Upcoming Outage: PEPC and Parkplanning will be offline on Weds., Sept. 11th, starting at 7 AM MT for routine maintenance. The expected downtime for Parkplanning is fifteen minutes, while PEPC will remain offline for up to two hours. Please plan and save your work accordingly.

Errata to the CALO Draft ORV Mgmt Plan/DEIS


Attached below are corrections to the Cape Lookout Draft ORV Management Plan / DEIS, released on May 14, 2014, and open for public comment through July 21, 2014.
 
Document Content:
Errata Alternative A NCB map 1 of 3.pdf   (594.8 KB, PDF file)
Errata Alternative B NCB map 1 of 3.pdf   (914.4 KB, PDF file)
Errata Alternative C NCB map 1 of 3.pdf   (923.4 KB, PDF file)
Errata Alternative C SCB map 3 of 3.pdf   (796.7 KB, PDF file)
Errata Alternative D NCB map 1 of 3.pdf   (994.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.