Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
Booth Fishery 1898 - Barnum Island

Duluth Workshop: Feb.17, 2011


Please review and comment on the following documents:
1: Workshop Presentation (6 Sections)
2: Workshop Memorandum

Please take time to answer a brief questionnaire regarding potential management options for Washington and Barnum Islands. You may address these questions directly or submit separate questions and/or comments of your own.
 
Comment Period: Closed        Mar 4, 2011 - Mar 20, 2011
Topic Questions Instructions:
You may address these questions directly or submit separate questions and/or comments of your own. Please be specific by numbering your responses to match the corresponding question.
Topic Questions:
1. Are there additional management issues that need to be addressed by the project?
2. Are there additional landscape treatment concepts that should be considered? Please provide as much detail as possible.
3. Are there aspects of the six treatment concepts described in the powerpoint that you support or do not support? Please provide as much detail as possible, indicating the aspects that you agree with or disagree with, and why.
Document Content:
Section 1: Introduction to ProjectSection 1: Introduction to Project   (898.8 KB, PDF file)
Section 2: Landscape HistorySection 2: Landscape History   (2.5 MB, PDF file)
Section 3: Washington Island HistorySection 3: Washington Island History   (5.7 MB, PDF file)
Section 4: Barnum Island HistorySection 4: Barnum Island History   (3.5 MB, PDF file)
Duluth Workshop MemorandumDuluth Workshop Memorandum   (40.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.