Project Links
Everglades National Park » Tamiami Trail Modifications: Next Steps Project/EIS » Document List » Document Contents
EVER Tamiami Trail Modifications: Next Steps / Draft Environmental Impact Statement - April 2010
EVER Tamiami Trail Modifications: Next Steps / Draft Environmental Impact Statement - April 2010. Draft document and Appendixes for public review.
Comment Period:
Closed
May 25, 2010 - Jul 27, 2010
|
Document Content: |
Tamiami Trail: Next Steps DEIS: Main Body
(4.6 MB, PDF file)
Tamiami Trail: Next Steps DEIS: Appendix A- Engineering Report
(12.7 MB, PDF file)
Tamiami Trail: Next Steps DEIS: Appendix C- Wetlands Statement of Findings
(1.5 MB, PDF file)
Tamiami Trail: Next Steps DEIS: Appendix D- Floodplains Statement of Findings
(330.2 KB, PDF file)
Tamiami Trail: Next Steps DEIS: Appendix F- Socioeconomic Report
(389.2 KB, PDF file)
Tamiami Trail: Next Steps DEIS: Appendix G- Real Estate Report
(34.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |