Public Review of EA


The public is invited to comment on a proposal for repair and reroute of a portion of the lower Thunder Creek Trail, relocation of a hiker camp, and creation of an administrative camp along the trail. The entire project is proposed within the Stephen Mather Wilderness. The purpose of this action is to minimize the impacts of hiker and stock use along the trail, thereby preserving the character of the designated wilderness.

Per the requirements of the National Environmental Policy Act, the environmental impacts of the proposed project and a no action alternative have been analyzed through an Environmental Assessment (EA) to help determine whether the National Park Service should carry out the proposed action.

All comments on the EA are welcome, particularly those that assess the adequacy of the document in disclosing and evaluating the effects on the environment or identify mitigation to the proposed action.

To review the EA you can download the document at the link below. To provide electronic comments click the "Comment Now" button. Comments will be accepted June 15 through July 14, 2020. Hardcopy comments can be mailed to: Superintendent, 810 State Route 20, Sedro Woolley, WA 98284.
 
Comment Period: Closed        Jun 15, 2020 - Jul 14, 2020
Document Content:
ThunderCrReloEA_Final.pdf   (1.4 MB, PDF file)
Appendices_ThunderCrReloEA.pdf   (1.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.