PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

SHIL National Cemetery Wall Rehab PMIS Project


This document will describe the present structural issues with the 70-year-old brick wall on the west side of the Shiloh National Cemetery and how park staff proposed to demolish, repair, and rehabilitate the wall.
 
Comment Period: Closed        Nov 10, 2016 - Dec 10, 2016
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.