Damage from flooding from February 9, 2014 storm.

2015_16 Flood Repairs Project Drawings


Drawings of the repairs being made to the north parking lot stormwater drain outlet before the 2015-2016 storm season. Project will start construction the middle of October 2015.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.