Project Links
Pacific West Regional Office » Rim of the Valley Corridor Special Resource Study » Document List » Document Contents
Rim of the Valley Corridor SRS Newsletter #3 Fall 2012, Boletin #3, Otono 2012
This newsletter includes preliminary findings and alternative concepts for the Rim of the Valley Corridor Special Resource Study. The NPS would like your feed back on the findings and alternative concepts to complete our analysis and create a range of feasible alternatives for the draft study report. Dates and locations for a series of public workshops in November and December, 2012 are also included. Check our website for updates or sign-up for e-mail alerts at www.nps.gov/pwro/rimofthevalley.
Comment Period:
Closed
Oct 22, 2012 - Jan 7, 2013
|
Document Content: |
Rim of the Valley Corridor SRS Newsletter #3
(1.6 MB, PDF file)
Boletin Informativo #3, Otono 2012
(1.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |