Project Links
Anacostia Park » Prepare and Initiate Wetland Management Plan & EIS (w/ Resident Goose Mgmt. Strategies) » Document List » Document Contents
Alternatives Newsletter Public Comment Analysis
We have attached the comments received on our Alternatives Newsletter. All comments received have been considered during the development of Chapter 2, Alternatives.
![]() |
Document Content: |
Alternatives Comment Analysis Report
(287.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |