Project Links
John Muir National Historic Site » Mt. Wanda Comprehensive Site Management Plan » Document List » Document Contents
November 2023 - Finding of No Significant Impact
The National Park Service (NPS) is pleased to announce the release of the Comprehensive Site Management Plan (CSMP) for the Mt. Wanda unit at John Muir National Historic Site. The plan identifies new visitor opportunities, addresses facility needs, provides long-term resource management strategies, and recommends improvements for the connectivity of Mt. Wanda to other areas of the park and the broader community.
In May of 2023, the National Park Service released the Mt. Wanda Comprehensive Site Management Plan/Environmental Assessment (CSMP/EA). After thorough consideration of the potential for environmental impacts and the comments received, the NPS determined a full environmental impact statement (EIS) was not needed and has released the plan with an associated Finding of No Significant Impact (FONSI).
The FONSI document below includes the following content:
1. Introduction
2. Selected Alternative and Rationale for the Decision
3. Mitigation Measures
4. Agency Consultation
5. Finding of No Significant Impact
6. Conclusion
Appendix A: Errata Indicating Text Changes to EA
Appendix B: Response to Substantive Public Comments
Appendix C: Non-Impairment Determination
Appendix D: Mitigation Measures
Appendix E: Biological Assessment Concurrence Letter
You can find the FONSI available for download under "Document Content" below.
Document Content: |
JOMU_Mt-Wanda-CSMP_FONSI_Final-Signed_20231114.pdf
(1.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |