Project Links
Perform Flood Repairs, Stinson Beach
Golden Gate National Recreation Area » Perform Flood Repairs, Stinson Beach » Document List
This project would repair the damages caused by the February 9th flood.
Proposed Actions:
• Repair the erosion scarp in the north parking lot
• Re‐configure degraded dune at north parking lot
• Create a new flood discharge location
• Create a new access path to beach, including a new access corridor for dogs on leash to Upton Beach (Marin County)
• Repair pedestrian pathway
• Park repairs will be designed so as not to increase flooding in surrounding areas
Update (September/October 2015)
The project referenced above was completed prior to the 2014/15 rainy season. Additional repairs are being done before the 2015/16 rainy season. Drawings and technical reports of these repairs can be found in the documents tab.
Contact Information
Questions on the Repair can be directed to:goga_planning@nps.gov
or
Mia Monroe 415-561-4964