair/Rehabilitation |
Traffic Counters |
|
|
Other Maintenance Activities |
Traffic Counters - Brunswick, Gift Road, Lock 75 |
|
|
Capital Improvement/New Construction |
Vegetation Removal from Historic Structures -Tidelock to Key Bridge |
|
|
Other Maintenance Activities |
Install Potomac Heritage Trail signs |
|
|
Capital Improvement/New Construction |
Vegetation Management at Dams # 4 and 5 |
|
|
Repair/Rehabilitation |
Fish Recovery - parkwide - Flood 2010 |
|
|
Other |
Fishing Fun Contest |
|
|
Other |
Site Prep for Modular Office Building Pal. Maint. Yard |
|
|
Other Maintenance Activities |
Refurbishment of the Paw Paw Tunnel Campground |
|
|
Other |
Programmatic Categorical Exclusion - Desiltation of Restored Watered Sections |
|
|
Other Maintenance Activities |
Billy Goat C Trail Maintenance |
Photographs of Proposed Work |
|
Other Maintenance Activities |
Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse EA Public Scoping Report, March 2005 |
|
Other |
Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Press Release for Environmental Impact Statement |
|
Other |
Potomac River Tunnel |
Public Scoping Meeting Display Boards |
|
Other |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Press Release-Updated Public Meetings Schedule 2-3-2015 |
|
Fee Collection |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal NHP Revises Fee Proposal |
|
Fee Collection |
C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Campground and Entrance Fee Comparables |
|
Fee Collection |
Emergency Rock Fall Mitigation at the Chesapeake & Ohio Canal (Paw Paw) |
Rock Fall Mitigation at the Chesapeake & Ohio Canal National Historical Park Environmental Assessment |
|
Emergency Repair |
Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan Executed FONSI |
|
Other Plan |
Reconstruct/Stabilize Historic Stone Wall & Towpath McMahon's Mill to Lock 42 |
Finding of No Significant Impact (FONSI) |
|
Repair/Rehabilitation |
City of Cumberland Mill Race CSO |
Finding of No Significant Impact (FONSI) |
|
Capital Improvement/New Construction |
White's Ferry Development Concept Plan |
White's Ferry Development Concept Plan (Final) |
|
Development Concept Plan/Site Plan |
2008 SCA Summer Trail Projects |
|
|
Repair/Rehabilitation |
Columbia Gas Line, City of Cumberland Waste Water Treatment Plant |
|
|
Right-of-Way Permit |
Reconstruction of Historic Stop Gate Winch House - Mile 13.74 |
|
|
Repair/Rehabilitation |
Pennyfield Fence Replacement-in-Kind |
|
|
Repair/Rehabilitation |
Ford Mine loop extension |
|
|
Other |
Standard Operating Procedure for Bench Placement - Parkwide |
|
|
Repair/Rehabilitation |
Stabilize Kretzer-Knode House and Outbuildings |
|
|
Other Maintenance Activities |
Programmatic Categorical Exclusion for Bicylce Rack Placements |
|
|
Other |
Lock 22 (Pennyfield) Visitor Access Bridge |
|
|
Repair/Rehabilitation |
Formalization of Rockwood loop and VFW spur |
|
|
Other |
Septic system repair, Mellott House, Four Locks, Mile 108.4 |
|
|
Repair/Rehabilitation |
Bassett Hound Walk for Charity, May 27, 2007 |
|
|
Special Use Permit |
2008 YCC Work Projects: Vegetation and Debris Removal |
|
|
Cultural Resource Management Plan |
Lock 20 Preservation |
|
|
Repair/Rehabilitation |
Visitation Counters – New Installation Locations |
|
|
Capital Improvement/New Construction |
Canal Pride Days 2009 |
|
|
Other Maintenance Activities |
Special Use Permit Programmatic Categorical Exclusion |
|
|
Special Use Permit |