Environmental Assessment


Final environmental assessment for the replacement of existing electric power lines and structures.
 
Comment Period: Closed        Mar 18, 2009 - May 11, 2009
Document Content:
EA for Powerline   (2.0 MB, PDF file)
Appendix A final   (1.2 MB, PDF file)
appendix B 1-30   (4.5 MB, PDF file)
Appendix B 31-70   (2.9 MB, PDF file)
Appendix B 71-107   (3.3 MB, PDF file)
Appendix C   (369.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.