PEPC and Parkplanning will have an outage from 5 PM to 10 PM MT on July 19th due to network maintenance. Please plan and save your work accordingly.

SHIL National Cemetery Wall Rehab PMIS Project


This document will describe the present structural issues with the 70-year-old brick wall on the west side of the Shiloh National Cemetery and how park staff proposed to demolish, repair, and rehabilitate the wall.
 
Comment Period: Closed        Nov 10, 2016 - Dec 10, 2016
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.