Project Links
Appalachian National Scenic Trail » Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS » Document List » Document Contents
PATH EIS ROW permit scoping newsletter
We would like your comments on this federal lands permit project.
The comment period has been extended past the date noted in the newsletter due to technical delays. The extension will provide additional time to recieve public input.
Comment Period:
Closed
Jun 21, 2010 - Aug 20, 2010
|
Document Content: |
APPA, PATH EIS ROW Scoping Newsletter - June 2010
(1.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |