PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Maps of the Study Areas


The following files include detailed maps of the park's existing boundary, the Boundary Study areas, and H.R. 4438 proposed boundary modification areas. A key to the maps is included.
 
Document Content:
Working Map Key April 2010   (2.4 MB, PDF file)
NPS Study Areas from Headwaters to Rancho   (231.6 KB, Image file)
Headwaters of the San Antonio River   (297.1 KB, PDF file)
Valero Acequia in Former Playland Park   (247.5 KB, PDF file)
San Pedro Park Area   (215.8 KB, PDF file)
Downtown Area   (311.5 KB, PDF file)
Mission Concepcion   (334.6 KB, PDF file)
Mission San Jose   (301.2 KB, PDF file)
Mission San Juan   (251.9 KB, PDF file)
Mission Espada   (264.6 KB, PDF file)
Loop 1604 River Access   (983.9 KB, PDF file)
FM 775 River Access   (1.0 MB, PDF file)
Rancho de las Cabras Area   (1.4 MB, PDF file)
Mission Trail and National Parkway Concept   (344.4 KB, Image file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.