| New Sewer Line Great Falls Maintenance Facility |
New Sewer Line Great Falls Maintenance Facility Project documents |
Apr 06, 2006 |
| Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse Draft Environmental Assessment |
Jun 15, 2006 |
| Mulberry Tree Removal at the Georgetown Visitor Center |
Mulberry Tree Removal at the Georgetown Visitor Center |
Aug 14, 2006 |
| Catoctin Aqueduct |
Proposed Restoration of the Catoctin Aqueduct |
Nov 30, 2006 |
| New Design Raw Water Main and McKinney Treated Effluent Outfall |
Draft Environmental Assessment, November 2006 |
Nov 30, 2006 |
| Historic Dams 4&5 Eelway Passage Project - Potomac River |
Eelways - Historic Dams #4&5, Public Scoping Information |
Feb 10, 2007 |
| Retaining Wall, 11900 River Road, Potomac, MD |
Public Scoping Information |
Nov 30, 2007 |
| Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse/Land Transfer Notice of Intent/EIS |
Jan 18, 2008 |
| Catoctin Aqueduct |
Catoctin Aqueduct Restoration Draft Environmental Assessment |
Apr 14, 2008 |
| Historic Dams 4&5 Eelway Passage Project - Potomac River |
Proposed Eel Ladder Construction at Dams 4 and 5 on the Potomac River, Environmental Assessment / Assessment of Effects, November 2009 |
Jan 08, 2010 |
| Washington County - Sharpsburg Water Intake Upgrades |
Washington County - Sharpsburg Water Intake Upgrades Public Scoping Document |
Mar 09, 2010 |
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH EIS ROW permit scoping newsletter |
Aug 20, 2010 |
| Summit Hall Turf Farm Water Access Project |
Summit Hall Turf Farm Water Access Project Public Scoping Information |
Aug 20, 2010 |
| Summit Hall Turf Farm Water Access Project |
Summit Hall Turf Farm Water Access, Poolesville, Maryland, Environmental Assessment/Assessment of Effect July 2011 |
Aug 12, 2011 |
| Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Public Scoping Newsletter |
Mar 13, 2012 |
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Newsletter #1 - Feasibility Study for non-motorized boathouse zone |
Mar 30, 2012 |
| Washington County - Sharpsburg Water Intake Upgrades |
Sharpsburg Water Intake Upgrade Environmental Assessment/Assessment of Effect, March 2012 |
Apr 19, 2012 |
| Canal Place Heritage Area Management Plan Update and Chesapeake and Ohio Canal NHP Cumberland Boatyard and Rewatering EA |
Cumberland Boatyard and Rewatering EA - Public Scoping |
May 18, 2012 |
| Canal Place Heritage Area Management Plan Update and Chesapeake and Ohio Canal NHP Cumberland Boatyard and Rewatering EA |
Canal Place Heritage Area Management Plan Update - Public Scoping |
May 18, 2012 |
| Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Maps |
Apr 21, 2013 |
| Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Press Release |
Apr 21, 2013 |
| Canal Quarters Interpretive Program Environmental Assessment/Assessment of Effects |
Canal Quarters Interpretive Program Public Scoping Newsletter |
Apr 21, 2013 |
| Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Scoping for the Proposed Offshore Submerged Channel Intake |
Aug 18, 2013 |
| Potomac River Tunnel |
Potomac River Tunnel Project Scoping Comment Form |
Sep 02, 2014 |
| Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Shepherdstown Battlefield Special Resource Study/Boundary Study/Environmental Assessment |
Oct 03, 2014 |
| Enhancing Visitor Experience at Hancock, MD, Mile 122.12-124.59 |
Restoration of Canal Operations at Hancock MP 122.12 to 124.59 |
Oct 10, 2014 |
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal Invites Feedback on Proposal to Increase and Expand Entrance and Other Fees Park-wide |
Feb 22, 2015 |
| Potomac River Tunnel |
Potomac River Tunnel Section 106 |
Mar 06, 2015 |
| C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
Public Scoping Newsletter |
Mar 20, 2015 |
| Georgetown Nonmotorized Boathouse Zone Development Plan |
Preliminary Alternatives Newsletter |
Apr 10, 2015 |
| Nationwide Multi-Unit Fire Management Plan / Environmental Assessment |
Nationwide Multi-Unit Fire Management Plan / Environmental Assessment |
Apr 18, 2016 |
| Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Potomac Submerged Channel Intake Environmental Assessment and Assessment of Effect, July 2016 |
Sep 14, 2016 |
| Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan EA scoping |
Sep 16, 2016 |
| Georgetown Nonmotorized Boathouse Zone Development Plan |
Georgetown Nonmotorized Boathouse Zone Development Plan and Environmental Assessment |
Sep 30, 2016 |
| Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan/EA for four parks within the NCR |
May 12, 2017 |
| C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
White-tailed Deer Management Plan and Environmmental Assessment |
May 16, 2017 |
| C&O Canal National Historical Park - Georgetown Canal Plan |
November 2, 2017 Public meeting - Initial Design Concepts for the C&O Canal in Georgetown |
Jan 05, 2018 |
| Potomac River Tunnel |
Potomac River Tunnel EA |
Dec 04, 2018 |
| Reconstruct/Stabilize Historic Stone Wall & Towpath McMahon's Mill to Lock 42 |
Reconstruct/Stabilize The Historic Stone Wall and Towpath from McMahon's Mill to Lock 42 Environmental Assessment |
Feb 20, 2019 |
| C&O Canal NHP Park Headquarters Relocation |
Public Comment on Conceptual Plans |
Apr 24, 2019 |
| C&O Canal National Historical Park - Georgetown Canal Plan |
April 4, 2019 - Refined Design Concepts for the C&O Canal in Georgetown; Public Comment Period Now Open |
May 11, 2019 |
| Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Scoping Boards |
May 29, 2019 |
| C&O Canal NHP Park Headquarters Relocation |
Environmental Assessment |
Sep 09, 2019 |
| C&O Canal National Historical Park - Georgetown Canal Plan |
Georgetown Canal Plan Environmental Assessment |
Nov 16, 2019 |
| Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Transportation Upgrades Environmental Assessment |
Dec 13, 2019 |
| Improve Visitor Safety and Mitigate Rockfall Hazards in the Paw Paw Tunnel Hollow |
Environmental Assessment |
Jul 25, 2020 |
| City of Cumberland Mill Race CSO |
Environmental Assessment and Wetland Statement of Findings |
Oct 31, 2020 |
| Repair of the Potomac Interceptor sewage system - LZ09 and LZ03 |
Project Information |
Jul 03, 2022 |
| White's Ferry Development Concept Plan |
Public Scoping for White's Ferry Plan |
Nov 12, 2022 |
| Great Falls (MD) Development Concept Plan |
Comment Period #1 - Great Falls DCP Issues and Opportunities |
Sep 29, 2023 |
| Great Falls (MD) Development Concept Plan |
Comment Period #2 - Great Falls DCP Management Concepts |
Jul 28, 2025 |
| Motion Picture Filming - Permit Request |
Section 404 Permit |
|
| New Design Raw Water Main and McKinney Treated Effluent Outfall |
Finding of No Significant Impact, New Design Raw Water Main and Treated Effluent Outfall, Chesapeake and Ohio Canal National Historical Park, August 2007 |
|
| Catoctin Aqueduct |
Catoctin Aqueduct Restoration Finding of No Significant Impact |
|
| Historic Dams 4&5 Eelway Passage Project - Potomac River |
Public Scoping Comments Regarding Proposed Eelway Passage Project at historic Dams 4 and 5 on the Potomac River |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Notice of Intent (NOI) to prepare the EIS |
|
| Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Battle History Presentation |
|
| Emergency Rock Fall Mitigation at the Chesapeake & Ohio Canal (Paw Paw) |
FINDING OF NO SIGNIFICANT IMPACT ROCK FALL MITIGATION Oldtown, Maryland |
|
| Redesign Entrance and Intersection at Fletcher's Cove |
Section 106 Meeting #2 Presentation |
|
| Clear Vegetation from Historic Lockhouse 52 Foundation |
|
|
| Ford Mine Loop Trail Completion |
|
|
| Footbridge construction within Great Falls Hiking Trail Network |
|
|
| SHA Culvert Repairs |
|
|
| Burnside Property |
|
|
| Mothball Knight House and Staub House |
|
|
| Install "Mule Power" wayside exhibit |
|
|
| Restoration and Recovery of Federally Endangered Harperalla |
|
|
| Boatramp Restroom Facilities |
|
|
| 2011 Canal Pride Days - Lock 10 Vegetation Removal Project |
|
|
| Flagpole Installation at Williamsport Visitor Center |
|
|
| USGS Potomac River Gauge Station - Edwards Ferry |
|
|
| 29th Street Bridge Water Main |
|
|
| Indigo Tunnel Bat Habitat - Installation of Bat Gates, Interim Closure |
|
|
| Marlowe-Boonsboro Transmission Line Rebuild |
|
|
| Inlet Lock #1 - Emergency Repairs - Flood 2010 |
|
|
| Capital Crescent Trail Erosion Repairs |
|
|
| Cushwa Basin Wall Repair |
Photograph of wall failure |
|
| Historic Dams 4&5 Eelway Passage Project - Potomac River |
General Agreement Regarding Eel Ladder Construction, NPS, USFWS, and Maryland Historical Trust |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
NEWs release |
|
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Previous Planning Documents |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - 12-16 Update and Request to Continue Abeyance - USFS |
|
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Final - Non-Motorized Boathouse Zone Feasibility Study |
|
| Potomac River Tunnel |
Potomac River Tunnel Newsletter #1 |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal NHP Revises Fee Proposal 2-6-2015 |
|
| C&O Canal National Historical Park - Georgetown Canal Plan |
Georgetown Canal Plan Finding of No Significant Impact |
|
| Redesign Entrance and Intersection at Fletcher's Cove |
Fletcher's Boathouse Transportation Upgrades - FONSI |
|
| City of Cumberland Mill Race CSO |
Concurrence from Maryland Historical Trust |
|
| Quantico Orienteering Club 2006 Orienteering Event - Special Use Permit Request (REVISED EVENT) |
|
|
| Lock 20 Bypass Flume Stabilization |
|
|
| Paw Paw Tunnel Hill Trail Project |
|
|
| Replace roof at Hancock Maintenance Facility |
|
|
| Arizona Avenue Bridge Damage Repair Project |
|
|
| Four Locks Maintenance Complex Septic System Upgrades |
|
|
| Parking Lot Repairs, Dargan Bend Boatramp |
|
|
| Temporary Canal Loading Dock-Great Falls |
|
|
| Remove Concession Stand at Lock 21 |
|
|
| Install "Switching Time" wayside exhibit |
|
|
| Preservation Repairs to Wasteweir # 3 at Flecthers |
Waste Weir # 3 |
|
| Frederick County Water Intake Tree Removal Project |
Activity Details |
|
| Frederick County Water Intake Sediment Removal Project |
Project drawings |
|
| Split Swing Gates Installation (Parkwide) |
Best Management Practice for Gate Installation |
|
| 2009 Revision of Park Fire Management Plan |
2009 Chesapeake and Ohio Canal NHP Fire Management Plan |
|
| Historic Dams 4&5 Eelway Passage Project - Potomac River |
Historic Dams 4 and 5 Eelway Passage Project, Finding of No Significant Impact January 2011 |
|
| Georgetown Nonmotorized Boathouse Zone Development Plan |
Public Scoping Analysis Report |
|
| Paved Trail Plan |
NCR Paved Trail Plan - final |
|
| Palisades Maintenance Facility Improvements |
|
|
| Billy Goat A Upstream Trailhead Re-route |
|
|
| Informational Signs - Williamsport |
|
|
| Lockhouse 8 Electric |
|
|
| Mary's Wall Vegetation Removal |
|
|
| Removal of Non-contributing resource - Midriver Canoe Club Shed |
|
|
| Liberty Tree |
|
|
| Replace Stairway at Stopgate Milepost 13.7 |
|
|
| SHA Bridge Painting SUP - I-495 |
|
|
| Install Towpath Direction Signs at the 34th Street Bridge |
|
|
| Preservation - Lockhouses 49, 37, 28, 22, and 6 |
|
|
| Fiber Optic Right-of-Way, Route 15 |
|
|
| Installation of New Potomac River Safety Signs |
|
|
| Removal of Non-historic pedestrian bridges |
|
|
| Motion Picture Filming - Permit Request |
Special Use Permit Conditions |
|
| Frederick County Water Intake Sediment Removal Project |
Project Activity Details |
|
| Retaining Wall, 11900 River Road, Potomac, MD |
Public Scoping Comments |
|
| Brunswick and Point of Rocks Boat Ramps |
Access Improvements to Point of Rocks, Brunswick, Fifteenmile Creek, and Monocacy Aqueduct. |
|
| Potomac River Tunnel |
Potomac River Tunnel Project Study Area Map |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Fee Proposal Presentation (Updated February 9, 2015) |
|
| C&O Canal NHP and Harpers Ferry NHP Deer Management Plan and EA |
FONSI - White-tailed Deer Management Plan and EA for C&O Canal and Harpers Ferry National Historical Parks |
|
| C&O Canal NHP Park Headquarters Relocation |
Finding of No Significant Impact (FONSI) |
|
| Potomac River Tunnel |
DC Clean Rivers Project - Potomac River Tunnel FONSI |
|
| VIP Project - Routine Maintenance - Non-Historic Structures |
|
|
| Installation of Park ID Signs |
|
|
| Great Falls Entrance Station - Replacement in Kind |
|
|
| Lock 44 Area Boundary Delineation |
|
|
| Chain Bridge Repair and Repainting |
|
|
| Mountain Lock Stock Pile Site |
|
|
| VIP Project - Parking Lots |
|
|
| Billy Goat A Trail - Wooden Bridge Deck Replacement |
|
|
| Install Potomac Heritage National Scenic Trail Wayside Exhibits |
|
|
| Stone Steps - Lock 24 (Riley's Lock) |
|
|
| Install Potomac Gorge Wayside exhibits |
|
|
| Canal Museum Exhibit, Cushwa Basin, Trolley Barn |
|
|
| Install benches and sign for campfire program area - McCoy's Ferry |
|
|
| Mule Paddock Shed - Great Falls |
|
|
| Preservation- Lockhouse10 |
|
|
| Mothball and Secure Uninhabited Historic Adams Buildings |
|
|
| Cleaning and Painting of Maryland State Highway Bridges - Routes 17, 340, Interstate 81 |
|
|
| Sycamore Island Bridge - Repair and Repaint Project - Mile 6.46 |
|
|
| Lock 6 Feeder Lock Trail Improvements |
|
|
| Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge |
Exclosure Photo |
|
| Frederick County Water Intake Sediment Removal Project |
Section 404 Permit |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Public Scoping Comment Analysis Report - PATH EIS |
|
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
PowerPoint Presentation from December 13, 2011 Meeting |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH powerline project-NPS response to PATH-Final-Signed |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - 12-16 Update and Request to Continue Abeyance - NPS |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Frequently Asked Questions - Fee Proposal (Updated February 9, 2015) |
|
| Redesign Entrance and Intersection at Fletcher's Cove |
Section 106 Meeting #1 Presentation |
|
| Repair of the Potomac Interceptor sewage system - LZ09 and LZ03 |
Public Announcement |
|
| Lock 8 - Modification of Canoe Access to Potomac River |
|
|
| Great Falls River Trail Maintenance |
|
|
| PEPCO Powerline Hazard Vegetation Removal, Violette's Lock - Mile 22 |
|
|
| Replacement Park Bench- Marsden Tract Area |
|
|
| Install new signage on hiking trails - Parkwide |
|
|
| Appalachian Trail Signage on C&O Canal |
|
|
| VIP Project - Trail Repairs |
|
|
| Short Term Rockslide Mitigation (Paw Paw Rockslide) |
|
|
| Storage Shed Removal, Swain's Lock, Mile 16.6 |
|
|
| Mary's Wall Vegetation Removal, Part II |
|
|
| Carderock Climbing Area Maintenance Project |
|
|
| Pennyfield/Muddy Run Boatramp Replacement |
|
|
| Historic Prather (Weber) House Rehabilitation |
|
|
| Carderock Access Pathway to Billy Goat Trail Section C |
|
|
| Jarboe Store Stabilization |
|
|
| Carderock Siphon Cleaning - Fairfax County |
|
|
| Mitigation of Beaver Dam at Culvert |
|
|
| Repairs to Canal Prism and Canal Berm at Chain Bridge |
|
|
| Hancock Visitor Center at the Little House |
|
|
| Temporary Antietam Iron Works Connector Trail |
|
|
| New Site signs at Fletchers Cove |
Sign Locations |
|
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Zone Constraints Map presented at 12/13/11 Public Meeting |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
PATH - Request for Abeyance of NPS Review of ROW Applications |
|
| Washington County - Sharpsburg Water Intake Upgrades |
Finding of No Significant Impact Sharpsburg Water Intake Upgrade |
|
| Georgetown Nonmotorized Boathouse Zone Development Plan |
Presentation from February 4, 2015 Public Meeting |
|
| Enhancing Visitor Experience at Hancock, MD, Mile 122.12-124.59 |
Finding of No Significant Impact-Restoration of Canal Operations at Hancock MP 122.12 to 124.59 |
|
| Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
Public Meeting Presentation and Posters |
|
| Proposed Offshore Submerged Channel Intake for WSSC Potomac Water Plant |
WSSC Submerged Water Intake FONSI |
|
| Columbia Gas/TransCanada - ROW Permit Application (8' Natural Gas Line) |
ROW Permit to Columbia Gas FONSI |
|
| Improve Visitor Safety and Mitigate Rockfall Hazards in the Paw Paw Tunnel Hollow |
FONSI Improve Visitor Safety and Mitigate Rockfall Hazards In the Paw Paw Tunnel Hollow |
|
| Release of biological control (knotweed psyllid) for Japanese knotweed management |
Finding of No Significant Impact (FONSI) |
|
| Install Little Falls Fish Ladder wayside |
|
|
| Campground, Picnic areas, Roadway, Parking Lot Repairs - Parkwide - Winter Storm and Flood 2010 |
|
|
| Washington Canoe Club Perimeter Fence Removal |
|
|
| Antietam Aqueduct Structural Investigation |
|
|
| Provide Exotic Vegetation Management Control with SCA Partner |
|
|
| Sierra Club's MWROP Day Hike, April 28, 2007 |
|
|
| Repair Of Ferry Hill Trail |
|
|
| Stabilize Paw Paw Tunnel and Boardwalk |
|
|
| Historic Moore House Rehabilitation |
|
|
| Vegetation Management at Lock 38/Bridgeport Area |
|
|
| Quantico Orienteering REVISED Event, February 4, 2007 |
|
|
| Catoctin Aqueduct Overlook Trail |
|
|
| Visitor Trail Counters on Bear Island Billy Goat Trail |
|
|
| Preservation Lockhouse 25 |
|
|
| Assess Impacts of Deer/Invasive Plant Interactions on Native Vegetation at Potomac Gorge |
Deer Study Site Bulletin |
|
| Land Survey Work for Catoctin Power Plant Project |
Special Use Permit for Topographical Survey Work |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Posters for Public Scoping Meetings |
|
| Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Public Scoping Summary Report |
|
| Potomac-Appalachian Transmission Highline (PATH) Right-of-Way EIS |
Letter to Joseph B. Nelson, Counsel to the PATH Companies-Signed by RD-NER-NCR2 |
|
| Potomac Interceptor Long-Term Odor Abatement Program |
Potomac Interceptor Long-Term Odor Abatement Program |
|
| Feasilibity Study To Implement A Non-Motorized Boathouse Zone Along The Georgetown Waterfront |
Materials from March 3, 2012 Public Workshop |
|
| Potomac River Tunnel |
Federal Register Notice and Newspaper Ads |
|
| Shepherdstown Battlefield Special Resource Study/Environmental Assessment |
Final Study Documents |
|
| Georgetown Nonmotorized Boathouse Zone Development Plan |
National Park Service Finalizes Plan for Georgetown Nonmotorized Boathouse Zone |
|
| C&O Canal National Historical Park - Georgetown Canal Plan |
June 14, 2017 Public meeting - Georgetown Canal Plan |
|
| Carderock Climbing Area Maintenance |
|
|
| Culvert #182 Preservation |
|
|
| SHA Bridge Painting SUP - Route 522 |
|
|
| Relocate Pole Light at Antietam Campground |
|
|
| Refurbishment of McCoy's Ferry Campground - 2011 C&O Canal Pride Days |
|
|
| National Public Lands Day - Adopt-A-Crag Volunteer Project - Carderock Rehab |
|
|
| Traffic Counters |
|
|
| Traffic Counters - Brunswick, Gift Road, Lock 75 |
|
|
| Vegetation Removal from Historic Structures -Tidelock to Key Bridge |
|
|
| Install Potomac Heritage Trail signs |
|
|
| Vegetation Management at Dams # 4 and 5 |
|
|
| Fish Recovery - parkwide - Flood 2010 |
|
|
| Fishing Fun Contest |
|
|
| Site Prep for Modular Office Building Pal. Maint. Yard |
|
|
| Refurbishment of the Paw Paw Tunnel Campground |
|
|
| Programmatic Categorical Exclusion - Desiltation of Restored Watered Sections |
|
|
| Billy Goat C Trail Maintenance |
Photographs of Proposed Work |
|
| Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Georgetown University Boathouse EA Public Scoping Report, March 2005 |
|
| Georgetown University Boathouse/Land Transfer Environmental Impact Statement |
Press Release for Environmental Impact Statement |
|
| Potomac River Tunnel |
Public Scoping Meeting Display Boards |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Press Release-Updated Public Meetings Schedule 2-3-2015 |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
C&O Canal NHP Revises Fee Proposal |
|
| C&O Canal Invites Feedback on Proposal to Increase Entrance and Other Fees |
Campground and Entrance Fee Comparables |
|
| Emergency Rock Fall Mitigation at the Chesapeake & Ohio Canal (Paw Paw) |
Rock Fall Mitigation at the Chesapeake & Ohio Canal National Historical Park Environmental Assessment |
|
| Wetland Restoration Action Plan (WRAP) & Environmental Assessment for Four NCR Parks: Chesapeake & Ohio Canal National Historical Park (CHOH), Monocacy National Battlefield (MONO), Harpers Ferry National Historical Park (HAFE) and Catoctin Mountain Park (CATO) |
Wetland Restoration Action Plan Executed FONSI |
|
| Reconstruct/Stabilize Historic Stone Wall & Towpath McMahon's Mill to Lock 42 |
Finding of No Significant Impact (FONSI) |
|
| City of Cumberland Mill Race CSO |
Finding of No Significant Impact (FONSI) |
|
| White's Ferry Development Concept Plan |
White's Ferry Development Concept Plan (Final) |
|
| 2008 SCA Summer Trail Projects |
|
|
| Columbia Gas Line, City of Cumberland Waste Water Treatment Plant |
|
|
| Reconstruction of Historic Stop Gate Winch House - Mile 13.74 |
|
|
| Pennyfield Fence Replacement-in-Kind |
|
|
| Ford Mine loop extension |
|
|
| Standard Operating Procedure for Bench Placement - Parkwide |
|
|
| Stabilize Kretzer-Knode House and Outbuildings |
|
|
| Programmatic Categorical Exclusion for Bicylce Rack Placements |
|
|
| Lock 22 (Pennyfield) Visitor Access Bridge |
|
|
| Formalization of Rockwood loop and VFW spur |
|
|
| Septic system repair, Mellott House, Four Locks, Mile 108.4 |
|
|
| Bassett Hound Walk for Charity, May 27, 2007 |
|
|
| 2008 YCC Work Projects: Vegetation and Debris Removal |
|
|
| Lock 20 Preservation |
|
|
| Visitation Counters – New Installation Locations |
|
|
| Canal Pride Days 2009 |
|
|
| Special Use Permit Programmatic Categorical Exclusion |
|
|